North Yorkshire Moors Railway General Discussion

Discussion in 'Heritage Railways & Centres in the UK' started by The Black Hat, Feb 13, 2011.

  1. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    Joined:
    Oct 2, 2015
    Messages:
    10,239
    Likes Received:
    8,658
    Gender:
    Male
    Location:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Fully experienced that towards the back end of my career. If you want promotion leave the company and find it elsewhere I was once told at a performance review. However the Engineering community still very much relied on experience (and in our case of course the applicable licences).
     
    jnc likes this.
  2. jnc

    jnc Well-Known Member

    Joined:
    Apr 3, 2012
    Messages:
    1,887
    Likes Received:
    3,254
    Gender:
    Male
    Location:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    In the aerospace world, 'safety factors' have themselves been reduced to an explicit number. For most civil aviation applications, they use 1.5 (e.g. if you think the maximum force that will ever be exerted on some structural member will be 100 kilo-newtons, you design yours to withstand 150 kilo-newtons); for some particularly crucial things, it will be 2.0. In the rocket world, where weight is even more crucial, they try and get 1.5, but often have to settle for 1.2.

    Noel
     
  3. Inzynier

    Inzynier New Member

    Joined:
    Jun 30, 2025
    Messages:
    21
    Likes Received:
    31
    Gender:
    Male
    Location:
    porthmadog
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Before this thread flies off at a tangent about safety factors and the uncertainty in engineering - and, for the record, while some aspects of engineering have a high degree of certainty, structural assessments are not one of them - can we get back to the crux of the matter?

    In the email quoted in post #13085 it is stated that cores have been taken and the samples show no evidence of separation between the arch layers.

    From this, some people have inferred that the propping of the structure was not necessary. If (and it is a big if) that is correct, then a considerable amount of money has been spent, which need not have been spent. If that is the case, the really big question is why the cores weren't taken many months ago. As a chartered civil engineer, I find it extremely difficult to understand why anybody would commit to spending very large sums of money without first carrying out the most basic of testing.

    I've followed this thread for a fair time now but, with little real knowledge of the situation, I've wondered to what extent the calls for heads to roll are symptomatic of the situation that has arisen in some railways over the years, whereby individuals blame the management for all the problems facing the organisation - and let's face it, heritage railways have a number of problems facing them, irrespective of who is in charge.

    But if it is genuinely the case that simple tests were not carried out at a very early stage in the Bridge 42 saga, then I really do think that the person leading the project for NYMR must be fired. His position is quite clearly untenable.
     
    Kirk Oswald, Sawdust, jnc and 2 others like this.
  4. pmh_74

    pmh_74 Part of the furniture

    Joined:
    Jan 28, 2009
    Messages:
    2,696
    Likes Received:
    2,199
    Either way, one would hope that, having been presented with an unexpectedly damaging assessment of the condition of said bridge and the mitigation required, the management being tasked with signing off said action would carry out their own due diligence on said assessment. One might, for example, expect them to seek an independent second opinion. Or indeed some further tests:

    As a CEng in the rail industry, all I know about bridges is that I don't know enough about bridges. I certainly don't know if "no evidence of separation between the arch layers" can be taken to infer that propping wasn't necessary. I'd leave that to the experts in the relevant discipline.

    Which was pretty much my initial conclusion upon reading the messages up-thread, to be honest.
    What we don't know, of course, is if the CE who proposed this course of action actually said "unless you can carry out some tests demonstrating x, we have to assume y which is the worst-case".
    Or even if he did say that, for all we know the railway went out to tender for additional testing and all the suitably qualified contractors were too busy for the next several months. Which doesn't excuse the lack of foresight and planning at a management level, but would certainly let the CE off the hook.
    If said individual was to be fired, as you suggest, and has any evidence of the sort of caveats I've mentioned here, then I doubt their sacking would stand up at a tribunal.

    Fundamentally, whoever said or did (or didn't do) whatever, the buck has to stop with management, surely?
     
    Kirk Oswald and jnc like this.
  5. Lineisclear

    Lineisclear Well-Known Member

    Joined:
    May 24, 2020
    Messages:
    1,737
    Likes Received:
    1,590
    Gender:
    Male
    Location:
    Worcestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The buck has to stop with management ( ultimately the Trustees) especially with regard to the duty to make safety a number one priority. Faced with independent external professional advice that continued use of the bridge was unsafe there was really no alternative to immediate closure. Would those who argue that there was no need for that have been prepared to take the rap personally if the professional advice proved correct and a catastrophic failure occurred? I doubt it! Those are the sort of decisions that can lead to companies and individuals being held legally accountable with potentially draconian consequences.
    The NYMR, in common with other heritage lines, asserts that safety is paramount. Sometimes living up to that can involve hard unpleasant decisions. As pmh_74 points out it doesn't follow that the lack of separation between the arch layers means that propping was unecessary. The leaching of mortar, the presence of cracks and voids and evidence of bricks falling out a suggest a structure still presenting an immediate safety risk. In practice propping,with the consents secured, was installed in a remarkably quick timescale (due particularly to the efforts of the Head of Civils) so those responsible could be confident their duty to prioritise safety had been met.
    The latest reports suggest it's like a car failing its MOT test because of structural corrosion. Discovering that there's more sound metal to weld onto than might have been feared doesn't make the vehicle safe. It just means that the challenge of making it roadworthy again is not as great.
     
  6. Steve

    Steve Nat Pres stalwart Friend

    Joined:
    Oct 7, 2006
    Messages:
    13,802
    Likes Received:
    14,875
    Occupation:
    Gentleman of leisure, nowadays
    Location:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    No, I’m not forgetting the factor of ignorance. Such things are generally derived from experience. I know of no means of working out what this factor should be ‘scientifically”.
     
    Sawdust likes this.
  7. Sawdust

    Sawdust Member

    Joined:
    Jul 18, 2015
    Messages:
    757
    Likes Received:
    1,339
    Gender:
    Male
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I don't like to leave getting my MOT until the last minute.......

    Sawdust.
     
  8. Inzynier

    Inzynier New Member

    Joined:
    Jun 30, 2025
    Messages:
    21
    Likes Received:
    31
    Gender:
    Male
    Location:
    porthmadog
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    No, of course they wouldn't. But a competent professional would have arranged for appropriate testing to be carried out. The suggestion is being made that cores have only recently been taken which, if correct, casts doubt on the competence of the person in charge.

    And can we clarify who is the "CE" people are referring to? If it's the author of the email that was copied above, he signs his email as "Freelance Construction Professional". From what I recall from reading his biography/CV somewhere some time ago, his qualifications are more in the area of quantity surveying than engineering.
     