North Yorkshire Moors Railway General Discussion

Discussion in 'Heritage Railways & Centres in the UK' started by The Black Hat, Feb 13, 2011.

  1. Jark91

    Jark91 Member

    Joined:
    Dec 26, 2009
    Messages:
    280
    Likes Received:
    101
    How long would works on the scale of Bridge 42 usually take? Less than 3 months (if they plan to reopen fully in time for easter) sounds quick.
     
  2. Sulzerman

    Sulzerman Member

    Joined:
    Jan 22, 2025
    Messages:
    287
    Likes Received:
    451
    Gender:
    Male
    Location:
    Malton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I doubt the bridge will be tackled. I thought work would be late 2027 for completion in 2028.
    It may be work on platform 4 at Grosmont and signalling for the NR connection will be this winter.
     
  3. 5944

    5944 Resident of Nat Pres

    Joined:
    Jan 14, 2006
    Messages:
    10,487
    Likes Received:
    13,042
    Gender:
    Male
    Occupation:
    Train Maintainer for GTR at Hornsey
    Location:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I assume the line is shut now north of Goathland until Easter, so that gives them over 5 months to carry out the work. It's not going to be a quick job, especially not in the middle of potentially a very cold, snowy winter.

    Whether they can afford it is another matter...
     
    Paul42, silversteellady and Jark91 like this.
  4. 60044

    60044 Well-Known Member

    Joined:
    Feb 24, 2016
    Messages:
    1,737
    Likes Received:
    2,357
    Gender:
    Male
    Location:
    Salisbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I've been told they are waiting for the result of a grant application, and if it comes through fairly soon the work will at least be started this winter - that could save another year of having to hire the props. A lot of the pway work needed is ballasting and tamping, which ought to be reasonably inexpensive cost of ballast mostly, and not starting from scratch, and the paid pway staff are at a minimum and being paid anyway.
     
  5. jnc

    jnc Well-Known Member

    Joined:
    Apr 3, 2012
    Messages:
    1,881
    Likes Received:
    3,244
    Gender:
    Male
    Location:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Going from my admittedly now-dim memories of what was outlined in the planning application for the work, it would to some degree depend on how big a crew was put onto the job; i.e. how much money they wanted to spend. I don't know enough about that kind of work to have a reliable sense of how to go from what was outlined in the planning application, to 'how long it would take'. Putting the propping up took, IIRC, several weeks; going from that, my guess for the repairs would be a month or two (depending on crew size).

    Noel
     
  6. Daddsie71b

    Daddsie71b Well-Known Member Friend

    Joined:
    Apr 4, 2013
    Messages:
    1,141
    Likes Received:
    1,021
    Gender:
    Male
    Location:
    34091
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    For one of the biggest heritage railways relying on grants to complete the works rings alarm bells. We are all maintaining ageing infrastructure and should be putting money aside.
     
    jnc likes this.
  7. Steve

    Steve Nat Pres stalwart Friend

    Joined:
    Oct 7, 2006
    Messages:
    13,784
    Likes Received:
    14,845
    Occupation:
    Gentleman of leisure, nowadays
    Location:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    With some of us the alarm bells have been ringing for a few years now.
     
    jnc and 47406 like this.
  8. 60044

    60044 Well-Known Member

    Joined:
    Feb 24, 2016
    Messages:
    1,737
    Likes Received:
    2,357
    Gender:
    Male
    Location:
    Salisbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer

    ..... but some railways have more infrastructure than others! Actually, I think the NYMR has a pretty good record compared to many other lines Several bridges replaced with good grant support, and quite a high proportion of the track replaced - it is only in recent times that it has slipped, and I think that can really be tied to a SMT that really doesn't appreciate the need to spend as much on it as, well, admin staff .......
     
  9. Pete Thornhill

    Pete Thornhill Resident of Nat Pres Staff Member Administrator Moderator Friend

    Joined:
    Jul 24, 2008
    Messages:
    8,146
    Likes Received:
    6,770
    It’s not unusual or unique to the NYMR.

    Some examples over the last decade -

    Grants specifically for infrastructure repairs:

    1. Weardale Railway (2020–22) – £2,128,000 from Durham County Council for repairs to railway bridges.

    2. East Lancashire Railway (2024) – Over £1.3 million from the Government's Community Ownership Fund and three local councils for structural repairs to Higher Woodhill Viaduct.

    3. Keighley & Worth Valley Railway (2023) – £1 million from the Government's Community Ownership Fund towards replacement of the deteriorating Bridge 27 at Haworth.

    4. Severn Valley Railway (2019) – £853,800 from the National Lottery Heritage Fund towards restoration of Falling Sands Viaduct, including structural repairs, brickwork and waterproofing.

    5. Steeple Grange Light Railway (2021–22) – £32,636 from the Tarmac Landfill Communities Fund for rockfall stabilisation and repairs around Porter Lane Bridge.

    6. Bluebell Railway (2026) – £15,000 from the Pilgrim Trust for structural timber repairs to Kingscote signal box.
    Larger grants that specifically included infrastructure repairs:

    1. North Yorkshire Moors Railway (2017–22) – Approximately £4.6 million from the National Lottery Heritage Fund for the Yorkshire's Magnificent Journey programme, including the replacement of three deteriorating bridges around Goathland.

    2. Mid-Hants Railway / Watercress Line (2021) – Approximately £492,000 from the Government's Culture Recovery Fund, specifically including essential track repairs and repairs to several bridges.

    3. Bluebell Railway (2024) – £250,000 from the National Lottery Heritage Fund towards a wider project including refurbishment and repairs to platforms at Horsted Keynes.

    4. Bluebell Railway (2020) – £250,000 from the National Lottery Heritage Emergency Fund, including track repairs alongside other essential expenditure.
    Additional example:

    1. Aln Valley Railway (2025) – £255,000 from Northumberland County Council and Historic Railways towards structural repairs and waterproofing of Eden Hill Bridge, facilitating the railway's future extension. This involved infrastructure not yet part of the operational railway.

      As you can see it’s a common occurrence and a vital funding source in itself. I don’t share your concern, far more worrying would be an inability to sustain daily running costs in my opinion.
     
    Sawdust, Jark91, jnc and 4 others like this.
  10. 5944

    5944 Resident of Nat Pres

    Joined:
    Jan 14, 2006
    Messages:
    10,487
    Likes Received:
    13,042
    Gender:
    Male
    Occupation:
    Train Maintainer for GTR at Hornsey
    Location:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Which does seem to be the case, with the £250,000 operating profit last year only being made possible by a transfer of £500,000 from the trust.
     
    jnc likes this.
  11. Pete Thornhill

    Pete Thornhill Resident of Nat Pres Staff Member Administrator Moderator Friend

    Joined:
    Jul 24, 2008
    Messages:
    8,146
    Likes Received:
    6,770
    Exactly. That is far more concerning and although my comment was more generally it was made with that in mind.

    At the end of the day grant funding is an established route for funding large capital projects but I think you’d be hard pushed to find external unconnected grant bodies willing to fund day to day operations.

    Looking at the NYMR specifically, the way the grant from the NYMR trust was presented as profit might be technically correct in the sense that if there was a surplus it can be considered a profit regardless of the source, but it’s also misleading at the same time as to the true performance of the business and while you might get away with it once or twice unless the trust has infinite funds isn’t sustainable in the long term.

    What it does highlight though is the urgency of needing to find a way of reversing the situation which led to its awarding in the first place, and is entirely different to the established route of grant funding capital projects which in this case the NYMR were right to pursue.
     
    Jark91 and jnc like this.
  12. brennan

    brennan Member

    Joined:
    Sep 11, 2016
    Messages:
    628
    Likes Received:
    767
    Location:
    Gloucester
    Heritage Railway Volunteer:
    No I do not currently volunteer
    First financial rule for a business; "never use your money when you can use someone else's".
     
    Sheff likes this.
  13. Kirk Oswald

    Kirk Oswald New Member

    Joined:
    Apr 1, 2024
    Messages:
    162
    Likes Received:
    392
    Location:
    Kirkoswald
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I know both of you have in depth NYMR knowledge but others who don't might gain the wrong impression re the £500k transfer.

    There was no operating profit in the last financial year (to Feb 2026) and although the accounts suggest otherwise they are a fiction. The £500k transferred from Trust to PLC simply disguised an operating loss as in previous years. Also there was no Trustee surplus to subsidise the transfer - it was conjured up from loans which will sooner or later need to be repaid.

    Far from a surplus the Trust accounts shows a negative "free reserves" deficit of over £3 million and still going in the wrong direction. Those lending sums to the Trust (principally Santander) do so on the basis of assets owned by the Trust but mortgaged as security to those lenders. This isn't an unusual arrangement but where the NYMR is concerned those assets are vital to run the business from. In blunt terms if the bank gets cold feet and calls in the loans then vital assets would have to be sold off, hopefully the Park Street offices first.

    Bank of England base rate is now 4% and likely to rise further and, although the PLC don't disclose the actual rate being charged you can bet your bottom dollar it is significantly higher than base rate. Hypothetical I know but 6% on £3 million is £180,000 in interest alone every 12 months, and that's without paying off any actual debts, which have increased further this financial year due to poor management.

    Like Pete and others I agree that there is nothing wrong in seeking grants to meet specific projects and very welcome they are too. However the spend now - pay later policies adopted by the CEO and crew has clearly reached the end of the road, together with their credibilty.

    I genuinely hope and believe the new Trustee Chairman can reverse the stupidities of recent years and dispose of those responsible.
     
    Last edited: Nov 7, 2026 at 12:20 PM
    Diamond Gaz and jnc like this.
  14. Pete Thornhill

    Pete Thornhill Resident of Nat Pres Staff Member Administrator Moderator Friend

    Joined:
    Jul 24, 2008
    Messages:
    8,146
    Likes Received:
    6,770
    The trust accounts do reveal the interest rate hidden away in the notes - Bank of England base rate +4% so at today’s rate 8% in total. If you do a back of a fag packet calculation it’s around £60-£65k a year interest payment roughly which fits with the interest payments shown in the accounts and would appear to account for all the interest payments shown despite there being no actual breakdown.
     
    jnc likes this.
  15. Jamessquared

    Jamessquared Nat Pres stalwart

    Joined:
    Mar 8, 2008
    Messages:
    29,784
    Likes Received:
    73,717
    Location:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think in real term you are right, though at a technical accountancy level if the plc receives a grant from a trust (any trust) then that is a direct impact on the profit and loss, and may well turn a loss into profit. So in accountancy terms it is correct, though I think it would be normal in the explanatory notes to explain the transfer and state that the income after "extraordinary items" was a loss.

    Tom
     
    Kirk Oswald likes this.
  16. 35B

    35B Nat Pres stalwart

    Joined:
    Jun 18, 2011
    Messages:
    33,288
    Likes Received:
    36,917
    Gender:
    Male
    Location:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    As much to the point, I'm curious as to why (a) the Trust felt it necessary to donate money that would put the PLC into a surplus, and (b) if this related to the timing of grants, why the matching principle wasn't applied to defer recognition of at least some of that transfer until the associated costs were incurred (or if for a backlog, recognition of those costs deferred until the income received).
     
  17. Sawdust

    Sawdust Member

    Joined:
    Jul 18, 2015
    Messages:
    747
    Likes Received:
    1,322
    Gender:
    Male
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Indeed the NYMR has been replacing bridges since the 1970s and the Esk Valley viaduct had the arches re waterproofed in the 80s. It's since bridge 30 that external funding has been sort.