Windcutter Wagons

Discussion in 'Heritage Rolling Stock' started by Flying Phil, Dec 11, 2018.

  1. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    3,208
    Likes Received:
    7,186
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Following the Beer Festival there has been a shunt at Rothley and the rail crane was brought next to B560676. On Wed the C&W team were able to hoist our new fixed end for a trial fit.
    DSCF0291.JPG

    It is very close but one of the stanchions has become slightly "twisted" with the welding so does not sit evenly against the headstock. We are assessing various methods to address the situation.
    DSCF0293.JPG

    Yesterday I popped along to do a bit of undercoating.
    DSCF0299.JPG DSCF0300.JPG DSCF0301.JPG
     
  2. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    3,208
    Likes Received:
    7,186
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Another workday has seen the new fixed end straightened ready for lifting back into position for the final fettling and welding in place. We used a straight piece of section and "G" clamped it with multiple clamps, then the temporary brace has been tack welded. The welds on the headstock have been dressed true. DSCF0304.JPG DSCF0305.JPG
     
  3. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    3,208
    Likes Received:
    7,186
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    On another website, the question was asked about how much does a Windcutter wagon cost to overhaul. So I put together a rough costing by saying a new floor uses about £700 for new steel sheet. But there is also about 40 cutting discs and 80 welding rods. Coating the inside uses about 5l of bitumastic. Painting the outside uses about 2 to 5l of primer, 4l of undercoat and 4l of topcoat. There are also sundries of vac cylinder overhaul, hoses, grinding discs, wire brushes, paint brushes etc....so a broad total cost of about £2500 direct cost.....and about 300 hours of volunteer time (4 people 6 hours per week, three months per overhaul).
    We have 30 wagons in the fleet and 23 have been recently (within 6 years) overhauled. There are three now at Rothley for completion over the next 5 months and the last four at Swithland for completion in 2027.
    As we hope these overhauls will last about 30 years, with two paint jobs in that time, the future costs will be less.
    Seeing Two Windcutter rakes running over this Gala weekend is why we do the work! We are having a Sales stand at Rothley on Sat and Sunday so please come along to speak to the team and show your support.
     
    smasher, 5944 and ghost like this.
  4. pmh_74

    pmh_74 Part of the furniture

    Joined:
    Jan 28, 2009
    Messages:
    2,674
    Likes Received:
    2,136
    *Cough* and some in Wales...
     