Bridge that Gap: Great Central Railway News

Discussion in 'Heritage Railways & Centres in the UK' started by Gav106, May 8, 2010.

  1. brmp201

    brmp201 Member

    Joined:
    May 18, 2010
    Messages:
    681
    Likes Received:
    1,090
    Gender:
    Male
    Occupation:
    IT Director
    Location:
    Surrey, UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Now on the GCR website - Tender time for the Factory Flyover! - Great Central Railway
     
    Bluenosejohn, Johnme101 and jnc like this.
  2. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    3,197
    Likes Received:
    7,143
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The "Urban Viaduct" I think is effectively going to be three parts. From the two track canal bridge, there will be approx 60m of embankment then a small single track bridge next to the Combined Sewer Outflow to allow maintenance vehicle access. Then it is the single track precast sections of the Urban Viaduct (About 250m), steadily rising to meet the Railway Terrace crossing bridge. This bridge is the highest point to allow for the large tip lorries to get to the recycling centre.
    There is also a small section of North embankment to be rebuilt, to join the MML bridge to the existing embankment and Chord line track.
    The existing Engine Shed will need to be relocated as the twin tracks to the Canal Bridge are on the original track formation - which is roads 1 and 2 in the shed. That is still three to five years away though.
     
  3. brmp201

    brmp201 Member

    Joined:
    May 18, 2010
    Messages:
    681
    Likes Received:
    1,090
    Gender:
    Male
    Occupation:
    IT Director
    Location:
    Surrey, UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
  4. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    3,197
    Likes Received:
    7,143
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That is a good video update and the projected build time is better than I thought it would be....complete by Christmas next year!
     
  5. jnc

    jnc Well-Known Member

    Joined:
    Apr 3, 2012
    Messages:
    1,821
    Likes Received:
    3,164
    Gender:
    Male
    Location:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    For those of us who refuse to watch videos: What is it that will be complete by Christmas next? Just the car park viaduct and the bridge over the road (which is what they are currently accumulating money for), or something else as well?

    Noel
     
  6. Mark Thompson

    Mark Thompson Well-Known Member

    Joined:
    Sep 10, 2017
    Messages:
    1,898
    Likes Received:
    4,652
    Gender:
    Male
    Location:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Yes. Exactly that. The most difficult bit in terms of logistics. The "Urban Viaduct", which has no direct third party involvement, would be a separate and final phase.
     
    jnc likes this.
  7. Bikermike

    Bikermike Well-Known Member

    Joined:
    Mar 11, 2020
    Messages:
    2,273
    Likes Received:
    2,586
    Gender:
    Male
    Location:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Yes, for those of us quietly browsing at work, a video is a complete pain...
     
    jnc likes this.
  8. ghost

    ghost Part of the furniture

    Joined:
    May 29, 2006
    Messages:
    4,530
    Likes Received:
    6,250
    Gender:
    Male
    Location:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    With the northern embankment slotted in at some point as well
     
    jnc likes this.
  9. Mark Thompson

    Mark Thompson Well-Known Member

    Joined:
    Sep 10, 2017
    Messages:
    1,898
    Likes Received:
    4,652
    Gender:
    Male
    Location:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    At the same time, it seems.
     
  10. Davo

    Davo Well-Known Member

    Joined:
    Oct 12, 2018
    Messages:
    1,619
    Likes Received:
    763
    Gender:
    Male
    Location:
    W yorkshire 56f
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Possibly funding noel for the eventual transfer rebuilding of the current G.C.R. Loughborough M.P.D. is this to be done though as the 7th step after the urban viaduct between railway terrace bridge and grand Union canal bridge is completed?
    Or the 6th step before the urban viaduct is constructed I always thought the down alignment past the Loughborough M.P.D. can be used is that still possible?
     
    Last edited: Sep 17, 2026 at 8:26 PM