Main Line B12?

本贴由 green five2010-06-03 发布. 版块名称: What's Going On

  1. green five

    green five Resident of Nat Pres

    注册日期:
    2006-04-30
    帖子:
    6,781
    支持:
    2,614
    性别:
    职业:
    Design Draughtsman
    所在地:
    Hampshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The latest issue of the Railway Magazine has a story in it saying that the B12 61572 may be outshopped to ML condition so that she can work from the NNR up to Cromer. It would be great to see this wonderful loco out on the national network again and there would definitely be plenty of work for her to venture a bit further. She was certainly very popular on Steam on the Met in 2000.
     
  2. david1984

    david1984 Resident of Nat Pres

    注册日期:
    2005-09-13
    帖子:
    12,910
    支持:
    1,387
    性别:
    所在地:
    Birmingham
    I suppose regular useage would justify the expense and all the associated Main Line gubbins as opposed to the occasional outing but i can see two sticking points to which the answer is easier said than done:

    1) Isn't the crossing at Sheringham on the priviso of a limited number of crossing per year ?, certainly less than the number needed to break even i'd have thought

    2) Cromer platform being so short meaning short formations would make it hard to get enough Passengers on board to not run at a loss without having ticket prices so high as to put people off.

    Good luck to them if they think they can pull it off, but looks tricky on the face of it.
     
  3. thegrimeater

    thegrimeater Member

    注册日期:
    2008-09-12
    帖子:
    525
    支持:
    116
    性别:
    职业:
    Admin
    所在地:
    Huntingdon/Sheringham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    ARAIK, It is just having a really good overhaul bringing all components to main line standard. I don't think it means all the OTMR gubbins and what have you that is needed for mainline running.
     
  4. dman-lewis

    dman-lewis Member

    注册日期:
    2008-09-02
    帖子:
    399
    支持:
    16
    性别:
    职业:
    Trainee CAD Draftsman
    所在地:
    Norwich
    Haven't heard this, all I know is that it has been delayed and will be november time when it is finished.
     
  5. Super G

    Super G New Member

    注册日期:
    2009-09-16
    帖子:
    33
    支持:
    0
    Lol, where do people get these ideas from?
     
  6. Christopher125

    Christopher125 Part of the furniture

    注册日期:
    2005-11-30
    帖子:
    2,846
    支持:
    581
    所在地:
    Isle of Wight
    I suspect this is just another case of people hearing that a loco is being overhauled to mainline standards and thinking that means going mainline. Its a lovely idea, but i'd be surprised if it happened anytime soon.

    Chris
     
  7. SteveA

    SteveA Member

    注册日期:
    2006-06-19
    帖子:
    274
    支持:
    298
    性别:
    职业:
    Retired
    所在地:
    Sunny Norfolk
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    SuperG speak to Alex G he can bring you up to speed. I think you'll find that the M&GN Society are having all of the work done to mainline standards with a view to the NNR running to Cromer when the time is right. TPWS would be required to run to Cromer, but OTMR exemption as per NYMR to Whitby would be sought.

    Steve A
     
  8. green five

    green five Resident of Nat Pres

    注册日期:
    2006-04-30
    帖子:
    6,781
    支持:
    2,614
    性别:
    职业:
    Design Draughtsman
    所在地:
    Hampshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks for this info.
     
  9. Super G

    Super G New Member

    注册日期:
    2009-09-16
    帖子:
    33
    支持:
    0
    So the work is being done to mainline standards, but TPWS will be required in addition, or is TPWS included in the current work?

    Either way, I doubt running to Cromer will happen any time soon.
     
  10. agalpin

    agalpin Member

    注册日期:
    2006-04-22
    帖子:
    305
    支持:
    20
    所在地:
    Bleeding 'ell Essex
    At this time the B12 is not having TPWS or anything else fitted to it to make it main line available.

    However, The M&GN Society, yes they own the engine not the NNR as the railway press make out, are doing everything they can to keep all options open.

    AS for any additional work rumoured as being done, none is associated with mainline running.

    As for when it will be ready, the M&GN Society have never committed to dates as it would be foolish with this type of overhaul, so can we please leave that particular speculation alone. She will be in service when she is ready.

    Alex Galpin
    M&GN Society Secretary
     
  11. green five

    green five Resident of Nat Pres

    注册日期:
    2006-04-30
    帖子:
    6,781
    支持:
    2,614
    性别:
    职业:
    Design Draughtsman
    所在地:
    Hampshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks Alex. Sorry if I started some speculation off by putting the story on here. The RM are usually pretty reliable.
     
  12. odc

    odc Member

    注册日期:
    2006-04-11
    帖子:
    765
    支持:
    35
    职业:
    Network Technician at St Albans School
    所在地:
    Hemel Hempstead
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    At least she already has air breaks.....though single pipe :)
     