If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

How many preserved railways now have main line connections ?

الموضوع في 'Heritage Railways & Centres in the UK' بواسطة abc, بتاريخ ‏22 مارس 2010.

  1. Fraser

    Fraser New Member

    إنضم إلينا في:
    ‏29 ماي 2009
    المشاركات:
    4
    عدد المعجبين:
    0
    The Middleton Railway in Leeds still has a main line connection. Although I don't think that it's been used since the 1990's?
     
  2. SillyBilly

    SillyBilly Member

    إنضم إلينا في:
    ‏19 ماي 2007
    المشاركات:
    512
    عدد المعجبين:
    6
    الوظيفة:
    Student
    مكان الإقامة:
    Penrhyndeudraeth
    Welsh Highland Railway
     
  3. laplace

    laplace New Member

    إنضم إلينا في:
    ‏19 فبراير 2010
    المشاركات:
    89
    عدد المعجبين:
    0
    This thread lists track connections, which the WHR can't have because of the gauge difference. If you're looking for a list of easy foot connections, see here.
     
  4. SillyBilly

    SillyBilly Member

    إنضم إلينا في:
    ‏19 ماي 2007
    المشاركات:
    512
    عدد المعجبين:
    6
    الوظيفة:
    Student
    مكان الإقامة:
    Penrhyndeudraeth
    The WHR shares metal with Network Rail so it's actually just as connected to the mainline as the NYMR.
     
  5. Dan Hill

    Dan Hill Part of the furniture

    إنضم إلينا في:
    ‏1 أوت 2008
    المشاركات:
    2,755
    عدد المعجبين:
    840
    الجنس:
    ذكر
    الوظيفة:
    Brick Machine Operator
    مكان الإقامة:
    Haywards Heath
    Heritage Railway Volunteer:
    No I do not currently volunteer
    And going west a bit potentially in the future Haywards Heath.
     
  6. steamybrian

    steamybrian New Member

    إنضم إلينا في:
    ‏5 جويلية 2008
    المشاركات:
    144
    عدد المعجبين:
    2
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    South East England
    Correction to reply of "Jay" on 1st April.
    When the Spa Valley Railway opens its future extension to Eridge it will run parallel with the Network Rail line for approx. one mile. Passengers will be able to interchange at Eridge by using the footbridge between the platforms.
    There will however be no physical connection between the tracks and there are no future plans to do so. The Uckfield line is remotely controlled from Oxted Panel Box (15 miles from Eridge) so the cost of installing any connections is very, very expensive.
     
  7. 504

    504 New Member

    إنضم إلينا في:
    ‏12 ديسمبر 2008
    المشاركات:
    154
    عدد المعجبين:
    1

    BUT FOR HOW MUCH LONGER ???
     
  8. DJH

    DJH Member

    إنضم إلينا في:
    ‏18 أوت 2009
    المشاركات:
    666
    عدد المعجبين:
    10
    الجنس:
    ذكر
    الوظيفة:
    Graduate Engineer
    مكان الإقامة:
    London
    On the MOSI connection I have not heard anything about it being lost and I am not going to speculate on the matter.

    Regards
    Duncan
     
  9. s1m0nad

    s1m0nad New Member

    إنضم إلينا في:
    ‏30 يناير 2009
    المشاركات:
    95
    عدد المعجبين:
    19
    At the risk of changing this to a 'trains using mainline connections' thread, and following on from the images of the class 66 ballast trains working onto the West Somerset, I found these pictures of 66430 delivering a ballast train to the Mid Norfolk railway this week http://colrailspics.fotopic.net/c1842040.html

    Simon
     

مشاركة هذه الصفحة