    Work completed over 20th and 21st February


    Since the last working weekend, the boiler inspector has been to see Locos 4 and 6 in a stripped down condition, which meant this weekend our main job was to put them both back together so the inspector can see them both in steam.

    No 4 Edward Thomas
    Refitted boiler plugs and mudholes
    Carried out a hydraulic pressure test of the boiler using water
    Fitted ashpan, then brake cross-shaft and pony truck wishbone
    Refitted steam pressure gauge
    Fitted firebars
    Lit a 'warming fire' on Sunday afternoon using wood.

    No 6 Douglas
    Fitted boiler plugs
    Fitted ashpan and firebars
    Re-assembled safety valves
    Fitted pressure gauge
    Painted inside the coal bunker in gloss black

    No 7 Tom Rolt
    Degreased the frames on both sides, access was improved as the motion has been partially stripped down
    Cleaned up the removed motion using degreaser and a scouring pad
    Lit up the engine on both days, to test the new safety valves

    Thanks as always to the gang for all their hard work.