If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

ADIF awards Antequera-Granada HSL contracts

Discussion in 'On Track.' started by News, Jun 2, 2014.

Thread Status:
Not open for further replies.
  1. News

    News Guest

    Spain’s transport ministry and the country’s infrastructure manager, ADIF, have awarded several contracts worth almost €240 million to accelerate work on a new high-speed railway between Antequera and Granada.

    Siemens Rail Automation and Thales have won the largest of the three contracts – a €208.7 million order for the installation and maintenance of traffic management and S&T (signalling and telecommunications) systems.

    An Emte, Vimac and Neopol Sociedade Studies and Construçoes joint venture has been awarded a €19.4 million contract for catenary equipment along the 114.5-kilometre route. Finally, ADIF announced the launch of two ballast contracts worth a combined €10.7 million.

    The new high-speed link will connect Granada to the Madrid-Sevilla line and develop new high-speed connections to Sevilla and Córdoba.

    In a separate announcement, ADIF issued a €204 million competition to maintain overhead lines, electrical substations and associated electrification systems for more than 2,300 kilometres of the Spanish rail network.

    The 10-year contract includes the high-speed Madrid-Seville, Córdoba-Málaga and La Sagra-Toledo routes and the Madrid-Zaragoza-Barcelona-French border line.

    [​IMG]
    [​IMG] [​IMG] [​IMG] [​IMG] [​IMG]

    Continue reading...
     
Thread Status:
Not open for further replies.

Share This Page