If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Pen-y-Mount

Dieses Thema im Forum 'Narrow Gauge Railways' wurde von lynton&barnstaple gestartet, 13 Juni 2010.

  1. AndrewT

    AndrewT Member

    Registriert seit:
    16 Oktober 2007
    Beiträge:
    735
    Zustimmungen:
    50
    Beruf:
    F&WHR Spin Doctor
    Ort:
    Maentwrog
    30 secs is what K1 took to cross. I timed it. Do you expect journalists to be able to tell the difference between an engine and a train?
     
  2. sycamore

    sycamore Member

    Registriert seit:
    17 August 2009
    Beiträge:
    596
    Zustimmungen:
    238
    Geschlecht:
    männlich
    Beruf:
    Guard & Signalman (E&BAR) / Driver (HVMR)
    Ort:
    Embsay or Bolton Abbey, sometimes in between...
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Most (including the BBC) call a derailment a crash!

    Regards
    Will
    Embsay
     
  3. Platelayer

    Platelayer Member

    Registriert seit:
    29 August 2008
    Beiträge:
    219
    Zustimmungen:
    29
    Do they own the land on which the track is laid?

    Presumably, if not, the platform face would not be correctly positioned to access trains?
     
  4. Fatbloke

    Fatbloke New Member

    Registriert seit:
    25 August 2006
    Beiträge:
    36
    Zustimmungen:
    0
    Ort:
    Cheshire
    The WHHR claim to own the land right up to the sleeper ends!
     
  5. TonyW

    TonyW New Member

    Registriert seit:
    23 Mai 2006
    Beiträge:
    165
    Zustimmungen:
    9
    Sorry, I thought he quoted what you told him. It will be a cold day in hell when journalists get their facts right or desist from lying.

    A few sums...

    Loco length is about 45 feet.
    Carriage length is about 33 feet.
    Say, six carriages + bike wagon in a train, so total train length is 45 + (33 x 7) = 276 feet
    Distance to travel over Britannia Bridge is about 310 feet
    10mph = 52800 / 60 = 880 feet per minute = approx 14.5 feet per second

    To work out the time you need to add the time it takes the train to pass a particular point to the time it takes the front of the train to cover the distance, so...
    276 / 14.5 = 19 seconds PLUS 310 / 14.5 = 21 seconds which gives a total of 40 seconds.

    To this needs to be added the time between the road crossing lights being activated and the train arriving on the bridge, so probably another 20 to 30 seconds to allow the traffic to clear. That puts the total up to at least one minute.

    It also assumes that the crossing speed will be 10mph which, and bearing in mind the curvature and the location, may not be achieved. If the speed were dropped to 5mph the crossing time would double to at least two minutes.
     
  6. Platelayer

    Platelayer Member

    Registriert seit:
    29 August 2008
    Beiträge:
    219
    Zustimmungen:
    29
    Mmm, up to the boundary fence I'd expect but not the sleeper ends!
     
  7. Christopher125

    Christopher125 Part of the furniture

    Registriert seit:
    30 November 2005
    Beiträge:
    2.846
    Zustimmungen:
    581
    Ort:
    Isle of Wight
    Its called maximising revenue, and without even enough basic infrastructure like undercover storage for all the soon-to-be operating loco's, thats the way it's going to be for the forseeable future.

    With regards to the 30sec crossing time, while this does seem ambitious at least i read somewhere that due to its layout a yellow box isnt appropriate so it wont need to be clear for trains to proceed.

    Chris
     
  8. SillyBilly

    SillyBilly Member

    Registriert seit:
    19 Mai 2007
    Beiträge:
    512
    Zustimmungen:
    6
    Beruf:
    Student
    Ort:
    Penrhyndeudraeth
    Look at the size of the loop at Pont Croesor, then look at Pen-y-Mount, not sure how you'd terminate a train there. 6 trains running THROUGH Port a day I'd have thought would be more likely as they only have 2 train sets, one does 2 trips a day, the other 1 currently.
     
  9. Sparky

    Sparky New Member

    Registriert seit:
    7 April 2010
    Beiträge:
    16
    Zustimmungen:
    2
    You only have to look at the other end of town on the big big trainset to see how long it takes for just a two car unit to cross including light activation times. I agree with probably a couple of minutes, longer if Port is crowded as it normally is in the summer and the pedestrian crossing nearby holds everything up. There might be a speed limit of 10mph but no way will the train go that fast unless the driver thrashes it over then slams the brakes on to stop at Harbour!

    S


     
  10. crantock

    crantock Member

    Registriert seit:
    22 November 2008
    Beiträge:
    528
    Zustimmungen:
    276
    Geschlecht:
    männlich
    Beruf:
    Beancounter
    Ort:
    Birmingham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Remember the Porthmadog bypass is being built. Far less cars will be passing over Britannia Bridge. Soon the journo's can start writing the "traders worry about loss of traffic" stories.
     
  11. AndrewT

    AndrewT Member

    Registriert seit:
    16 Oktober 2007
    Beiträge:
    735
    Zustimmungen:
    50
    Beruf:
    F&WHR Spin Doctor
    Ort:
    Maentwrog
    Fascinating factoid: The Welsh Highland cost £1.13 million a mile to build, including locos and rolling stock. The Port bypass is budgeted at £13.3 million a mile and you have to supply your own vehicles.
     
  12. SpudUk

    SpudUk Well-Known Member

    Registriert seit:
    5 Februar 2009
    Beiträge:
    1.736
    Zustimmungen:
    597
    Geschlecht:
    männlich
    Beruf:
    Project Manager
    Ort:
    Wales
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That is a lot of money
     
  13. DJH

    DJH Member

    Registriert seit:
    18 August 2009
    Beiträge:
    666
    Zustimmungen:
    10
    Geschlecht:
    männlich
    Beruf:
    Graduate Engineer
    Ort:
    London
    The WHR unlike the bypass also wont be a blot on the landscape!
     
  14. TonyW

    TonyW New Member

    Registriert seit:
    23 Mai 2006
    Beiträge:
    165
    Zustimmungen:
    9
    The by-pass will be used each year by probably 100 times as many people as use the WHR.
     
  15. Dumphrey

    Dumphrey New Member

    Registriert seit:
    29 März 2009
    Beiträge:
    119
    Zustimmungen:
    2
    Beruf:
    Retired company director
    Ort:
    A, A
    and you won't have to queue to cross the cob!!
     
  16. AndrewT

    AndrewT Member

    Registriert seit:
    16 Oktober 2007
    Beiträge:
    735
    Zustimmungen:
    50
    Beruf:
    F&WHR Spin Doctor
    Ort:
    Maentwrog
    Cheer up, Tony, it may never happen.
     
  17. TonyW

    TonyW New Member

    Registriert seit:
    23 Mai 2006
    Beiträge:
    165
    Zustimmungen:
    9
    Eh???
     
  18. AndrewT

    AndrewT Member

    Registriert seit:
    16 Oktober 2007
    Beiträge:
    735
    Zustimmungen:
    50
    Beruf:
    F&WHR Spin Doctor
    Ort:
    Maentwrog
    And which of the bypass or WHR will give people the most pleasure over the next 100 years?
     
  19. lostlogin

    lostlogin Member

    Registriert seit:
    9 Juli 2007
    Beiträge:
    444
    Zustimmungen:
    228
    I know you would like it to be the WHR, but for many of us the thought of not having to cue get across the cob and through Port will give me a tremendous amount of pleasure in years to come.

    Can we now stop this willy waving competition about what is the cheapest, biggest etc. It will be great when the WHR is complete and runing regularly into Port and equally many will appreciate the bypass when it comes into use.
     

Die Seite empfehlen