If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

LE Movements, ECS and Test Runs 2014.

Тема в разделе 'What's Going On', создана пользователем osprey, 2 янв 2014.

  1. Dan Hamblin

    Dan Hamblin Part of the furniture

    Дата регистрации:
    27 мар 2006
    Сообщения:
    2.554
    Симпатии:
    194
    Род занятий:
    Rolling Stock Engineer
    Адрес:
    Kent
    Chesham set is moving to Ruislip on Wednesday night this week.

    Regards,

    Dan
     
  2. 5944

    5944 Resident of Nat Pres

    Дата регистрации:
    14 янв 2006
    Сообщения:
    8.981
    Симпатии:
    9.508
    Пол:
    Мужской
    Род занятий:
    Train Maintainer for GTR at Hornsey
    Адрес:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
  3. Dan Hamblin

    Dan Hamblin Part of the furniture

    Дата регистрации:
    27 мар 2006
    Сообщения:
    2.554
    Симпатии:
    194
    Род занятий:
    Rolling Stock Engineer
    Адрес:
    Kent
    Both the Tornado and Chesham set moves are being done by DCR, I understand the latter involves borrowing one or more EDs. Logistically it makes sense to tie the two moves together so you only end up with one train onto Bluebell infrastructure and one train out, but if the Tornado move is delayed for whatever reason this plan would change (either separate trains on different days or the whole plan gets put back by x days).

    Best to keep an eye on RTT and see if any paths get activated. Must be very frustrating trying to move vehicles across the network with all the variables to consider!

    Regards,

    Dan
     
  4. mrKnowwun

    mrKnowwun Part of the furniture

    Дата регистрации:
    22 окт 2011
    Сообщения:
    4.366
    Симпатии:
    2.823
    Род занятий:
    Retired
    Адрес:
    West Byfleet
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Nothing activated through Motala GF yet.
     
  5. threelinkdave

    threelinkdave Well-Known Member

    Дата регистрации:
    1 авг 2013
    Сообщения:
    2.065
    Симпатии:
    1.240
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Stratford-upon-Avon or in a brake KD to BH
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    005T was activated at 12.23 but no movement so far
     
  6. mrKnowwun

    mrKnowwun Part of the furniture

    Дата регистрации:
    22 окт 2011
    Сообщения:
    4.366
    Симпатии:
    2.823
    Род занятий:
    Retired
    Адрес:
    West Byfleet
    Heritage Railway Volunteer:
    No I do not currently volunteer
    But nothing from Swanage.
     
  7. DH34105

    DH34105 Member

    Дата регистрации:
    5 апр 2009
    Сообщения:
    454
    Симпатии:
    12
    If I am reading that right 005T refers to the run from Tonbridge West Yard to East Grinstead - not Swanage Railway related
    Dick
     
  8. John Petley

    John Petley Part of the furniture

    Дата регистрации:
    8 окт 2007
    Сообщения:
    2.957
    Симпатии:
    2.542
    Пол:
    Мужской
    Род занятий:
    Researcher/writer and composer of classical music
    Адрес:
    Between LBSCR 221 and LBSCR 227
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Pity about (a) fire risk and (b) 60163 not slgned up with WCRC otherwise it could have worked at least part of its passage from Swanage to Sheffield Park by sharing the honours with 44932 on today's DCE
     
  9. Dan Hamblin

    Dan Hamblin Part of the furniture

    Дата регистрации:
    27 мар 2006
    Сообщения:
    2.554
    Симпатии:
    194
    Род занятий:
    Rolling Stock Engineer
    Адрес:
    Kent
    It looks like the two moves are going to stay separate then. Chesham set at East Grinstead sidings 20:18, Ruislip Depot 00.05.

    Regards,

    Dan
     
  10. mrKnowwun

    mrKnowwun Part of the furniture

    Дата регистрации:
    22 окт 2011
    Сообщения:
    4.366
    Симпатии:
    2.823
    Род занятий:
    Retired
    Адрес:
    West Byfleet
    Heritage Railway Volunteer:
    No I do not currently volunteer
    suspect its been cancelled.
     
  11. threelinkdave

    threelinkdave Well-Known Member

    Дата регистрации:
    1 авг 2013
    Сообщения:
    2.065
    Симпатии:
    1.240
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Stratford-upon-Avon or in a brake KD to BH
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    005t cancelled. Whilst it was Tonbridge - E Grinstead it was running via Willesden, where it had a one hour stop, so looked like it was picking op something before going on to EG. Imaterial now.
     
  12. Dan Hamblin

    Dan Hamblin Part of the furniture

    Дата регистрации:
    27 мар 2006
    Сообщения:
    2.554
    Симпатии:
    194
    Род занятий:
    Rolling Stock Engineer
    Адрес:
    Kent
  13. mrKnowwun

    mrKnowwun Part of the furniture

    Дата регистрации:
    22 окт 2011
    Сообщения:
    4.366
    Симпатии:
    2.823
    Род занятий:
    Retired
    Адрес:
    West Byfleet
    Heritage Railway Volunteer:
    No I do not currently volunteer
  14. Jamessquared

    Jamessquared Nat Pres stalwart

    Дата регистрации:
    8 мар 2008
    Сообщения:
    28.020
    Симпатии:
    65.585
    Адрес:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Last Bluebell down service from EG today is dep 16:30, arrive 16:40 at Kingscote. That probably means the two diesels won't be free to progress onto Bluebell metals (allowing time for the token to be taken by road from Kingscote back to East Grinstead in order to release the ground frame) before about 17.10ish. I assume in the meantime, the two 73s can sit in the interconnecting track for about an hour without blocking access to the mainline station for the regular passnger trains.

    Tom
     
  15. threelinkdave

    threelinkdave Well-Known Member

    Дата регистрации:
    1 авг 2013
    Сообщения:
    2.065
    Симпатии:
    1.240
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Stratford-upon-Avon or in a brake KD to BH
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  16. 5944

    5944 Resident of Nat Pres

    Дата регистрации:
    14 янв 2006
    Сообщения:
    8.981
    Симпатии:
    9.508
    Пол:
    Мужской
    Род занятий:
    Train Maintainer for GTR at Hornsey
    Адрес:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    73136 and 73119 reported on one of the gen groups as being the locos that ran to East Grinstead earlier.
     
  17. 26D_M

    26D_M Part of the furniture

    Дата регистрации:
    22 окт 2009
    Сообщения:
    4.416
    Симпатии:
    1.681
  18. Jamessquared

    Jamessquared Nat Pres stalwart

    Дата регистрации:
    8 мар 2008
    Сообщения:
    28.020
    Симпатии:
    65.585
    Адрес:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    WishIHadAName нравится это.
  19. threelinkdave

    threelinkdave Well-Known Member

    Дата регистрации:
    1 авг 2013
    Сообщения:
    2.065
    Симпатии:
    1.240
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Stratford-upon-Avon or in a brake KD to BH
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Tom,
    I have never thought of the Chesham set as a Diesel Multiple Unit but thats the description in RTT

    Dave

    p.s. What about a station masters token instrument at EG. The SVR has one at Arley for P Way to start trains (trolies) when long section Bewdley Highley in use
     
  20. Jamessquared

    Jamessquared Nat Pres stalwart

    Дата регистрации:
    8 мар 2008
    Сообщения:
    28.020
    Симпатии:
    65.585
    Адрес:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Well, "pathed" as a DMU, but running as "empty coaching stock", and hauled by a freight company!

    Re signalling at East Grinstead: I'm sure all sorts of things are possible in the future, but whether they would be cost effective for fairly occasional traffic to / from the mainline is another question! The L frame installation at Kingscote has reserved 20 levers for possible future signalling at East Grinstead, but without a detailed design having been worked out, let alone planned. In the meantime, it is one engine in steam (or fumes) and the token has to be taken from Kingscote to East Grinstead by road, hence the relatively protracted times to get a service onto or off the railway.

    Tom
     

Поделиться этой страницей