46233 Duchess of Sutherland.

الموضوع في 'Steam Traction' بواسطة keith6233, بتاريخ ‏20 يناير 2011.

  1. keith6233

    keith6233 Member

    إنضم إلينا في:
    ‏21 إبريل 2006
    المشاركات:
    601
    عدد المعجبين:
    184
    الوظيفة:
    Engineer
    مكان الإقامة:
    Manchester
    Latest update here http://www.prclt.co.uk/New_6233_Overhaul.htm
     
  2. Steamage

    Steamage Part of the furniture

    إنضم إلينا في:
    ‏14 سبتمبر 2005
    المشاركات:
    4,748
    عدد المعجبين:
    1,121
    مكان الإقامة:
    Oxford
    Agreed. The "fast" examples quoted above were all in pretty good nick before the overhauls began. I seem to recall, from magazine articles, that RAH had had lots of things done during routine maintenance which other groups might have left for the overhaul. The net amount of time and money spent was probably the same (for the mileage) but the timing was different. It would appear that the Duchess was not hiding any nasty surprises this time.

    According to UKsteam.info, Princess Elizabeth's boiler certificate expires in March next year, so we will be without a Stanier pacific on the mainline for a little while but, given the progress reported so far, it probably won't be for very long.
     
  3. keith6233

    keith6233 Member

    إنضم إلينا في:
    ‏21 إبريل 2006
    المشاركات:
    601
    عدد المعجبين:
    184
    الوظيفة:
    Engineer
    مكان الإقامة:
    Manchester
    Really fast progress is being made since the return of the boiler last Tuesday,also some strange coloured paint going on.

    Take a look at the website.
     
  4. campainr

    campainr Well-Known Member

    إنضم إلينا في:
    ‏9 اكتوبر 2009
    المشاركات:
    1,398
    عدد المعجبين:
    53
    Wow - they can't stop! At this rate they'll be done by Christmas!
     
  5. D1963

    D1963 Member

    إنضم إلينا في:
    ‏7 أوت 2006
    المشاركات:
    512
    عدد المعجبين:
    1
    الجنس:
    ذكر
    مكان الإقامة:
    5B
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    10 months and 2 days after lifting, the boilers back in the frames !!!!
     
  6. Southernman99

    Southernman99 Member Friend

    إنضم إلينا في:
    ‏10 نوفمبر 2009
    المشاركات:
    946
    عدد المعجبين:
    698
    Money, Manpower and an effecient and thought out overhaul plan. Im betting it will be 14-15 months from boiler out to moving under her own power.
     
  7. campainr

    campainr Well-Known Member

    إنضم إلينا في:
    ‏9 اكتوبر 2009
    المشاركات:
    1,398
    عدد المعجبين:
    53
    Yes the boiler is now in the frames. http://www.prclt.co.uk/New_6233_Overhaul.htm (scroll down to bottom of page) What are they feeding these people? She's now closer to returning than "some other engines we know of" (!)
     
  8. Sheff

    Sheff Resident of Nat Pres

    إنضم إلينا في:
    ‏21 إبريل 2006
    المشاركات:
    8,058
    عدد المعجبين:
    3,137
    الجنس:
    ذكر
    الوظيفة:
    Retired Engineer & Heritage Volunteer
    مكان الإقامة:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    You've got to say that's impressive. Hats off to the team!
     
  9. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    إنضم إلينا في:
    ‏31 أوت 2010
    المشاركات:
    5,615
    عدد المعجبين:
    9,418
    الجنس:
    ذكر
    الوظيفة:
    Asset Engineer (Signalling), MNLPS Treasurer
    مكان الإقامة:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A turn around from deconstruction to reconstruction (and possibly steaming) in under a year is a truly impressive feat.
     
  10. campainr

    campainr Well-Known Member

    إنضم إلينا في:
    ‏9 اكتوبر 2009
    المشاركات:
    1,398
    عدد المعجبين:
    53
    We just hope they're not going too fast, eh members?
     
  11. eddief

    eddief Member

    إنضم إلينا في:
    ‏21 إبريل 2006
    المشاركات:
    304
    عدد المعجبين:
    1
    مكان الإقامة:
    Co. Durham
    Glad to se they are making excellent progress with the loco, can't wait to see it back where she belongs. Keep up the good work guys.
     
  12. HennersJames

    HennersJames New Member

    إنضم إلينا في:
    ‏17 جوان 2011
    المشاركات:
    64
    عدد المعجبين:
    0
    الوظيفة:
    MPD Cleaner - Bewdley, SVR
    مكان الإقامة:
    Birmingham
    Came across this today, it's 6229 making a brief appearance in Brunswick in 1998...a sneak preview of what we can expect from 6233!

    http://www.flickr.com/photos/neil_harvey_railway_photos/6195771697/

    I don't know what the chances of the photographer being on the forum, but if he sees this then hope he doesn't mind me showing it away!

    Henners
     
  13. CopyPit

    CopyPit New Member

    إنضم إلينا في:
    ‏21 جويلية 2006
    المشاركات:
    45
    عدد المعجبين:
    0
    مكان الإقامة:
    WEST YORKS
    Hi,
    The photographer is on the Forum, and no, I don't mind!

    Best Regards
    Copy pit
     
  14. HennersJames

    HennersJames New Member

    إنضم إلينا في:
    ‏17 جوان 2011
    المشاركات:
    64
    عدد المعجبين:
    0
    الوظيفة:
    MPD Cleaner - Bewdley, SVR
    مكان الإقامة:
    Birmingham
    Aha brilliant! Love the shots, being as I'm only 15 I've only seen a Duchess (in the flesh) in Crimson.
     
  15. 46223

    46223 Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏10 إبريل 2011
    المشاركات:
    6,693
    عدد المعجبين:
    6,342
    الجنس:
    ذكر
    مكان الإقامة:
    Lancs
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That makes me feel old. When I was 15 all 38 Duchesses were still in service!!
     
  16. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    إنضم إلينا في:
    ‏11 سبتمبر 2005
    المشاركات:
    36,443
    عدد المعجبين:
    9,907
    الجنس:
    ذكر
    الوظيفة:
    Retired-ish, Part time rail tour steward.
    مكان الإقامة:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I know the feeling....
     
  17. campainr

    campainr Well-Known Member

    إنضم إلينا في:
    ‏9 اكتوبر 2009
    المشاركات:
    1,398
    عدد المعجبين:
    53
    Looks like a cab to me.........

    [​IMG]

    These people must have some sort of condition - compulsive loco overhauling syndrome! How quick would Crewe have overhauled a Duchess? Surely they must be matching them over the last few days. Also what a great page that is keeping those of us in our armchairs up to date, whoever takes and posts these photos your efforts are much appreciated!:ranger:
     
  18. green five

    green five Resident of Nat Pres

    إنضم إلينا في:
    ‏30 إبريل 2006
    المشاركات:
    6,780
    عدد المعجبين:
    2,614
    الجنس:
    ذكر
    الوظيفة:
    Design Draughtsman
    مكان الإقامة:
    Hampshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Superb progress with 6233. Are they trying to beat Ian Riley's record for overhauling 45407?
     
  19. detheridge02

    detheridge02 New Member

    إنضم إلينا في:
    ‏17 جوان 2010
    المشاركات:
    181
    عدد المعجبين:
    41
    الوظيفة:
    Web Application Designer
    مكان الإقامة:
    Sheffield
    A great achievement indeed! 7 days from the boiler arriving on the back of a lorry to a near complete back head.
    So when's the first run? Shall we say a week on Friday? :faint2:

    Dave
     
  20. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    إنضم إلينا في:
    ‏11 سبتمبر 2005
    المشاركات:
    36,443
    عدد المعجبين:
    9,907
    الجنس:
    ذكر
    الوظيفة:
    Retired-ish, Part time rail tour steward.
    مكان الإقامة:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think you will find that that was less than 3 months and the vast majority of work was done in house, not sent out to contractors.
     