According to shed staff, BvR2 sadly failed on it test runs and had to be rescued by Bvr3, whilst the traction motors were being mapped there was...
44767 once complete again afaik will return to the NNR for a minimum of 3 years, Ian Storeys words too.
What is the speed limit on the corwen section in push mode ? I assume as a 4 coach take it to be 10mph ?
Now it's hit our local press just thought I would spread the good news,NNR has bought Chatham steam out , all boiler works, equipment and order...
Whats happening with the main website ??? it use to be up to date, and worth a regular check, well now its so out of date , and doesnt ever seem...
Was it a runaway ??
2yr visit im told
Frames are undergoing works at Ian Rileys, boiler is there on site also along with overhauled tender, i believe its now in reassembly stages then...
I believe the two for sale are the 2 which are stored, not the runner, although im not sure if they are being sold now or not,i heard something...
The NNRs railbuses are aluminium sided, with steel ends, these were etched properly by our C&W dept when the last one was overhauled, any paint...
The M&GN Societys suburbans are already tucked away in their carriage shed at Bridge road thankfully, except the one in regular use ! We are lucky...
Well being a long time NNR volunteer, this does seem stupid, the more advertising the more visitors will come to see it, of course the Y7 if...
How about..... WD or 92 Squadron, or if you wanna cause a stir .....J21
Separate names with a comma.