    Oh don't get me wrong, we should definitely build a carriage shed! But I think we should build one with a primary purpose of it being used all year round.

    A carriage shed is certainly near the top of the generally agreed priority investment list, all of which is being formalised currently into something a bit more meaningful. But to answer your question, apart from various bridge and other civils works, the other big ticket item on the agenda is sorting out the former garden centre site at Toddington. Firstly just to make it a pleasant entrance as it gives a terrible impression at the moment, and longer term consideration to a proper visitor centre type building.
     
    Jamessquared likes this.
  2. SVR C&W

    SVR C&W New Member

    Joined:
    Feb 18, 2026
    Messages:
    18
    Likes Received:
    93
    Gender:
    Male
    Location:
    Kidderminster
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There in lies the problem for most heritage railwats. What do you prioritise capital expenditure on. There are 3 things that should always have the strongest budget in my eyes. Infrastructure, Locos and carriages. Without any of them, you cant run a railway.

    Forgive me for my ignorance/ lack of knowledge of the Winchcombe site. I have only visited the C&W during events. Is there not room on the south side of the works to install a carriage shed/ stable/ half side barn type building? Im guessing the formation on the north side of the embankment isnt stable enough to realign the pointwork and utilise the former double track formation for a headshunt?
     
  3. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    Joined:
    Sep 9, 2013
    Messages:
    10,938
    Likes Received:
    19,759
    Gender:
    Male
    Location:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There is physically room on the South side land-wise for a shed. But there's a lot of stuff in the way, and the track layout would have to be totally re-organised and half the north half of Winchcombe would have to be re-signalled with a new turnout off the mainline. And you'd still need to build it on a curve to make it fit. I'm not sure off the top of my head on the viability of a headshunt onto the embankment - at the moment the mainline is towards the down side but possibly not all the way, it would certainly start to get a bit tight before you'd start getting worried about being too close to the edge of the embankment either side in its current condition.
     