If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

CathEx to Holyhead - 20th April

Тема в разделе 'What's Going On', создана пользователем Big Al, 17 апр 2013.

  1. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    Дата регистрации:
    30 май 2009
    Сообщения:
    22.589
    Симпатии:
    22.715
    Адрес:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Yes, the smart move by the crew to stop in Rhyl station was sadly not smart enough. Only the up line is bi-directional - hence the stuck trains behind Tornado. The rescue diesel came up the (down) through road but had, I believe to be cleared for wrong line working to do so. This illustrates quite well the nonsense decision making of Network Rail to strip back the track work to all that is necessary for the current services. The moment something goes wrong with steam or anything else, they suddenly find that their solution was removed a while back. Beeching is alive and well in a different form and with an accountancy degree.
     
  2. brasso1

    brasso1 New Member

    Дата регистрации:
    31 май 2005
    Сообщения:
    191
    Симпатии:
    7
    To be fair that was BR.

    Network Rail will in due course be resignalling the North Wales Coast (control of which is set to go to CARDIFF!!! - Damn politics) and I suspect it will include some form of bi-directional signalling as it is seen as important for flexibility and resiliance. An example of this kind of design is the 'modular signalling' kit, already in place but not yet commisioned on the Shrewsbury Crewe line. It has been delayed due to a number of issues which need ironing out.

    I believe the plan is also to remove the down passenger loop at Abergele but replace the Up Through Line at Rhyl.
     
  3. 8A Rail

    8A Rail Member

    Дата регистрации:
    12 сен 2006
    Сообщения:
    277
    Симпатии:
    49
    Адрес:
    Merseyside
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A little late I suppose but only uploaded to my flickr site in the last couple of days. Taken at Mold Junction. Comments here or my flickr site welcome.

    [​IMG]
    60163 "Tornado" by 8A.Rail, on Flickr
     
  4. Live Steam

    Live Steam Well-Known Member

    Дата регистрации:
    31 май 2005
    Сообщения:
    1.173
    Симпатии:
    0
    Пол:
    Мужской
    Род занятий:
    Operations Manager
    Адрес:
    Anywhere and Everywhere.
    Not if they are maintained well. Lubrication is usually the issue. But I don't see that the compressors have been blamed officially?
     
  5. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    Дата регистрации:
    30 май 2009
    Сообщения:
    22.589
    Симпатии:
    22.715
    Адрес:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Well, it was the compressor as only one of the two on Tornado was operational on the day. But I agree that we shouldn't be 'blaming' a piece of equipment that is only as good as the maintenance regime it is subject to. Quite a surprise that the equipment had to be sent back to Germany for attention and it was that delay that effectively screwed up Tornado's availability on Steam Dream's flagship Explorer tour. So the ramifications of a single failure were actually quite far reaching.
     

Поделиться этой страницей