If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Churnet Valley Railway General Discussion

Discussion in 'Heritage Railways & Centres in the UK' started by Sheff, Dec 6, 2013.

  1. Chris86

    Chris86 Well-Known Member

    Joined:
    Oct 31, 2011
    Messages:
    2,000
    Likes Received:
    2,920
    Occupation:
    Safety, technical and vehicle trainer
    Location:
    South Yorkshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Seems an unusual choice for the line being steeply graded- having said that it did well at the MHR and Repton appears to manage at the NYMR.

    Great news though- the CVR seems to be making really positive progress.

    Any news on the 8F, 4F or the TKHs?

    Thanks
    Chris
     
  2. lil Bear

    lil Bear Resident of Nat Pres

    Joined:
    Dec 11, 2006
    Messages:
    6,152
    Likes Received:
    1,812
    Gender:
    Male
    Occupation:
    Infrastructure Engineer
    Location:
    21A / 5D / 27C / 71B
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Slight mis-match in press release timings, but yeah things are happening in the Churnet Valley. Greg for all his good is unfortunately a Southern aficionado - just shows no-one can be perfect - but this is very much a Churnet Valley Railway project which he's leading on in his position as CVR Managing Director (and Ops Director).

    There is a few more announcements to come as the merging of the CVR PLC into the NSRC Ltd is completed - hopefully by the end of 2026 but we'll let you know once all is done. Don't know why creating a pool hire is a negative that should prevent us from taking on a National Collection loco, 3839 has already visited GCRN and will be out on hire in 2027? 6435 meanwhile has already been stripped with the boiler now separate from the frames ready for the team diving into her overhaul upon the completion of Polars. We might not be your SVR / GCR / NYMR, but we're more than capable of punching above our perceived limitations.

    Our Steam Train Dining services surpassed £1million income in 2026 for the first time.
    Polar Express sales are above 80,000 - the highest in the UK according to some figures.
    Throughout the year we have regularly run a 7-coach train near full capacity 2-3x times a day.
    We've introduced a behind-the-scenes experience day, which some on here have booked on, that has shown to be innovative and appreciated by those who visited.
    We're living within our means, and cutting our cloth accordingly.

    The 4F is waiting discussions elsewhere, and we'll make appropriate announcements as/when.
    8F is a Batt Holden loco, it is being worked on but it is for them to share details not us.
    TKh; the spare boiler from 2871 is being worked on, the wheelsets have been sent away for repairs and once ready they will all be placed with 2944 ahead of a return to service for Hotspur. No timescale set on this though.
    Add to that we've just had our busiest shutdown period ever, with 600T of ballast replaced / tamped completely removing 2x TSRs.
    For 2027 we have planned to shut for 9x weeks vice our usual 5x in order to progress further infrastructure renewals; with 1/4-mile section of line being completely replaced, an entire turnout being replaced and the first phase of Chedd Loop being installed. There will then be ongoing developments throughout the year in terms of all PWay / S&T / Telecoms to increase the operational capacity of Cheddleton.
    If anyone wishes to be a part of all this get in touch, we may not be one of the proverbial big boys but things are very much happening in this quiet little valley.
     

Share This Page