If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Rebuilding a bridge across the Thames

الموضوع في 'Everything Else Heritage' بواسطة Ploughman, بتاريخ ‏27 ماي 2017.

  1. Ploughman

    Ploughman Part of the furniture

    إنضم إلينا في:
    ‏1 إبريل 2008
    المشاركات:
    5,969
    عدد المعجبين:
    2,761
    الوظيفة:
    Ex a lot of things.
    مكان الإقامة:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Found this today. Not sure if in the right section.

    How do you replace a bridge outside Victoria Station with no affect on existing rail services?


    Could this be done today?
     
  2. Spamcan81

    Spamcan81 Nat Pres stalwart

    إنضم إلينا في:
    ‏25 أوت 2007
    المشاركات:
    35,842
    عدد المعجبين:
    22,293
    الوظيفة:
    Training moles
    مكان الإقامة:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Fascinating.
    Anyone spot that Marples Ridgway were the contractors. I wonder how they got the job. :rolleyes:
     
  3. baldbof

    baldbof Well-Known Member Friend

    إنضم إلينا في:
    ‏13 جوان 2015
    المشاركات:
    1,832
    عدد المعجبين:
    2,993
    الجنس:
    ذكر
    الوظيفة:
    Retired, ex-RAF
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Ah, the days before elf n' safetea became an obsession!
     
  4. richards

    richards Part of the furniture

    إنضم إلينا في:
    ‏1 اكتوبر 2008
    المشاركات:
    4,708
    عدد المعجبين:
    2,083
    الجنس:
    ذكر
    مكان الإقامة:
    London
    Heritage Railway Volunteer:
    No I do not currently volunteer
    ... or peoples' live were saved or injuries avoided by dangerous practices - whichever is your viewpoint.
     
    Martin Perry و goldfish معجبون بهذا.
  5. John Webb

    John Webb Member

    إنضم إلينا في:
    ‏2 مارس 2010
    المشاركات:
    501
    عدد المعجبين:
    86
    الوظيفة:
    Retired
    مكان الإقامة:
    St Albans, Herts
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It would be tackled a little differently today, I think. I suspect that arches would be lifted into place as a single unit by a very large crane, and very unlikely to have been delivered to the preparation site by rail! I also wonder if there are sufficient watermen left to assist in carrying out such work?

    Nearest in modern works would be the recent rebuilding of Blackfriars railway bridge and station, perhaps?

    John
     

مشاركة هذه الصفحة