Good News from the Bluebell

Тема в разделе 'Heritage Railways & Centres in the UK', создана пользователем gavin, 14 ноя 2009.

  1. Dan Hamblin

    Dan Hamblin Part of the furniture

    Дата регистрации:
    27 мар 2006
    Сообщения:
    2.549
    Симпатии:
    190
    Род занятий:
    Rolling Stock Engineer
    Адрес:
    Kent
    There is also welded rail on the KESR Northiam to Bodiam section I think.

    Regards,

    Dan
     
  2. Ploughman

    Ploughman Part of the furniture

    Дата регистрации:
    1 апр 2008
    Сообщения:
    5.969
    Симпатии:
    2.761
    Род занятий:
    Ex a lot of things.
    Адрес:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There are numerous welded joints on the NYMR with the latest being installed on Bridge 30.
    It should be remembered that no more than 120ft should be welded up without a joint, unless being installed as CWR with Adjustment switches installed and set correctly according to temperature.
    I believe 2 Preserved lines in the country have CWR currently.
    Gloucester and Worcester on the approach to Racecourse station installed as a noise reduction measure.
    Weardale inherited from BR days in various locations.
    Unless anyone knows of any more?
     
  3. John2

    John2 Member

    Дата регистрации:
    3 сен 2007
    Сообщения:
    225
    Симпатии:
    68
    700 yards of CWR installed on the Severn Valley Railway in March 2009 at Kidderminster.
     
  4. Sinclair

    Sinclair New Member

    Дата регистрации:
    6 окт 2009
    Сообщения:
    39
    Симпатии:
    0
    The plan is (or at least was!) that Typhoon and the RHDR train carriages will run down the Ardingly branch spur from Horsted Keynes in the four foot!
     
  5. Orion

    Orion Well-Known Member

    Дата регистрации:
    17 авг 2009
    Сообщения:
    1.355
    Симпатии:
    5
    Род занятий:
    Pensioner!
    Адрес:
    North-west London
    Could anybody confirm how close 'Baxter' is to steaming? The next two weekends are the railway's 'Family Fun Weekends' and the loco is scheduled to appear.

    Incidently, my experience of going to the railway on one of these weekends is that they are good for the railway enthusiast too! The railway runs an intensive service with most of the small locos in steam. Well worth a visit.

    http://www.bluebell-railway.co.uk/bluebell/loco_roster.html

    Regards
     
  6. Jamie C. Steel

    Jamie C. Steel Member

    Дата регистрации:
    3 янв 2006
    Сообщения:
    903
    Симпатии:
    103
    Пол:
    Мужской
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    About 16-20 track panels on the GCR Down Main between the Down Auto-Distant and Down Home at Quorn are installed as CWR with breathers to provide a sound test facility.
     
  7. Sinclair

    Sinclair New Member

    Дата регистрации:
    6 окт 2009
    Сообщения:
    39
    Симпатии:
    0
    Hi Orion!

    Sadly Baxter will not be ready for this coming weekend, the first one of the Family Fun Days. 178 will take the place of shunting Baxter's trucks at Horsted Keynes (with me keeping those naughty trucks under control on the Saturday!).

    If Baxter is then ready for the second weekend then 178 will double head with 592. Check back here or on our Facebook for updates.

    There'll also be some extension train and Bluebell 50 Gala news in the next few days too!
     
  8. Sinclair

    Sinclair New Member

    Дата регистрации:
    6 окт 2009
    Сообщения:
    39
    Симпатии:
    0
    The RHDR train set will now be in the 'Down Yard' at Horsted Keynes. This is the one where the carriage shed is.
     
  9. Jamessquared

    Jamessquared Nat Pres stalwart

    Дата регистрации:
    8 мар 2008
    Сообщения:
    27.793
    Симпатии:
    64.457
    Адрес:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    She was in the works on Sunday looking, at a glance, pretty well complete except for the cab roof. There was a task list of 20 or 30 tasks to do; I didn't look in detail (I was working elsewhere and just passing...) but probably fair to say mostly of a "fettling" or "finishing" sort of nature. (For example, one that stuck in my mind - "fit builders' plates" - neither the highest nor lowest priority task listed, if that gives a clue). Even so, that many tasks takes time, even of each is relatively minor, so I suspect what the loco roster says, and Sinclair's later post, is probably a fair estimate.

    Tom
     
  10. Sinclair

    Sinclair New Member

    Дата регистрации:
    6 окт 2009
    Сообщения:
    39
    Симпатии:
    0
    Thanks for the detail there Tom.

    What I posted early came from tonight's commercial meeting, so is rather fresh from Director level!
     
  11. Orion

    Orion Well-Known Member

    Дата регистрации:
    17 авг 2009
    Сообщения:
    1.355
    Симпатии:
    5
    Род занятий:
    Pensioner!
    Адрес:
    North-west London
    Any good news re 'Baxter'? The engine was going to appear last weekend and is still advertised on the website.

    Regards
     
  12. Jamessquared

    Jamessquared Nat Pres stalwart

    Дата регистрации:
    8 мар 2008
    Сообщения:
    27.793
    Симпатии:
    64.457
    Адрес:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  13. Matt35027

    Matt35027 Well-Known Member

    Дата регистрации:
    16 окт 2009
    Сообщения:
    1.122
    Симпатии:
    143
    Пол:
    Мужской
    Род занятий:
    Builder
    Адрес:
    Near 74D
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Excellent news, now how many spoil trains will that pay for?
     
  14. 46118

    46118 Part of the furniture

    Дата регистрации:
    16 сен 2005
    Сообщения:
    4.043
    Симпатии:
    212
    Re: Bluebell's Operation Undercover moves forward

    Digging out this old thread, can I ask someone in the know what protection there is on the industrial estate side of the new shed and museum to prevent articulated lorries working down what now looks a fairly tight access to the industrial premises coming into contact with the side wall of new building?
    On the station side of the new building there are quite substantial concrete retaining walls, but apparently not on the other side. I have had a good look at the recent images on the Bluebell website.

    Thanks.
     