If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

47357 Jinty overhaul Progress

本贴由 Marcello Jinty Gabrielli2012-04-29 发布. 版块名称: Loco information

  1. Marcello Jinty Gabrielli

    Marcello Jinty Gabrielli New Member Loco Owner

    注册日期:
    2012-01-20
    帖子:
    7
    支持:
    1
    职业:
    " 47357 Jinty Appeal "
    所在地:
    Ripley
    [h=5]After tyre reprofiling at the Tyseley locomotive works, the wheelsets for this locomotive arrived back at the MR-B during September. With the tyre profiles now in good order, work can start on the axleboxes to enable the chassis to be re wheeled. Most parts for this locomotive have been cleaned ready for inspection to determine the level of repair that is required.
    [​IMG]
    The boiler for this loco has also had attention to get it ready for an inspection to gather a full scope for repair. All of the boiler tubes have been removed with the regulator J pipe next in line to be removed, giving full access to the inside of the boiler barrel for de-scaling. It is hoped that work on this loco will start soon.


    Taken from the Wyvern Midland Railway Trust official magazine.[/h]
     
    已获得tilling的支持.

分享此页面