If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Whats happening with 60007?

Discussie in 'Steam Traction' gestart door GORDON R POPE, 14 sep 2010.

Topicstatus:
Niet open voor verdere reacties.
  1. GORDON R POPE

    GORDON R POPE New Member

    Lid geworden:
    14 sep 2010
    Berichten:
    1
    Leuk Bevonden:
    0
    Can anyone advise on the latest progress on 60007.

    I have tried to obtain this information but am unable to find any answers.
     
  2. Bulleid Pacific

    Bulleid Pacific Part of the furniture

    Lid geworden:
    14 apr 2007
    Berichten:
    4.030
    Leuk Bevonden:
    1.089
    Beroep:
    A Thingy...
    The last I heard, they were going to do a full re-tube, so I presume this is still underway. I stand to be corrected, though...
     
  3. guycarr360

    guycarr360 Part of the furniture

    Lid geworden:
    4 okt 2005
    Berichten:
    4.838
    Leuk Bevonden:
    3.165
    Geslacht:
    Man
    Locatie:
    Chester le Street County Durham
    Passed its hydraulic test a couple of weeks ago, superheaters now going in.

    Website for the trust seems a bit slow to update, obviously busy...

    Hopefully running for gala at end of month.
     
  4. Steve

    Steve Resident of Nat Pres Friend

    Lid geworden:
    7 okt 2006
    Berichten:
    12.737
    Leuk Bevonden:
    11.853
    Beroep:
    Gentleman of leisure, nowadays
    Locatie:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As has been noted above, a full small re-tube has been carried out. On an A4 doing the actual re-tube is probably the easiest part of the task. Quite a bit of the smokebox needs dismantling to gain access, followed by the Kylchap. Then all the superheater elements need removing. These are, unfortunately of the Robinson type and not the more universal Melesco type so the ends have to be cut off and the bits cut out of the header. New ends then have to be welded onto the elements and these are then expanded into the header. When all this is done, the, Kylchap, smokebox and streamlining can be rebuilt.
    A return to steam is still a couple of weeks away.
     
  5. sunstream

    sunstream Member Friend

    Lid geworden:
    1 aug 2007
    Berichten:
    560
    Leuk Bevonden:
    147
    Locatie:
    York
    Many thanks Steve for that detailed reply.
     
  6. Oakfield

    Oakfield Guest

    Re: Crewe overhauls - 60009

    No just an accurate assessment of the situation after 60007 failed its test run at the NYMR today with injector troubles, I am informed.
     
  7. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    Lid geworden:
    11 sep 2005
    Berichten:
    36.453
    Leuk Bevonden:
    9.914
    Geslacht:
    Man
    Beroep:
    Retired-ish, Part time rail tour steward.
    Locatie:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Re: Crewe overhauls - 60009

    But I'm not sure that makes her "one permanent cripple".
     
  8. david1984

    david1984 Resident of Nat Pres

    Lid geworden:
    13 sep 2005
    Berichten:
    12.910
    Leuk Bevonden:
    1.387
    Geslacht:
    Man
    Locatie:
    Birmingham
    Re: Crewe overhauls - 60009

    Oakfield's choice of words was probably a little unfortunate, but he has a point, Sir Nigel doesn't seem to have had much luck in recent years.
     
  9. Oakfield

    Oakfield Guest

    Re: Crewe overhauls - 60009

    Well Ralph, In the past three years she has hardly earned any revenue as she lost 2010 with a partial re tube , 2011 wand the first half of 2012 with firebox repairs, both of which problems.can trace their roots back to the last overhaul.

    Having returned her to service for the NYMR Olympic torch train and the SNGLPT members day she has been out of traffic for a solid month and on today's test run she developed injector problems, again this has been an ongoing issue on and off, since the last overhaul.



    The business plans for funding the next overhaul must now be in tatters as they anticipated a revenue stream of £80k per year for each of the 10 years from the last overhaul to the next to cover running costs and put enough in the kitty for the overhaul.

    If that tale of woe does not qualify the loco in the past 3 years as a permanent cripple I don't know what does.

    Anyway, on a much more positive note, congratulations to J C and Crewe for a speedy overhaul on 60009.
     
  10. 61624

    61624 Part of the furniture

    Lid geworden:
    27 sep 2006
    Berichten:
    5.294
    Leuk Bevonden:
    3.599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Re: Crewe overhauls - 60009

    I'd suggest that the reason why 60007 is having some problems at the moment is that over the years it has done a lot more work than either of its two more pampered classmates. I think it is generally accepted that the A4s were withdrawn from BR with plenty of life left in them, but that residual life has gradually been used up and that is what is being manifested in 60007, which I think has required far more extensive boiler repairs than the other two have to date.
     
  11. Oakfield

    Oakfield Guest

    Re: Crewe overhauls - 60009


    Interesting and novel theory! A long way from realit5y though.
     
  12. 61624

    61624 Part of the furniture

    Lid geworden:
    27 sep 2006
    Berichten:
    5.294
    Leuk Bevonden:
    3.599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Re: Crewe overhauls - 60009

    Interesting and novel theory! A long way from realit5y though.


    Perhaps you'd care to favour us with yours then?
     
  13. Oakfield

    Oakfield Guest

    Re: Crewe overhauls - 60009

    The problems all date back to certain decisions made during the last major overhaul. Beyond that I will go no further.
     
  14. GWR4707

    GWR4707 Nat Pres stalwart

    Lid geworden:
    12 mei 2006
    Berichten:
    19.245
    Leuk Bevonden:
    17.588
    Geslacht:
    Man
    Locatie:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Re: Crewe overhauls - 60009

    Well thats cleared that up them!
     
  15. jonathonag

    jonathonag Well-Known Member

    Lid geworden:
    11 mei 2006
    Berichten:
    1.626
    Leuk Bevonden:
    3.142
    Beroep:
    Railway Engineer
    Locatie:
    Cowdenbeath
    Crewe overhauls - 60009

    61254 : I'd also like to see how you can justify that No. 7 has done a lot more work over the years than No. 9? Bittern, yes, has spent a lot of time out of service between overhauls. But No. 60009 has been pretty much constant service, out for a few years for an overhaul, and back in to service straight after?

    In fact, I'm sure No. 9 currently holds the highest accumulative milage for any of it's class. Sure, you can begin to argue that No. 7 spends a lot of her time climbing hills at NYMR during preservation- but No. 9 has had her fair share too - Torbay's, highland mainline etc...
     
  16. jonathonag

    jonathonag Well-Known Member

    Lid geworden:
    11 mei 2006
    Berichten:
    1.626
    Leuk Bevonden:
    3.142
    Beroep:
    Railway Engineer
    Locatie:
    Cowdenbeath
    Crewe overhauls - 60009

    * meant to say '61264'. iPhones are never the greatest tools for writing with....
     
  17. std tank

    std tank Part of the furniture

    Lid geworden:
    20 sep 2005
    Berichten:
    3.928
    Leuk Bevonden:
    1.071
    Geslacht:
    Man
    Beroep:
    Retired
    Locatie:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Re: Crewe overhauls - 60009

    61624?
     
  18. jonathonag

    jonathonag Well-Known Member

    Lid geworden:
    11 mei 2006
    Berichten:
    1.626
    Leuk Bevonden:
    3.142
    Beroep:
    Railway Engineer
    Locatie:
    Cowdenbeath
    Crewe overhauls - 60009

    Thank you std tank! Got there eventually!
     
  19. 61624

    61624 Part of the furniture

    Lid geworden:
    27 sep 2006
    Berichten:
    5.294
    Leuk Bevonden:
    3.599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Re: Crewe overhauls - 60009

    60007 was one of the earliest locos to return to the main line, well before 60009, and I believe tha for a long time it did a lot more mileage than 60009 , which largely confined to Scotland. More recently 60007 has done lot more preserved line running, not just at the NYMR but also at the ELR and MHR. If someone had an accurate figure for the accummulatede mileage in preservation it would make an interesting comparison.
     
  20. guycarr360

    guycarr360 Part of the furniture

    Lid geworden:
    4 okt 2005
    Berichten:
    4.838
    Leuk Bevonden:
    3.165
    Geslacht:
    Man
    Locatie:
    Chester le Street County Durham
    Re: Crewe overhauls - 60009

    That figure is available on the locos website.
     
Topicstatus:
Niet open voor verdere reacties.

Deel Deze Pagina