If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

North Yorkshire Moors Railway General Discussion

Discussion in 'Heritage Railways & Centres in the UK' started by The Black Hat, Feb 13, 2011.

  1. 47406

    47406 Well-Known Member

    Joined:
    Oct 24, 2006
    Messages:
    1,475
    Likes Received:
    234
    Gender:
    Male
    Location:
    Durham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    31128 replaces 44806

    loco-16092026-v3.pdf
     
  2. Lineisclear

    Lineisclear Well-Known Member

    Joined:
    May 24, 2020
    Messages:
    1,588
    Likes Received:
    1,533
    Gender:
    Male
    Location:
    Worcestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    My earlier abortive post was indeed finger trouble! Apologies.

    I must correct two mistakes by others in recent posts. Firstly I am not a representative of the NYMR. Since resigning as Trustee I can post on here in a purely personal capacity. Second the old canard of 17 marketing people keeps getting trotted out. It’s not true, There are around five most.


    It’s very telling when individuals post on the basis that “ I’ve been told that” . All sorts of rumour may be around some of it very remote from the true facts. The nonsense about Bridge 42 is a good example. It was well known that the Bridge needed remedial work but an independent engineering consultant’s assessment in 2025 was that it was safe to use on the basis that the work would be done over the winter of 2026/7. That consultancy firm has since gone out of business. Despite an extensive search the railway was unable to attract a suitably qualified and experienced volunteer civil engineer. That’s not a new problem. It also proved impossible to recruit an employee at a salary the railway could afford. The short term solution was to retain the services of an independent contractor who quite reasonably wanted to verify that the consultant’s advice was sound. A second opinion from different experts indicated that use of the bridge should be halted immediately. The more detailed inspection that has been possible (because propping has given better access) confirmed the wisdom of that opinion.
    The railway was fortunate to have the services of a contractor with the guts to recommend immediate closure until the bridge could be propped despite the huge opprobrium heaped on him for what was inevitably an unpopular decision.

    Unfortunately the facts don’t fit the narrative of those that prefer to rely on rumour. If, as suggested the marketing department are expected to monitor social media and correct the misunderstandings of those who have just been told something then a headcount of 17 might indeed be justified!
     
  3. D7076

    D7076 Well-Known Member

    Joined:
    Dec 21, 2007
    Messages:
    1,648
    Likes Received:
    790
    There is no NELPG weekend .2392 only loco that would be available.
    D6700 once featured at a steam gala when 60163 arrived in steam and was duly failed by the shed on arrival .
     
    MellishR likes this.
  4. MellishR

    MellishR Resident of Nat Pres Friend

    Joined:
    Apr 16, 2009
    Messages:
    9,482
    Likes Received:
    6,296
    Thank you for several invaluable clarifications. I was probably not the only one here unaware of your resigning as Trustee.

    It is reassuring that there are nowhere near 17 marketing people, but even one or two should be enough to prevent most of the silliness that has been reported in this thread.
     

Share This Page