    How long would works on the scale of Bridge 42 usually take? Less than 3 months (if they plan to reopen fully in time for easter) sounds quick.
     
  2. Sulzerman

    Sulzerman Member

    Joined:
    Jan 22, 2025
    Messages:
    287
    Likes Received:
    451
    Gender:
    Male
    Location:
    Malton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I doubt the bridge will be tackled. I thought work would be late 2027 for completion in 2028.
    It may be work on platform 4 at Grosmont and signalling for the NR connection will be this winter.
     
  3. 5944

    5944 Resident of Nat Pres

    Joined:
    Jan 14, 2006
    Messages:
    10,484
    Likes Received:
    13,034
    Gender:
    Male
    Occupation:
    Train Maintainer for GTR at Hornsey
    Location:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I assume the line is shut now north of Goathland until Easter, so that gives them over 5 months to carry out the work. It's not going to be a quick job, especially not in the middle of potentially a very cold, snowy winter.

    Whether they can afford it is another matter...
     