If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

70013 & 30777 ECML lineside fires 02/09/11.

Discuție în 'What's Going On' creată de sunstream, 2 Sep 2011.

  1. Neil_Scott

    Neil_Scott Part of the furniture

    Înscris:
    25 Apr 2008
    Mesaje:
    3.155
    Aprecieri primite:
    302
    Sex:
    Masculin
    Ocupație:
    Railway servant
    Locație:
    Worcester
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I tried for these kind of roles when I left Uni and got nowhere with them. When I went for interviews with Network Rail for my first signalling position they were fascinated with my experiences on the Talyllyn and Strathspey Railways, at my interviews I got asked questions that were for internal candidates only. You can use it to your advantage, don't give up - taking an operational job can lead to the management route later.
     
  2. Bulleid Pacific

    Bulleid Pacific Part of the furniture

    Înscris:
    14 Apr 2007
    Mesaje:
    4.030
    Aprecieri primite:
    1.089
    Ocupație:
    A Thingy...
    Thanks for the reply. Will take this into consideration.
     
  3. Spamcan81

    Spamcan81 Nat Pres stalwart

    Înscris:
    25 Aug 2007
    Mesaje:
    35.844
    Aprecieri primite:
    22.294
    Ocupație:
    Training moles
    Locație:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Oh dear. An ECT Class 91 has failed at Hitchin. Seems they don't need any help from steam locos when it comes to screwing up the ECML. I wonder what claptrap their spin doctors will come out with to explain this latest farce.
     
  4. Bulleid Pacific

    Bulleid Pacific Part of the furniture

    Înscris:
    14 Apr 2007
    Mesaje:
    4.030
    Aprecieri primite:
    1.089
    Ocupație:
    A Thingy...
    U-boat appeared in the four-foot north of Hitchin? N Power cut electricity off due to unpaid bills? Although the incident of 2 September was serious and has rightly attracted greater scrutiny towards mainline steam, if ECT have been using it to disguise their own failings, then their attitude towards running a TOC seems remarkably similar to FGW during the Forster years. Thankfully, we have put those years behind us, and FGW seems to have formed a positive working relationship with Vintage Trains. Perhaps we shall see the same with ECT.
     
  5. Spamcan81

    Spamcan81 Nat Pres stalwart

    Înscris:
    25 Aug 2007
    Mesaje:
    35.844
    Aprecieri primite:
    22.294
    Ocupație:
    Training moles
    Locație:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Certainly not trying to gloss over the incident on 2nd September. Later this evening we had an FCC unit fail south of Peterborough and screw things up for a while so the various TOCs seem perfectly capable of messing up without the help of steam. Trouble is, it's so easy to point the finger of blame at steam even though it's responsible for only a tiny proportion of the delays on the network as a whole. I agree that it would be nice if ECT and FCC could embrace heritage traction on the ECML and help facilitate tours rather than press for their curtailment.
     
  6. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    Înscris:
    11 Sep 2005
    Mesaje:
    36.452
    Aprecieri primite:
    9.911
    Sex:
    Masculin
    Ocupație:
    Retired-ish, Part time rail tour steward.
    Locație:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Would it be worth us, just for interest, logging all the delays for various reasons that we are aware of, over the next month or two just to get an idea of the scale.
     
  7. ADB968008

    ADB968008 Guest

    Doesn't Network Rail compile this information ?, do they publish it ?
     
  8. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    Înscris:
    11 Sep 2005
    Mesaje:
    36.452
    Aprecieri primite:
    9.911
    Sex:
    Masculin
    Ocupație:
    Retired-ish, Part time rail tour steward.
    Locație:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    There are some figures on the NR site but I was thinking of the number of actual events.. http://www.networkrail.co.uk/aspx/742.aspx
     
  9. guard_jamie

    guard_jamie Part of the furniture

    Înscris:
    7 Iul 2008
    Mesaje:
    2.503
    Aprecieri primite:
    27
    Sex:
    Masculin
    Ocupație:
    Signalman
    Locație:
    Herefordshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It's a thought that's occurred to me.

    Bulleid Pacific - they took ages with me. I got my application for an end of May deadline in in March, and only heard back from them mid-September. I rang them a couple of times, they said that they'd had over 200 applicants. And they are one of the better considered TOC's in enthusiast's eyes.
     
  10. KentYeti

    KentYeti Guest

    If I'm reading that right Ralph, then any extra delay on EC would be quite a problem!

    Would be nice to see a list of the significant delays they have. Whilst it will never be possible to play down the impact of the steam loco fire, it may just help put it into context.
     
  11. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    Înscris:
    11 Sep 2005
    Mesaje:
    36.452
    Aprecieri primite:
    9.911
    Sex:
    Masculin
    Ocupație:
    Retired-ish, Part time rail tour steward.
    Locație:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It's the total time involved that counts, cable theft on the TP route means that the local radio are often warning about the delays all day, ie perhaps 10 hours before things get back to normal.
     
  12. Bulleid Pacific

    Bulleid Pacific Part of the furniture

    Înscris:
    14 Apr 2007
    Mesaje:
    4.030
    Aprecieri primite:
    1.089
    Ocupație:
    A Thingy...
    Looks like we applied for the same TOC, if that's the case (judging by the deadline)!
     
  13. Dan Hamblin

    Dan Hamblin Part of the furniture

    Înscris:
    27 Mar 2006
    Mesaje:
    2.549
    Aprecieri primite:
    190
    Ocupație:
    Rolling Stock Engineer
    Locație:
    Kent
    I think the biggest problem is that the ECML is highly congested. It hasn't been upgraded again since the 1980s and in that time we've had a massive increase in ridership on Britains railways, with the subsequent increase in services by GNER, NEEC, ECT, Grand Central, FCC etc. Any cause of delay is therefore goign to have a serious knock on effect.

    Regards,

    Dan
     
  14. Edward

    Edward Member

    Înscris:
    19 Iul 2008
    Mesaje:
    424
    Aprecieri primite:
    8
    Locație:
    Midlands
    I'll second that. The railway is good at promoting from within, and the shop floor jobs often pay far more than equivalent roles in outside industry. As for graduate schemes - well I did one that was supposed to be "award winning", with a household name company. Load of c*** - driving trains is a far more satisfactory existence!
     

Distribuie pagina asta