If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

FR/WHR questions

Discussie in 'Narrow Gauge Railways' gestart door lynton&barnstaple, 26 aug 2012.

  1. Miff

    Miff Part of the furniture Friend

    Lid geworden:
    17 jun 2008
    Berichten:
    3.040
    Leuk Bevonden:
    3.119
    The phase 5 site says that is the initial objective, "with more carriages to follow as demand rises".
     
  2. pete2hogs

    pete2hogs Member

    Lid geworden:
    16 okt 2007
    Berichten:
    721
    Leuk Bevonden:
    418
    To be honest, I suppose the earlier comment (forget from whom) that the passenger numbers are up again this year despite the lack of any new attraction and the dismal holiday season suggests the PTB's are pretty much getting it right with the resources they have. Given the time needed to ramp up said resources I doubt we'll see any big change in the service until 2014 at the earliest. I can imagine all sorts of things I'd like them to do, but if I was running it it'd probably go broke!
     
  3. mickpop

    mickpop Resident of Nat Pres

    Lid geworden:
    18 jun 2010
    Berichten:
    6.408
    Leuk Bevonden:
    5.603
    Geslacht:
    Man
    Beroep:
    Retired
    Locatie:
    Cheshire
    Can someone 'in the know' advise me how the new layout at Porthmadog will work in terms of operation. Currently WHR trains pass through the station and stop on the Cob. A diesel then attaches to the rear and pulls the stock into the station. The Garrett has uncoupled and goes off towards Boston Lodge presumably for water and coal. The Garret returns LE and the diesel propels the stock back onto the Cob [or does it run round and pull - I did not stay long enough to see this?] the Garret attaches and off we go. I am aware there will be an island platform and assume WHR trains will then be able to stop in the station without reversal but there is no mention of a runaround loop in the news reports on the official website.If there is not I assume a station pilot will still be required which seems a nuisance in terms of maintaining a driver/crew at the station unless the train loco crew do the shunting?
     
  4. dilbert2k

    dilbert2k New Member

    Lid geworden:
    18 mrt 2008
    Berichten:
    7
    Leuk Bevonden:
    0
    The new Port layout will allow WHR and FR trains to arrive and depart independently of each other. There will be a run round loop for the WHR without the need to stray onto FR metals.

    The GarrAtt from arriving trains normally stays coupled until the set has been drawn back into the platform by the diesel. The GarrAtt then uncouples and gets out of the way in the yard, or pops over to Boston Lodge for the purposes of a crew change. GarrAtts are not normally watered during a turnround at Port, and I am not aware of one ever being coaled at that point - no facilities.
     
  5. clam1952

    clam1952 New Member

    Lid geworden:
    3 apr 2012
    Berichten:
    145
    Leuk Bevonden:
    52
    Geslacht:
    Man
    Beroep:
    Retired
    Locatie:
    Crewe Cheshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
  6. Neil_Scott

    Neil_Scott Part of the furniture

    Lid geworden:
    25 apr 2008
    Berichten:
    3.155
    Leuk Bevonden:
    302
    Geslacht:
    Man
    Beroep:
    Railway servant
    Locatie:
    Worcester
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The WHR train comes in and the diesel couples on to the rear of the train and drags the whole train into the station. The Garratt only goes over to Pen Cob to change crews depending on the timetable, there are no coaling or (decent) watering facilities at Boston Lodge. The WHR will have their own run-round loop at the new layout.
     
  7. AndrewT

    AndrewT Member

    Lid geworden:
    16 okt 2007
    Berichten:
    735
    Leuk Bevonden:
    50
    Beroep:
    F&WHR Spin Doctor
    Locatie:
    Maentwrog
  8. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    Lid geworden:
    11 sep 2005
    Berichten:
    36.569
    Leuk Bevonden:
    9.984
    Geslacht:
    Man
    Beroep:
    Retired-ish, Part time rail tour steward.
    Locatie:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Andrew are there any up to date pictures of the progress of this work?
     
  9. AndrewT

    AndrewT Member

    Lid geworden:
    16 okt 2007
    Berichten:
    735
    Leuk Bevonden:
    50
    Beroep:
    F&WHR Spin Doctor
    Locatie:
    Maentwrog
  10. mickpop

    mickpop Resident of Nat Pres

    Lid geworden:
    18 jun 2010
    Berichten:
    6.408
    Leuk Bevonden:
    5.603
    Geslacht:
    Man
    Beroep:
    Retired
    Locatie:
    Cheshire
    Thanks for the information, in particular the track plan - all clear now.
     
  11. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    Lid geworden:
    11 sep 2005
    Berichten:
    36.569
    Leuk Bevonden:
    9.984
    Geslacht:
    Man
    Beroep:
    Retired-ish, Part time rail tour steward.
    Locatie:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks, and very impressive it looks, I assume the majority of the trackwork will take place in the off season.
     
  12. AndrewT

    AndrewT Member

    Lid geworden:
    16 okt 2007
    Berichten:
    735
    Leuk Bevonden:
    50
    Beroep:
    F&WHR Spin Doctor
    Locatie:
    Maentwrog
    The new king point has been lying in Minffordd Yard since the beginning of the year, but there isn't sufficient clearance to install it until the existing wave wall on the Cob is removed. This cannot happen until the new wave wall is constructed on the seaward side of the widened Cob, which has had to wait for the fill material to settle. A contract has now been awarded for this work to commence after the end of daily services this Autumn.
     
  13. AndrewT

    AndrewT Member

    Lid geworden:
    16 okt 2007
    Berichten:
    735
    Leuk Bevonden:
    50
    Beroep:
    F&WHR Spin Doctor
    Locatie:
    Maentwrog
  14. Sheff

    Sheff Resident of Nat Pres

    Lid geworden:
    21 apr 2006
    Berichten:
    8.084
    Leuk Bevonden:
    3.148
    Geslacht:
    Man
    Beroep:
    Retired Engineer & Heritage Volunteer
    Locatie:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Most informative, thanks Andrew. What's the timescale for Phases 3 & 4 please? Iain
     
  15. Steve B

    Steve B Well-Known Member

    Lid geworden:
    20 jun 2008
    Berichten:
    2.169
    Leuk Bevonden:
    1.579
    Locatie:
    Shropshire
    Thanks for that Andrew - very informative.

    Incidentally, I paid a visit a couple of days ago and had a couple of short journeys - Pont Croesor to Porthmadog, and Porthmadog to Minffordd and return. Very impressd with the slickness of the operations at Port, and much interested (and amused) in eavesdropping on the converstions of other passengers, who were very impressed with what they saw. The older ones particularly liked being able to open windows, and the younger ones were "amazed" at how long the trains were! That probably says all that needs to be said about the "DMU culture" of much of the big railway.

    Steve B
     
  16. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    Lid geworden:
    11 sep 2005
    Berichten:
    36.569
    Leuk Bevonden:
    9.984
    Geslacht:
    Man
    Beroep:
    Retired-ish, Part time rail tour steward.
    Locatie:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
  17. AndrewT

    AndrewT Member

    Lid geworden:
    16 okt 2007
    Berichten:
    735
    Leuk Bevonden:
    50
    Beroep:
    F&WHR Spin Doctor
    Locatie:
    Maentwrog
    Phase 3 Summer 2013 - we can start the tracklaying without disrupting services, Phase 4 starts after daily services end October 2013, whole thing finished for start of 2014 season (fingers crossed). Total cost £1.1 million.
     
  18. Orion

    Orion Well-Known Member

    Lid geworden:
    17 aug 2009
    Berichten:
    1.355
    Leuk Bevonden:
    5
    Beroep:
    Pensioner!
    Locatie:
    North-west London
    I expected an island platform, but I'm surprised about its location! I thought it would be closer to Harbour Station, passengers could get very wet!

    Regards
     
  19. AndrewT

    AndrewT Member

    Lid geworden:
    16 okt 2007
    Berichten:
    735
    Leuk Bevonden:
    50
    Beroep:
    F&WHR Spin Doctor
    Locatie:
    Maentwrog
    That's just the far end of the platform. We can't construct the bit at the station end before we lift all the existing track.
     
  20. GeoffH

    GeoffH New Member

    Lid geworden:
    20 apr 2008
    Berichten:
    44
    Leuk Bevonden:
    2
    The FR platform will eventually be 240m long IIRC. It will be the longest narrow guage platform in the world by quite a significant margin
     

Deel Deze Pagina