If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

North Yorkshire Moors Railway General Discussion

Discussion in 'Heritage Railways & Centres in the UK' started by The Black Hat, Feb 13, 2011.

  1. Jark91

    Jark91 Member

    Joined:
    Dec 26, 2009
    Messages:
    284
    Likes Received:
    110
    This seems like an overreaction. I'm sure there's a good amount to spend even if the work is less than anticipated, and any, potentially substantial leftover funds can easily be added to a fund for the next bridge that needs repairs.

    Also it means no loss of revenue through not running Grosmont-Goathland beginning of next season. Actually it seems like a bit of a gift from the gods if true.
     
  2. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    Joined:
    Oct 2, 2015
    Messages:
    10,232
    Likes Received:
    8,651
    Gender:
    Male
    Location:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Yes it is an engineering project. Normally they find things you do not know about and it costs more. Sometimes it is actually the other way around. If it is true then as you say a bonus.
     
    Last edited: Nov 25, 2026 at 2:33 PM
    Jark91, jnc and Sawdust like this.
  3. Sheff

    Sheff Resident of Nat Pres

    Joined:
    Apr 21, 2006
    Messages:
    8,698
    Likes Received:
    4,171
    Gender:
    Male
    Occupation:
    Retired Engineer & Heritage Volunteer
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Ok I’m just an engineer of a different discipline, so I’ll ask the obvious question ….
    If core samples have now revealed the true condition of the structure, why oh why weren’t they taken many months ago?
     
    Romsey, 35B, Paul42 and 3 others like this.
  4. Jamessquared

    Jamessquared Nat Pres stalwart

    Joined:
    Mar 8, 2008
    Messages:
    29,832
    Likes Received:
    73,863
    Location:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I had wondered if the change in plan ran in parallel with a change in personnel giving advice?

    Tom
     
    35B and Chris86 like this.
  5. 5944

    5944 Resident of Nat Pres

    Joined:
    Jan 14, 2006
    Messages:
    10,547
    Likes Received:
    13,168
    Gender:
    Male
    Occupation:
    Train Maintainer for GTR at Hornsey
    Location:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It might be an overreaction, but why has this taken so long? The initial closure was a year ago. If what @Wonkyturntables says is true (and I've no reason not to, based on his previous postings) then why the hell has it taken this long to find out the bridge isn't as bad as initially thought? The line was shut or curtailed for 11 weeks in the last year, about a third of the planned running days.

    https://northyorkmoors-publicportal...Next/publicportal/planningapplications/820983

    Screenshot Change To Proposed Plans Received 11-11-2026 0(1).png

    Why is this being done now? That letter ties in with what @Wonkyturntables says about the core samples coming back stronger than expected. Why are these works planned in for 2027/2028? Is the bridge in good enough condition that services can run over it for the next year without the need for propping?

    https://www.newcivilengineer.com/la...needed-to-repair-yorkshire-bridge-14-04-2026/

    https://www.railengineer.co.uk/propping-an-arch-bridge-42-at-grosmont/

    Regarding funding, the railway say they've raised £440,000. The first article above states propping the bridge would cost £250,000. The second states £520,000! As the first was written before the propping started, I'd be more inclined to believe the second one. The month long crane hire alone could easily have been £100,000. That's just for the installation, they'll have to pay again to get the structure removed.

    Yes, it's good the bridge potentially isn't as bad as thought, but work will still be required. The problem now is there's no money available. None banked from running services, because they only ran two 4 coach trains for a third of the season (that varied from full and standing to absolutely deserted), and none left from the appeal because it will all be spent on the propping. If the propping does turn out to have been pointless, people are going to think "hang on, you've wasted half a million quid, you're not getting a penny of my money".

    SVR have raised over £500,000 since June for the canopy that's being installed at Kidderminster. The NYMR have had twice as long and still haven't raised that figure, and that's not for a nice-to-have project, it's an emergency appeal for something that fundamentally affects the continuing existence of the railway.

    This is my concern - if the propping wasn't required, then that's half a million quid wasted, far more than the cost of the repairs. Who's going to donate to a railway that wastes that sort of money? Why was propping instigated before a full inspection was carried out? None of the documents say propping was required, only scaffolding to allow access.

    It's not like they've accidentally over ordered on mince pies for the Santa Specials. They've potentially spent half a million quid on something that wasn't required! And nothing to show for it at the end, as the bridge still hasn't been repaired.
     

    Attached Files:

    21B and 35B like this.
  6. 5944

    5944 Resident of Nat Pres

    Joined:
    Jan 14, 2006
    Messages:
    10,547
    Likes Received:
    13,168
    Gender:
    Male
    Occupation:
    Train Maintainer for GTR at Hornsey
    Location:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Screenshot Change To Proposed Plans Received 11-11-2026 0(1).png

    He's still leading the project by the looks of things.
     
    Jamessquared likes this.
  7. twr12

    twr12 Well-Known Member

    Joined:
    Sep 2, 2007
    Messages:
    1,855
    Likes Received:
    1,097
    This Bridge affair is becoming curiouser and curiouser.
     
  8. Respite

    Respite Member

    Joined:
    Nov 6, 2009
    Messages:
    476
    Likes Received:
    180
    Gender:
    Male
    Occupation:
    Retired
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Is anything being done this winter to the track?
    Besides the bridge problems which are causing speed restrictions there are TSRs that I know of at Greenend, Fen Bog and the long stretch from Raindale to Newtondale.
     
  9. brennan

    brennan Member

    Joined:
    Sep 11, 2016
    Messages:
    638
    Likes Received:
    789
    Location:
    Gloucester
    Heritage Railway Volunteer:
    No I do not currently volunteer
    There is, of course, the possibility that the railway bridge engineer who was shown the door knew what he was talking about........
    This will become a classic case of corporate hysteria. The blind leading the blind etc.
     
    Paul42, twrig_8, Sulzerman and 2 others like this.
  10. 60044

    60044 Well-Known Member

    Joined:
    Feb 24, 2016
    Messages:
    1,751
    Likes Received:
    2,366
    Gender:
    Male
    Location:
    Salisbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I refer readers back to my earlier post #13072!
     
  11. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    Joined:
    Oct 2, 2015
    Messages:
    10,232
    Likes Received:
    8,651
    Gender:
    Male
    Location:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    My work experience tells me if you ask two engineers a question you will get at least three different answers, all of which come with some form of "qualification". So not remotely surprised differing views appear.
    Luckily not my project, but one of our aircraft seats took over 100 tests to get it past the 16G test, and that was using brand new material and the latest design techniques and computer modelling. Hardly unexpected to have differing views on an old weather beaten structure like a bridge.
    Hell a few years back my MOT had an advisory on the brakes I did nothing about, next year same tester did not even mention it at all. It is never an exact science.
     

Share This Page