If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

The Cambrian cancelled for 2011 but back in 2012

本贴由 alastair2011-05-19 发布. 版块名称: What's Going On

  1. Bean-counter

    Bean-counter Part of the furniture

    注册日期:
    2007-07-21
    帖子:
    5,844
    支持:
    7,688
    性别:
    所在地:
    Former NP Member
    Heritage Railway Volunteer:
    No I do not currently volunteer
    "a" - wait a minute - maybe its a good job The Cambrian isn't running this year after I go giving 'em ideas, isn't it!?!

    Maybe that's the real reason those Scottish signalmen used to have bikes - the run across passnegers as they boarded!

    Steven
     
  2. malc

    malc Part of the furniture

    注册日期:
    2005-06-28
    帖子:
    2,475
    支持:
    330
    The word "seems" says it all!
     
  3. Jack-Maespoeth

    Jack-Maespoeth New Member

    注册日期:
    2011-11-30
    帖子:
    7
    支持:
    0
    职业:
    Locomotive Cleaner, Assistant Guard, Maintenance
    所在地:
    Mid Wales
    The Cambrian Has been completely removed from the WCRC's website!
     
  4. david1984

    david1984 Resident of Nat Pres

    注册日期:
    2005-09-13
    帖子:
    12,910
    支持:
    1,387
    性别:
    所在地:
    Birmingham
    I woulden't read too much into that, no point advertising for something until a plan to make it operational is viable, otherwise it's just wasting space on a website.
     
  5. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    注册日期:
    2005-09-11
    帖子:
    36,443
    支持:
    9,907
    性别:
    职业:
    Retired-ish, Part time rail tour steward.
    所在地:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
  6. leander

    leander Member

    注册日期:
    2007-07-05
    帖子:
    803
    支持:
    40
    性别:
    所在地:
    Wymington Beds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    After the fiasco with Spitfires trip on saturday,they were going to Pwellheli with the 97s but Network Rail said that only 5 coaches plus loco could go west of Barmouth in futcher so that would mean loco support and 4 coaches that is if steam is allowed in the futcher.Spitfire ended up at Aberyswyth.
     
  7. david1984

    david1984 Resident of Nat Pres

    注册日期:
    2005-09-13
    帖子:
    12,910
    支持:
    1,387
    性别:
    所在地:
    Birmingham
    While it will be a pain in the backside for now, hopefully it won't be permenant, as the stop boards (and the sections start/end programmed into ERTMS) can be changed, hardley any changes trackwise have taken place on the Coast route, so load 8 + still physically fits the loops, it's just a case of "computer says no" currently, not the hardest thing in the world to move a stop board and do a reprogramme of ERTMS, just a question of when/if.
     
  8. Bifur01

    Bifur01 Member

    注册日期:
    2012-06-20
    帖子:
    641
    支持:
    117
    Well, the whole world depends on computers these days...
    So sad that the Cambrian can't run this year, as it's one of my most waited for tours.
     
  9. Shoddy127

    Shoddy127 Well-Known Member

    注册日期:
    2005-06-01
    帖子:
    1,905
    支持:
    330
    性别:
    所在地:
    Portsmouth
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  10. Bulleid Pacific

    Bulleid Pacific Part of the furniture

    注册日期:
    2007-04-14
    帖子:
    4,030
    支持:
    1,088
    职业:
    A Thingy...
    Not only that, but I have yet to do Shrewsbury-Aberystwyth...
     
  11. david1984

    david1984 Resident of Nat Pres

    注册日期:
    2005-09-13
    帖子:
    12,910
    支持:
    1,387
    性别:
    所在地:
    Birmingham
    I've done Shrews - Machynlleth - Pwhelli, apart from Talerdigg, Salop - Mach is nothing to write home about and Im told the Aber branch isn't much better, north of Dovey Jcn blows the rest of the Cambrian out the water for scenary and performance interest.
     
  12. The Man

    The Man New Member

    注册日期:
    2010-04-18
    帖子:
    154
    支持:
    447
    性别:
    职业:
    Railwayman
    所在地:
    RUGBY
    Not quite the truth. There is certainly an issue with train length on the Branch (Dovey - Pwllheli) The real problem on Saturday was timings. The return would have to have left Pwllheli about 2 hours before it arrived to have any chance of getting back the same day. If NR want to permanently reduce the capacity of the line in terms of Train Length (or anything else) They will have to go through the network change procedure. I can think of at least 3 TOC/FOC's who will object.
     

分享此页面