If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

North Yorkshire Moors Railway General Discussion

Discussion in 'Heritage Railways & Centres in the UK' started by The Black Hat, Feb 13, 2011.

  1. Steve

    Steve Nat Pres stalwart Friend

    Joined:
    Oct 7, 2006
    Messages:
    13,807
    Likes Received:
    14,900
    Occupation:
    Gentleman of leisure, nowadays
    Location:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Whilst Piglet had the remit over the civil engineering I understand that he had a plan in place to undertake the required work on Br.42 last winter based on the recommendations of a bridge engineer. The new incumbent C.E apparently kicked this into touch and new people were brought in to examine the bridge. At least one person involved was a civil engineer well respected in the heritage railway movement but whose expertise was in track and seemingly not bridges. Certainly the NYMR published photos of him examining the bridge last winter. It seems from what I've heard that the new plan is fairly similar to that previously proposed.
     
    jnc, Paul42, 60044 and 2 others like this.
  2. 60044

    60044 Well-Known Member

    Joined:
    Feb 24, 2016
    Messages:
    1,759
    Likes Received:
    2,378
    Gender:
    Male
    Location:
    Salisbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Thanks for confirming what I said. So, it's back to where we started, and I think that, a long way back on this thread now, I recounted what a bridge engineer said what he thought needed to be done to at least make it safe to use - funnily enough it was much the same as what is now proposed, half a million quid later on but with still no work started.
     
    Steve likes this.
  3. Inzynier

    Inzynier New Member

    Joined:
    Jun 30, 2025
    Messages:
    23
    Likes Received:
    45
    Gender:
    Male
    Location:
    porthmadog
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The key to cost effectiveness is in the selection of the contractor - in this case it appears that the selected contractor has incurred a lot of expenditure which wasn't necessary?
     
    Sawdust likes this.
  4. Sulzerman

    Sulzerman Member

    Joined:
    Jan 22, 2025
    Messages:
    293
    Likes Received:
    455
    Gender:
    Male
    Location:
    Malton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That is the £520,000 question.
     
    Kirk Oswald, Steve and Sawdust like this.
  5. 21B

    21B Part of the furniture

    Joined:
    Sep 2, 2009
    Messages:
    5,474
    Likes Received:
    13,054
    To me, by definition, someone cannot be value for money unless they are competent, for if they are not, any money paid to them is a waste.
     
    Sawdust, Sulzerman, 35B and 5 others like this.
  6. Jamessquared

    Jamessquared Nat Pres stalwart

    Joined:
    Mar 8, 2008
    Messages:
    29,842
    Likes Received:
    73,916
    Location:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Quite so.

    It seems to me this discussion is getting a bit confused. There is nothing wrong in paying for professional specialist advice, and the example previously given by @35B of the role of a Church Architect is well made in that case. Doing so though does require that the professional adviser is up to the job in terms of their knowledge and experience.

    However, the role of the Director, on being presented with advice, is to satisfy themselves that such advice is sound. That is particularly the case in a situation, such as this, where following the advice would result in both a significant financial outlay, and curtail (for a period) the ability of the charity to deliver its mission, which is primarily achieved through running trains.

    Reading between the lines, it appears to me that a couple of years ago there was existing advice that would have allowed the bridge to be repaired, at some cost, but in a way that preserved the ability to operate a service. The advisor then changed, and with it the advice, in a way that was much more impactful on the charity financially and operationally. To me, it seems that at that point, the directors were insufficiently curious about the evidence that led to a change of advice; and if, as seems the case, there is now a third piece of advice that is more aligned to the original situation from a couple of years ago, that is yet more damning.

    I am not advocating that the Directors should invariably ride roughshod over inconvenient advice about the state of their assets; and nor am I saying that as evidence is acquired, it is unknown for a situation to become steadily worse in outlook. But it seems in this case that at one point the railway had a plan, and then got new advice that suggested much greater expenditure, and in that situation they went forward without much of a plan about how they would find the money, nor seemingly having done the due diligence to see if that additional expenditure was actually warranted.

    Tom
     
    jnc, ghost, Enterprise and 5 others like this.
  7. 21B

    21B Part of the furniture

    Joined:
    Sep 2, 2009
    Messages:
    5,474
    Likes Received:
    13,054
    The discussion got a bit sidetracked by some correct, but not relevant legal considerations.

    It is easy in situations like that which the board would have faced as described by @Jamessquared to lose sight of the real underlying problem.

    Whilst tempting to take professional advice at face value, that is very rarely sensible. Advice is just that. The responsibility lies with the board(s).

    That is not to say that I would or ever have simply dismissed expert advice, but I have always both with engineering issues and legal issues always asked questions, and often sought alternative views before coming to a decision. That’s not to say I would have come to a different conclusion than in this situation of course, just that I think the board owes it’s stakeholders an explanation of events.
     
    jnc likes this.
  8. 60044

    60044 Well-Known Member

    Joined:
    Feb 24, 2016
    Messages:
    1,759
    Likes Received:
    2,378
    Gender:
    Male
    Location:
    Salisbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There are a few points in this and previous posts that warrant some comment, I feel. Firstly, although it may have been an inadvertent use of the term, the railway should not have been relying on a "contractor" to give advice on the method of repairing the bridge! That advice should have been coming from an experienced bridge engineer - I would have thought that a suitable source of advice might have been the NR Regional CE's office, which is presumably at York. Wherever the advice came from, it should have been provided as a written report that should have been made available to the Plc and Trust Boards for scrutiny and comments. There should have been the opportunity to question the engineer(s) on a face to face basis, but I don't think that happened, nor did anyone press for it. The fact that it doesn't seem to have been poses questions about the abilities of the board members "selected" by the recruitment committee. In this case, decisions seem to have been taken almost on a whim, and that hardly provides evidence of competent management and decision taking, nor of provision of sound advice to the policy-making body, and/or the executing body. It also speaks, to me at least, volumes about the seriousness with which both those bodies take their monitoring roles. If I was writing their school reports I'd mark them both "E - need to try a lot harder"
     
    Steve and jnc like this.
  9. 21B

    21B Part of the furniture

    Joined:
    Sep 2, 2009
    Messages:
    5,474
    Likes Received:
    13,054
    If you are right about the board not questioning this in the manner you describe, then there is a bigger issue about governance generally.
     
    Steve, jnc, Eadington and 2 others like this.
  10. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    Joined:
    Oct 2, 2015
    Messages:
    10,246
    Likes Received:
    8,660
    Gender:
    Male
    Location:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That of course assumes that there is anyone on the board who knows enough to ask those probing questions on a really technical issue. Maybe whoever the "engineering" board member would, but bridge work must be a pretty specialist field. Surely the real skill would be in making sure you chose the right expert in the first place.
    Having said that , and as a third party contractor you obviously have to be far more polite, but thinking back to my employment, board members would probably been told to get back in their box if they were probing engineering on technical issues.
    Why would NR be a source of advice for a Heritage Railway? They are a public funded body, who barely seem able to keep up their own network, why would, or in my view should, they be diverting scarce resource elsewhere and away from their primary function. And who would pay if their advice was wrong, not HMG I suspect.
     
    jnc likes this.
  11. 35B

    35B Nat Pres stalwart

    Joined:
    Jun 18, 2011
    Messages:
    33,360
    Likes Received:
    37,053
    Gender:
    Male
    Location:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If true, I agree. On the basis of what's discussed here, I don't think there's evidence to take a view either way on how information was provided to the PLC &/or Trust boards, or how they considered that information.

    In general, I'm also reluctant to automatically assume that, because a bad thing happened, that outcome was because of bad conduct or process. Good people, well advised, and following good process may still make errors or fail to understand things fully.
    I agree that the role of a board is not to interrogate a detailed engineering report at a technical level. However, what I would expect them to do is verify the credibility of that report, and also to seek to understand both the implication of the decision they're being asked to take, and to assure themselves that those implications are fully understood. In this case, that would in my view include a strong element of "what's changed so dramatically" - a question to which there has never been much of an answer since the closure was announced. Given recent posts by @Lineisclear on this subject, my fear would be that the decision was driven by fear of legal liability, rather than seeking to probe to obtain a rounded view of the actual level of risk associated with the bridge.
    I would expect any report of this kind to be backed up by professional liability insurance - which might or might not be a factor in NR's willingness (or not) to provide consultancy advice.
     
    jnc and Spitfire like this.
  12. 60044

    60044 Well-Known Member

    Joined:
    Feb 24, 2016
    Messages:
    1,759
    Likes Received:
    2,378
    Gender:
    Male
    Location:
    Salisbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I mentioned York because that is where a lot of the civil engineering expertise on the NYMR originated from, and where I might expect to find some institutional goodwill to be located. The NYMR might be a rural backwater by NR standards, but I suspect there are still a few similar bridges dotted around the NR network of a similar vintage they are responsible for and have some experience of. Had something similar happened at Swanage, wouldn't you have expected the management there to have had at least a chat with the corresponding office in Southampton (or wherever it is)?
     
    jnc likes this.
  13. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    Joined:
    Oct 2, 2015
    Messages:
    10,246
    Likes Received:
    8,660
    Gender:
    Male
    Location:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    No not really, at least in any official capacity.
     
  14. 35B

    35B Nat Pres stalwart

    Joined:
    Jun 18, 2011
    Messages:
    33,360
    Likes Received:
    37,053
    Gender:
    Male
    Location:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think there's a difference between professional networks and goodwill, and formal advice. The first is useful, and can help qualify an issue and focus attention on how best to deal with it. The second is more difficult and, where done on an informal basis, exposes both advisor and recipient to detriment.

    In a wholly unrelated area, I am using an accountant to help with a probate matter. The basics of establishing the terms of engagement (including fees!), and setting some parameters around scope, are vital. If I did this on a "phone a friend" basis, there's a real risk that I'd get advice that didn't know the whole story, and where our expectations simply wouldn't align. Again, I repeat my church architect comparison - including the reliance on non-experts to both provide instructions and interpret advice.
     
    jnc and ghost like this.
  15. 60044

    60044 Well-Known Member

    Joined:
    Feb 24, 2016
    Messages:
    1,759
    Likes Received:
    2,378
    Gender:
    Male
    Location:
    Salisbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    So they wouldn't ask for advice at all? You surprise me!
     
  16. Sawdust

    Sawdust Member

    Joined:
    Jul 18, 2015
    Messages:
    760
    Likes Received:
    1,342
    Gender:
    Male
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    To bring things back around again, how are other railways filling the chief civil engineer role?

    Sawdust.
     
  17. Lineisclear

    Lineisclear Well-Known Member

    Joined:
    May 24, 2020
    Messages:
    1,746
    Likes Received:
    1,596
    Gender:
    Male
    Location:
    Worcestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Faced with new evidence about the state of the bridge a second opinion was obtained from qualified consulting bridge engineers and experienced volunteers. That confirmed that on the evidence then ascertainable the bridge was unsafe to run on. Bearing in mind the earlier observations about potential liability it would be a very foolish board that decided to prioritise revenue over safety.
     
    jnc likes this.
  18. 35B

    35B Nat Pres stalwart

    Joined:
    Jun 18, 2011
    Messages:
    33,360
    Likes Received:
    37,053
    Gender:
    Male
    Location:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thank you for the clarification. What would also be interesting - but in all probability not something you'd be in a position to answer - is what then changed to cause a reassessment back to the previous view. I don't mean the core samples here so much as why the result of those were so much more positive than what had preceded them.
     
    jnc likes this.
  19. jnc

    jnc Well-Known Member

    Joined:
    Apr 3, 2012
    Messages:
    1,889
    Likes Received:
    3,255
    Gender:
    Male
    Location:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I seem to recall this point having been raised in the now-distant past, when the line changed the way in which choices were made, about changing the process of choosing to whom the responsibility of management would be entrusted. That attempt to raise a red flag about that change (if my now-dim memory of long-past events can be trusted) did not succeed in prompting a change of proposed course. We are now apparently seeing the results of that decision to ignore said red flag.

    Noel
     
  20. Steve

    Steve Nat Pres stalwart Friend

    Joined:
    Oct 7, 2006
    Messages:
    13,807
    Likes Received:
    14,900
    Occupation:
    Gentleman of leisure, nowadays
    Location:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    What happens at board meetings is a well kept secret. There are no longer any minutes or even reports published for volunteers/members to read and digest. Trust board members have been warned about discussing things outside the board so most of what is known is obtained unofficially. I get some of my information from a volunteer who gets it from someone able to say what's going on and I'm in contact with a few other well connected volunteers. However, in the end, it's all hearsay even though it usually has a large element of truth.
     
    jnc and Sawdust like this.

Share This Page