Epping Ongar Railway Progress August 09. E.O.Railway

本贴由 admin2009-08-25 发布. 版块名称: On Track.

  1. admin

    admin Founder Administrator

    注册日期:
    2005-03-16
    帖子:
    13,028
    支持:
    266
    性别:
    职业:
    Founder National Preservation
    所在地:
    dover
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Work continues apace at North Weald. The track has been lifted from Kiln Road Bridge, through North Weald station to a point east of the public footpath. The exposed track bed has been lowered to its original height between both points. Ballast salvaged form Custom House is being mechanically cleaned on site prior to being re-laid on the re-graded formation.

    Refurbishment of the signalling line-side cabinets continues and the installation of electrical equipment has commenced prior too location upon the reinstatement of the permanent way.

    Refurbishment of North Weald station is making excellent progress. The side addition constructed during the 1950’s has been demolished and the resultant exposed brickwork repaired and re-pointed to a high standard. The 1950’s prefabricated westbound platform is undergoing repair and extension. Original pre-cast components have been used for patterns to ensure that the platform extension remains uniform too the original. The exterior and interior of North Weald station have undergone thorough refurbishment including replacement of missing and damaged joinery, re-plumbing, re-wiring, plastering and painting. All work undertaken has been completed to an exacting standard.



    [​IMG]Image of North Weald station. The formation has been lowered to the original depth and work has commenced on the repair and extension of the up platform.



    [​IMG] Stock-piled track at North Weald. Reinstatement will incorporate the reinstatement of the passing loop, goods yard sidings and associated signalling.



    [​IMG]The refurbishment of North Weald station's interior in being undertaken to a very high standard. Work undertaken includes replacement of damaged and missing joinery, re-wiring, plumbing, plastering and painting.



    [​IMG]The ballast salvaged from Custom House is being mechanically cleaned and graded prior to laying on the formation.




    [​IMG]Example of the intricate work undertaken to the facade of north Weald station. Bricks have been authentically repaired and re-pointed, joinery repaired and repainted to British Railway's cream and green. Replacement guttering replicates the cast-iron original.



    [​IMG]


    More...
     