If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

2026 Entries/Returnees and Withdrawals

Discussion in 'Steam Traction' started by Ben Jenden, Dec 9, 2025.

  1. Fireline

    Fireline Well-Known Member

    Joined:
    Feb 11, 2008
    Messages:
    1,479
    Likes Received:
    1,885
    Gender:
    Male
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    4253 should be next year, all things being equal. Boiler is off for what is hoped will be the final time, for the ashpan to be fitted, and associated works.

    Can only presume that, as no mention of 68078 arriving at TWW has been made, that it's still at Sellindge.

    USA tank 65 has steamed, and moved, but has come apart again for a further repair. Shouldn't be too long.

    Charwelton is due back to the K&ESR in November.
     
    silversteellady likes this.
  2. John Petley

    John Petley Part of the furniture

    Joined:
    Oct 8, 2007
    Messages:
    3,060
    Likes Received:
    2,803
    Gender:
    Male
    Occupation:
    Researcher/writer and composer of classical music
    Location:
    Between LBSCR 221 and LBSCR 227
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The 4253 team posts regular monthly updates which give a pretty comprehensive summary of progress, if you're particularly interested in this engine.
     
    misspentyouth62 likes this.
  3. pmh_74

    pmh_74 Part of the furniture

    Joined:
    Jan 28, 2009
    Messages:
    2,678
    Likes Received:
    2,155
    Which may well be true, but I think I saw on FB the other day that the boiler has had an out-of-frames steam test, so it's progressing.

    EDIT: Sorry, there are photos in the Bulleid thread, but I hadn't read that!
     
  4. misspentyouth62

    misspentyouth62 Part of the furniture

    Joined:
    Nov 8, 2017
    Messages:
    2,509
    Likes Received:
    3,693
    Gender:
    Male
    Location:
    34D, now flexible
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I have some how missed these updates - thanks for sharing the link allowing me to watch with interest.
     
  5. Robin

    Robin Well-Known Member Friend

    Joined:
    May 7, 2012
    Messages:
    1,584
    Likes Received:
    2,265
    Location:
    Stourbridge
    To paraphrase the old saying, the first 90% of the overhaul takes 90% of the time, and the last 10% takes the other 90%.

    On the good news front, 7714's withdrawal has been postponed from November 2026 to Summer 2027 (hopefully I won't jinx anything by saying that!)
     
    Rander and Paul42 like this.
  6. Steve

    Steve Nat Pres stalwart Friend

    Joined:
    Oct 7, 2006
    Messages:
    13,751
    Likes Received:
    14,744
    Occupation:
    Gentleman of leisure, nowadays
    Location:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    HC 1544 'Slough Estates No.3' has quietly slipped back into service at the Middleton Railway after a 10 year overhaul which included a new main frame stretcher between the cylinders, a new cab roof, bunker and tank repairs, a retube and the usual fettling of bearings, injectors, etc. The loco has also been generously donated to the Railway by the Slough & Windsor Railway Society, its previous owners.
     
    Paul42 and 26D_M like this.

Share This Page