  1. Ann Clark

    Ann Clark Member

    Joined:
    Dec 5, 2007
    Messages:
    476
    Likes Received:
    2
    Location:
    Poole
    As far as I am aware the public do not object to paying full fare at Norden and the car park is often full as are the trains in the summer. In fact the delays are often caused by passenger numbers trying to get on and off trains.
     
  2. buzby2

    buzby2 Well-Known Member

    Joined:
    Mar 26, 2009
    Messages:
    1,626
    Likes Received:
    537
    Location:
    Swanage
    In BR [NSE] days there were some discussions about SR trains using a re-instated Up Bay platform. The costs of this would be massive in today's Railway however. The £3M estimated by Network Rail is for replacing signalling, as part of a bigger renewal scheme, with upgraded equipment to full passenger standards as well as additional work linking NR equipment to the new SR box at Corfe Castle. No money is allocated for any extra trackwork though I understand.

    Each year many tens of thousands of car drivers pay the Norden Park&Ride fee helping to ease Swanage's crowded streets and car parks during each Summer. This £2 daily fee is set by Purbeck District Council - although the Swanage Railway employs the car park staff.
    I don't think "passengers object to the steam service fare" and there is no subsidy of any sort from DCC, so far as I'm aware, to the Swanage Railway.
     
  3. buzby2

    buzby2 Well-Known Member

    Joined:
    Mar 26, 2009
    Messages:
    1,626
    Likes Received:
    537
    Location:
    Swanage
    The possibility mentioned by Lewisb06 is for a simple hand operated point to be installed near the Poole end of No.1 road Down Sidings. Remove the buffer stop and re-align the end of No.2 siding to link to the new point. Using No.2, and the existing points/signalling near Wareham box, will allow the remainder of any run-round move to be carried out on stock stabled in No.1 road. Possibly 7 or 8 coaches in No.1 might be run-round.
    Wareham's Up Bay could be re-instated in the long term perhaps. However the installation of a new lead from the Up Main, coupled with relaying a platform road plus run-round loop and head shunts, would cost a substantial amount of money - possibly £1M or even more?
    Finally, Google Earth may well show a SWT unit in the Down sidings - but how long ago were those satellite shots taken? Yesterday's rust looks rather aged.
     
  4. Dan Bennett

    Dan Bennett Member

    Joined:
    Mar 25, 2006
    Messages:
    478
    Likes Received:
    102
    Gender:
    Male
    Occupation:
    South Western Railway Fitter
    Location:
    Wareham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    they only used to keep a unit in the down sidings at wareham when the every stop service started from wareham
     