If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Southwold Railway

Discussion in 'Narrow Gauge Railways' started by Bar Side, May 7, 2012.

  1. James Hewett

    James Hewett Member

    Joined:
    Aug 19, 2015
    Messages:
    245
    Likes Received:
    1,043
    Gender:
    Male
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Hi - as far as I know, all CT locos were diesel, including the Hunslet rack locos (we have one whihc worked above ground, an RFS 4WDH - it is now up for sale, in fact may be already sold). Still, if they also had BEs on 900mm, that'd be interesting, as with the wide wheels they are JUST possible to accommodate on three-foot, by adjusting pointwork check rails. James
     
  2. bantamd14

    bantamd14 New Member

    Joined:
    Jan 21, 2017
    Messages:
    150
    Likes Received:
    102
    Gender:
    Male
    Location:
    Stafford
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    James, thanks for putting me straight. I just assumed those working underground would be battery.
     
  3. Steve

    Steve Nat Pres stalwart Friend

    Joined:
    Oct 7, 2006
    Messages:
    13,807
    Likes Received:
    14,900
    Occupation:
    Gentleman of leisure, nowadays
    Location:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Wouldn’t using 900 gauge locos on 3 foot gauge track make them liable to yaw on straight track and moving the check rails potentially create problems if running true 3 foot gauge locos and stock? Check rails have a purpose.
     
  4. James Hewett

    James Hewett Member

    Joined:
    Aug 19, 2015
    Messages:
    245
    Likes Received:
    1,043
    Gender:
    Male
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes, it's not absolutely ideal - but needs must, sometimes! The RFS loco we have (900mm gauge) has its wheel back-to-backs set at 841mm, which is only 7mm (and therefore 3.5mm each side) narrower than the Southwold Railway's original 848mm. We have been running this loco together with three-foot-gauge stock on our workshop test track (which intentionally includes a sharpish point and some very sharp curves) for a while - it's a matter of adjusting both wing rail and check rail distances to compromise. However, now we are selling the RFS, we can re-adjust the checks and wings to our wider B to Bs - the Royal Navy wagons we are using have considerably narrower wheels than the original SR stock, so give us less leeway.
    James
     
  5. kscanes

    kscanes Resident of Nat Pres

    Joined:
    Jan 1, 2008
    Messages:
    10,620
    Likes Received:
    5,161
    Not really relevant to the thread but as a point of accuracy, perhaps half of the narrow gauge locos used on the UK side of the Channel Tunnel contract were combined battery electric / ohw electric, including all but two of the twenty rack locos. Only one or two electrics escaped scrapping at the end of the contract. Even if there were any still kicking around I suspect they would have been somewhat over powered and over weight for you; if I recall correctly they started at 170hp or so, and went up to 350hp for the rack locos.
     
    Last edited: Nov 8, 2026
  6. hoffman

    hoffman New Member

    Joined:
    Aug 7, 2016
    Messages:
    55
    Likes Received:
    57
    Gender:
    Male
    Location:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
  7. ross

    ross Well-Known Member

    Joined:
    May 18, 2017
    Messages:
    1,097
    Likes Received:
    2,744
    Gender:
    Male
    Location:
    Titfield
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  8. James Hewett

    James Hewett Member

    Joined:
    Aug 19, 2015
    Messages:
    245
    Likes Received:
    1,043
    Gender:
    Male
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Only a very thick skin - and the ability not to take no for an answer, and to persevere, against all odds (and some say, against all sense...) After all, the answer has been no for almost 100 years, in reaction to the very many attempts to restore the SR.

    NB you should see our PP conditions - they get more onerous every time - and more costly. (Saying that, I well remember that when building the RhE/WHR northwards from Pen-y-Mount Junction, over 20 years ago, 50% of all the spending was on consultants....here it is likely to be at least that percentage) James
     
    MuzTrem likes this.
  9. Bikermike

    Bikermike Well-Known Member

    Joined:
    Mar 11, 2020
    Messages:
    2,324
    Likes Received:
    2,666
    Gender:
    Male
    Location:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I am deeply curious as to how one "flaunts" planning permission. Do you wave it ostentatiously around the village?
     
  10. James Hewett

    James Hewett Member

    Joined:
    Aug 19, 2015
    Messages:
    245
    Likes Received:
    1,043
    Gender:
    Male
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Apparently the fact that our (contingent) success has been reported in the local press is considered "flaunting". Though said press does tend to quote the opposition much more than us, if they report at all. You do get the impression that anti-railway people around here are getting a bit desperate, because with the massive help of our planning specialist Trustee, we do keep on winning battles! (Although that often takes a substantial amount of time and cash).
    Back in the real world, we are still waiting for all the ts to be crossed on the environmental and ecological conditions, but meanwhile, rail and sleepers for Phase I (the metalled-in section, if you can characterise grass at top-of-rail height as such) are now onsite and being worked on. I spent today in the freezing wind fettling-up the fishplates - which are the most bizarre I have ever handled - they are handed, so top and bottom are radically different, and are also about 30% longer than normal.
    James
     
    Mark Thompson, mdewell and Wenlock like this.
  11. Wenlock

    Wenlock Well-Known Member Friend

    Joined:
    Oct 26, 2008
    Messages:
    2,262
    Likes Received:
    1,500
    Gender:
    Male
    Occupation:
    Bus Driver
    Location:
    Loughton Essex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    When you say top and bottom differ, do you mean like the 'skirted' fishplates used on heavy duty standard gauge bullhead?
     
  12. James Hewett

    James Hewett Member

    Joined:
    Aug 19, 2015
    Messages:
    245
    Likes Received:
    1,043
    Gender:
    Male
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Not quite - these look initially like conventional NG FB plates, but because the rail section is so odd (very wide foot, and some sinuous curves between web and head), on one edge there is a reasonably conventional chamfer, while the other has a very exaggerated chamfer like the blade in a pair of scissors....I will try to get some pics next time I am at the workshop. Apologies to all those (probably most of you) who are already bored with this - I have to admit to being a track fanatic - one who thinks that a locomotive is only useful to test the track, but would never admit it (woops).....
    James
     
    Miff and Mark Thompson like this.

Share This Page