If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Collett Double is now a Collett Single 18th June 2011

本贴由 dizspell2011-06-10 发布. 版块名称: What's Going On

  1. dizspell

    dizspell New Member

    注册日期:
    2009-03-31
    帖子:
    10
    支持:
    0
    Vintage Trains has had to halve the number of engines on this trip due to ‘gauging issues’. I booked this trip in March to co-inside with a birthday but the trip was postponed until 18th June (not VT’s fault). I specifically booked this trip because it was being drawn by two Castles-never been on the main line behind two engines before, it then became a Castle and a Hall (again not VT’s fault) and now just a Castle (again not VT’s fault).
    Last time we went to Bristol behind a Castle it failed (although in our opinions VT did everything they possibly could that day). But the fact is we could have booked a journey to somewhere else other than Bristol but we booked it because it was double headed!
     
  2. leander

    leander Member

    注册日期:
    2007-07-05
    帖子:
    803
    支持:
    40
    性别:
    所在地:
    Wymington Beds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Not work rail strikes again
     
  3. campainr

    campainr Well-Known Member

    注册日期:
    2009-10-09
    帖子:
    1,398
    支持:
    53
    What a shame I was hoping to go to Hatton to see 4965 and 5043 absolutely tear the place apart like last time they came through back in 2009. I'll try a different location instead I suppose.
     
  4. Mikem

    Mikem Member

    注册日期:
    2007-07-12
    帖子:
    292
    支持:
    1
    所在地:
    Guildford, Surrey
    Oh well you may not have double locos but there is still that double chimney to look forward too!!

    Mike M. (70c)
     
  5. 6136

    6136 Member

    注册日期:
    2007-09-07
    帖子:
    366
    支持:
    40
    Having seen 5043 'tear the place apart' on it's own several times at Hatton I suggest staying put!!!
     
  6. camraman

    camraman Member

    注册日期:
    2009-08-21
    帖子:
    649
    支持:
    94
    性别:
    职业:
    Retired
    所在地:
    Hemel Hempstead
    I wonder why one castle is out of gauge and not the other. What is it? Weight, perhaps. Surely they are both in gauge height and width wise.
     
  7. saltydog

    saltydog Part of the furniture

    注册日期:
    2008-07-31
    帖子:
    2,566
    支持:
    70
    性别:
    职业:
    Retired
    所在地:
    Birmingham
    4965 Rood Ashton Hall was standing in for 5029 (due to other commitments) and it's the Hall that's out of gauge.
     
  8. buseng

    buseng Part of the furniture

    注册日期:
    2005-09-09
    帖子:
    4,801
    支持:
    349
    性别:
    职业:
    Retired
    所在地:
    Tilehurst, Reading, Berks.
    What is 5029 doing on the day? Nothing mentioned on uksteam for it.
     
  9. dizspell

    dizspell New Member

    注册日期:
    2009-03-31
    帖子:
    10
    支持:
    0
    And nothing on 5029's website either!
     
  10. campainr

    campainr Well-Known Member

    注册日期:
    2009-10-09
    帖子:
    1,398
    支持:
    53
    Perhaps 5029 couldn't get a support crew together for that day.
     
  11. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    注册日期:
    2005-09-11
    帖子:
    36,449
    支持:
    9,908
    性别:
    职业:
    Retired-ish, Part time rail tour steward.
    所在地:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Very true, they all have normal lives to live as well as looking after a loco.
     
  12. GWRman

    GWRman New Member

    注册日期:
    2010-06-07
    帖子:
    168
    支持:
    244
    I remember seeing 5029 advertised for this train months ago (6 months at least). 5029 was then removed from the webpage being replaced by the Hall. I'm sure 5029's crew would have had more than enough notice.
     
  13. Sidmouth

    Sidmouth Resident of Nat Pres Staff Member Moderator

    注册日期:
    2005-09-12
    帖子:
    10,146
    支持:
    9,777
    性别:
    所在地:
    Alderan !
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The date for this was originally march (iirc) when both were rostered . The date was rescheduled to june at which point 5029 couldn't do it for whatever reason . Where is 5029 now ?
     
  14. Ben Jervis

    Ben Jervis Member

    注册日期:
    2008-12-24
    帖子:
    338
    支持:
    2
    5029 is at Tyseley awaiting its next duties at the TLW open day and The Cornishman (Bristol - Par and return) on July 10th.
     
  15. alrohomer

    alrohomer Member Friend

    注册日期:
    2011-03-18
    帖子:
    390
    支持:
    410
    性别:
    职业:
    Retired IT employee
    所在地:
    Solihull, West Midlands
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Not being an expert on these matters, could someone explain please what "out of gauge" is and what causes it?
    Thanks.
    Alan.
     
  16. Steve from GWR

    Steve from GWR Well-Known Member

    注册日期:
    2010-02-18
    帖子:
    1,292
    支持:
    14
    In a nutshell, it means some part of the loco would hit some part of the railway infrastructure on a particular route. It might be a bridge due to height, or a platform edge, or something else . Halls are pretty restricted in where they can go outside the former GWR, as the GWR built to a wider gauge than most other railways, and the Halls have particularly sticky-out cylinders I believe.
     
  17. alrohomer

    alrohomer Member Friend

    注册日期:
    2011-03-18
    帖子:
    390
    支持:
    410
    性别:
    职业:
    Retired IT employee
    所在地:
    Solihull, West Midlands
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Thanks Steve.
    Alan.
     
  18. 1472

    1472 Well-Known Member

    注册日期:
    2008-08-26
    帖子:
    1,954
    支持:
    2,639
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Or more exactly that the loco in question would not have the required minimum clearance to a particular lineside feature. This is not the exact science it might seem as track does move to some extent under traffic & when p/way or other work takes place new restrictions can arise or old ones can be removed.

    The tragedy is that having got a railway with certain gauge allowances, modern maintenance sometimes allows reduction rather than expansion of these dimensions.
     
  19. alrohomer

    alrohomer Member Friend

    注册日期:
    2011-03-18
    帖子:
    390
    支持:
    410
    性别:
    职业:
    Retired IT employee
    所在地:
    Solihull, West Midlands
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    So knowing that things can change, even if a loco has had clearance on a route previously then shouldn’t checks be made before publication of a loco being assigned to the route rather than it having to be “publicly” withdrawn later?
    And who is responsible for checking?
    Alan.
     
  20. leander

    leander Member

    注册日期:
    2007-07-05
    帖子:
    803
    支持:
    40
    性别:
    所在地:
    Wymington Beds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The problem is track is moved towards the platform as there is a wide gap on the modern units therefore gauging for steam is a problem
     

分享此页面