If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

How many preserved railways now have main line connections ?

本贴由 abc2010-03-22 发布. 版块名称: Heritage Railways & Centres in the UK

  1. Fraser

    Fraser New Member

    注册日期:
    2009-05-29
    帖子:
    4
    支持:
    0
    The Middleton Railway in Leeds still has a main line connection. Although I don't think that it's been used since the 1990's?
     
  2. SillyBilly

    SillyBilly Member

    注册日期:
    2007-05-19
    帖子:
    512
    支持:
    6
    职业:
    Student
    所在地:
    Penrhyndeudraeth
    Welsh Highland Railway
     
  3. laplace

    laplace New Member

    注册日期:
    2010-02-19
    帖子:
    89
    支持:
    0
    This thread lists track connections, which the WHR can't have because of the gauge difference. If you're looking for a list of easy foot connections, see here.
     
  4. SillyBilly

    SillyBilly Member

    注册日期:
    2007-05-19
    帖子:
    512
    支持:
    6
    职业:
    Student
    所在地:
    Penrhyndeudraeth
    The WHR shares metal with Network Rail so it's actually just as connected to the mainline as the NYMR.
     
  5. Dan Hill

    Dan Hill Part of the furniture

    注册日期:
    2008-08-01
    帖子:
    2,757
    支持:
    841
    性别:
    职业:
    Brick Machine Operator
    所在地:
    Haywards Heath
    Heritage Railway Volunteer:
    No I do not currently volunteer
    And going west a bit potentially in the future Haywards Heath.
     
  6. steamybrian

    steamybrian New Member

    注册日期:
    2008-07-05
    帖子:
    144
    支持:
    2
    性别:
    职业:
    Retired
    所在地:
    South East England
    Correction to reply of "Jay" on 1st April.
    When the Spa Valley Railway opens its future extension to Eridge it will run parallel with the Network Rail line for approx. one mile. Passengers will be able to interchange at Eridge by using the footbridge between the platforms.
    There will however be no physical connection between the tracks and there are no future plans to do so. The Uckfield line is remotely controlled from Oxted Panel Box (15 miles from Eridge) so the cost of installing any connections is very, very expensive.
     
  7. 504

    504 New Member

    注册日期:
    2008-12-12
    帖子:
    154
    支持:
    1

    BUT FOR HOW MUCH LONGER ???
     
  8. DJH

    DJH Member

    注册日期:
    2009-08-18
    帖子:
    666
    支持:
    10
    性别:
    职业:
    Graduate Engineer
    所在地:
    London
    On the MOSI connection I have not heard anything about it being lost and I am not going to speculate on the matter.

    Regards
    Duncan
     
  9. s1m0nad

    s1m0nad New Member

    注册日期:
    2009-01-30
    帖子:
    95
    支持:
    19
    At the risk of changing this to a 'trains using mainline connections' thread, and following on from the images of the class 66 ballast trains working onto the West Somerset, I found these pictures of 66430 delivering a ballast train to the Mid Norfolk railway this week http://colrailspics.fotopic.net/c1842040.html

    Simon
     

分享此页面