If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Industrial Loco Updates

Discuție în 'Steam Traction' creată de AlistairS, 17 Apr 2008.

  1. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    Înscris:
    15 Apr 2006
    Mesaje:
    16.551
    Aprecieri primite:
    7.897
    Locație:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    'Welsh Guardsman' WD71516 Has successfully steamed at Llangollen after overhaul. It will be heading back home to the Gwili Railway soon.

    Photo by George Jones:
    [​IMG]
    lr181113gj1 by martinperry77, on Flickr
     
    Respite și Matt78 apreciază asta.
  2. Avonside1563

    Avonside1563 Well-Known Member

    Înscris:
    13 Iul 2007
    Mesaje:
    1.141
    Aprecieri primite:
    244
    Sex:
    Masculin
    Locație:
    Bolton's Sidings, just behind the running shed!
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Bellerophon is back in one piece at the South Devon and undertaking test/running in prior to returning to Foxfield.
     
  3. Avonside1563

    Avonside1563 Well-Known Member

    Înscris:
    13 Iul 2007
    Mesaje:
    1.141
    Aprecieri primite:
    244
    Sex:
    Masculin
    Locație:
    Bolton's Sidings, just behind the running shed!
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Bellerophon now on her way back to Foxfield via the M5/M6 today
     
  4. sleepermonster

    sleepermonster Member

    Înscris:
    19 Iun 2007
    Mesaje:
    953
    Aprecieri primite:
    1.094
    Bagnall 2746 The Duke

    The springs have been sent away for overhaul. Four of the wheels have been cleaned down and primed. The 8F lads have succeeded in extracting the regulator valve, regulator rod and J-pipe. A full set of firebars have been ordered through Locomotive Management Services at Loughborough and the new set of oil pads has arrived from the NYMR.

    Tim
     
  5. sleepermonster

    sleepermonster Member

    Înscris:
    19 Iun 2007
    Mesaje:
    953
    Aprecieri primite:
    1.094
    Bagnall 2746 The Duke

    The weather has been a lot warmer and drier than we had expected; five wheels now in primer. Firebars due for delivery later this week.

    It is very good to hear that Bellerophon is back in action.

    Regards,

    Tim Oaks
     
  6. Avonside1563

    Avonside1563 Well-Known Member

    Înscris:
    13 Iul 2007
    Mesaje:
    1.141
    Aprecieri primite:
    244
    Sex:
    Masculin
    Locație:
    Bolton's Sidings, just behind the running shed!
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Bellerophon has now had a full load test and proving line run at Foxfield with no problems apparent so will be accepted back into traffic and rostered in due course.
     
  7. Respite

    Respite Member

    Înscris:
    6 Noi 2009
    Mesaje:
    447
    Aprecieri primite:
    143
    Sex:
    Masculin
    Ocupație:
    Retired
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I'm advised that Jennifer is unlikely to work again at Embsay for the foreseeable future, as its got serious firebox problems. Such a shame as I had heard good reports about it. It had arrived at the railway with axlebox box problems but Llangollen who manage the engine had repaired the damage very quickly.
     
  8. MatthewCarty

    MatthewCarty Guest

    Does anyone know how Desmond I getting on at Llangollen?
     
  9. sleepermonster

    sleepermonster Member

    Înscris:
    19 Iun 2007
    Mesaje:
    953
    Aprecieri primite:
    1.094
    Vulcan Progress
    A new dome cover has arrived and was due to be fitted last weekend. The loco is likely to be at Beamish next spring. Latest reserch indicates it ought to be green.

    Bagnall 2746 The Duke
    All wheels now cleaned down and primed. A serious start has been made on cleaning the gunge off the frames.

    Tim
     
  10. sleepermonster

    sleepermonster Member

    Înscris:
    19 Iun 2007
    Mesaje:
    953
    Aprecieri primite:
    1.094
    Vulcan Steaming dates: Vulcan will be in steam at Barrow Hill 0n 8th/9th February, with various LNER pacifics as supporting attractions. After that it is due to go to Beamish for Easter.

    Bagnall 2746 progress: springs are currently with Jones Bros of Darlaston for overhaul; due back in February. Five wheels now in undercoat.

    Tim
     
  11. jonh

    jonh New Member

    Înscris:
    21 Mai 2011
    Mesaje:
    57
    Aprecieri primite:
    14
    Locație:
    Nr Leicester
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I saw Austerity No 22 at the GCR yesterday. Does anyone know why it is there? Thank you.
     
  12. 32110

    32110 Member

    Înscris:
    20 Mai 2006
    Mesaje:
    649
    Aprecieri primite:
    794
    Sex:
    Masculin
    Ocupație:
    Retired from full time paid work
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The boiler inspector recently examined AB 1719, 'Lady Nan', with all tubes out and passed the boiler fit for a re-tube. We hope this will begin early in the new year.
     
  13. YEC Matt

    YEC Matt New Member

    Înscris:
    7 Mai 2013
    Mesaje:
    5
    Aprecieri primite:
    0
    Sex:
    Masculin
    Jennifer/Sam Fox Number 20 Will be operating trains at Embsay On the last Two Sundays In January as my provisional roster stands atm.
     
  14. oldmrheath

    oldmrheath Well-Known Member

    Înscris:
    18 Iun 2006
    Mesaje:
    2.334
    Aprecieri primite:
    2.563
    Boiler drawings for Robert Heath No.6 have been obtained from the Bagnall records by Dave Donkin . These will be used for patterns for the new crown girders.
     
    Robert Heath No.6 apreciază asta.
  15. Steve

    Steve Resident of Nat Pres Friend

    Înscris:
    7 Oct 2006
    Mesaje:
    12.729
    Aprecieri primite:
    11.847
    Ocupație:
    Gentleman of leisure, nowadays
    Locație:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The firebox problems couldn't have been that serious, then?
     
  16. THE MELTER

    THE MELTER Member

    Înscris:
    31 Oct 2006
    Mesaje:
    422
    Aprecieri primite:
    63
    Ocupație:
    ENGINEER
    Locație:
    BLACK COUNTRY
    Colin McAndrew is scheduled for a run out on Jan 1st too,

    The melter
     
  17. dman-lewis

    dman-lewis Member

    Înscris:
    2 Sep 2008
    Mesaje:
    399
    Aprecieri primite:
    16
    Sex:
    Masculin
    Ocupație:
    Trainee CAD Draftsman
    Locație:
    Norwich
    Hello, Whitwell and Reepham took delivery of the loco this year.
     
  18. sleepermonster

    sleepermonster Member

    Înscris:
    19 Iun 2007
    Mesaje:
    953
    Aprecieri primite:
    1.094
    2746 The Duke
    Santa has left us a full set of firebars which are now safely tucked away. The short term target is to be ready for re-wheeling the frames as soon as possible; does anyone know the correct grade of steel for use in spring and brake hanger pins and their associated bushes?

    Happy New Year.

    Tim
     
  19. Cavickboy2

    Cavickboy2 New Member

    Înscris:
    18 Oct 2013
    Mesaje:
    13
    Aprecieri primite:
    22
    Sex:
    Masculin
    Hunslet 3193

    Its the loco's 70th birthday this November and we are becoming increasingly confident that 3193 will be back on the rails with steam issuing forth if not in November 2014 then pretty soon after. Our boilermaker has had the go ahead from the boiler inspector to re-attach the firebox and begin putting the tubes back in. Having dismantled the motion and other bottom end components they are being re-fitted having been appropriately re-furbished.

    More to follow as progress continues

    Andrew M

    http://www.norfolksteamloco.co.uk
     
  20. sleepermonster

    sleepermonster Member

    Înscris:
    19 Iun 2007
    Mesaje:
    953
    Aprecieri primite:
    1.094
    Bagnall 2746 The Duke.
    First working party of 2014 last saturday. 6 wheels in undercoat, two rear sandboxes removed and one cleaned and primed. Appropriate grade of steel identified as EN8, 6 metres of 50mm bar ordered for machining into imperial pins.

    Tim
     

Distribuie pagina asta