    We have been doing more small jobs on B555696 as it has not yet been moved. One job was to straighten the top corner .
    DSC01631.JPG
     
  2. Flying Phil

    Flying Phil Well-Known Member

    Joined:
    Dec 10, 2018
    Messages:
    1,950
    Likes Received:
    3,667
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    We now have three more 16T Mineral wagons at Rothley - Thanks to our hardworking Ops Team!
    DSC01649.JPG

    Although they look to be in reasonable condition, once we opened them up and cleaned out 20 years of debris more horrors were revealed.
    B 565224 (Note it had been painted with the slightly wrong number) will need headstock repairs and so a buffer has been removed. It was a tough job!
    DSC01655.JPG

    Unfortunately the next wagon, B 570618, has "thin flanges" but is a standard axle so we may do a temporary wheel swap whilst we look at re profiling or obtaining another wheelset ( if anybody can help?).
    The third wagon, B279716 (To be correctly numbered B589054) will need a new floor and headstock repairs.
     
  3. Flying Phil

    Flying Phil Well-Known Member

    Joined:
    Dec 10, 2018
    Messages:
    1,950
    Likes Received:
    3,667
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Here is the numbered B555696 out in the sunshine.
    DSC01673.JPG
     
    ghost and Johnme101 like this.
  4. Flying Phil

    Flying Phil Well-Known Member

    Joined:
    Dec 10, 2018
    Messages:
    1,950
    Likes Received:
    3,667
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Into the shed has gone B565224 and we have started the bodywork repairs.
    DSC01676.JPG DSC01677.JPG
     
    smasher, ghost, big.stu and 2 others like this.
  5. Flying Phil

    Flying Phil Well-Known Member

    Joined:
    Dec 10, 2018
    Messages:
    1,950
    Likes Received:
    3,667
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Whilst the cutting and welding is progressing, areas away from that are being prepped and painted.
    DSC01686.JPG

    The team is working hard for our feature event 30@30 in November.....
     
    Last edited: May 18, 2022
  6. Flying Phil

    Flying Phil Well-Known Member

    Joined:
    Dec 10, 2018
    Messages:
    1,950
    Likes Received:
    3,667
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    We have had purchased some steel sheet bent to suit the curved lower part of the rebodied wagons. Here is the first repaired section inside and out.
    DSC01727.JPG DSC01728.JPG
     
  7. Flying Phil

    Flying Phil Well-Known Member

    Joined:
    Dec 10, 2018
    Messages:
    1,950
    Likes Received:
    3,667
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Here is the East side of B565224 with two repair patches completed. There have been a further 5 repairs welded in elsewhere - so far!
    DSC01741.JPG
     
  8. Flying Phil

    Flying Phil Well-Known Member

    Joined:
    Dec 10, 2018
    Messages:
    1,950
    Likes Received:
    3,667
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Our team has recently been strengthened by two new volunteers, both experienced engineers who want to help us achieve our 30@30 target. After induction sessions they have got stuck in and already have been cutting and welding! So the current situation is that only one side (West) needs the two bottom sections fitting and welding.
    20220528_170227 Gary P.jpg DSC01746.JPG
     
  9. Flying Phil

    Flying Phil Well-Known Member

    Joined:
    Dec 10, 2018
    Messages:
    1,950
    Likes Received:
    3,667
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A good workday yesterday saw 4 of us in action. The vac cylinder was removed, dismantled and new seals put in place. It has been re-assembled, cleaned and primered. The final repair section was fitted into place on the SW lower side and it has been tack welded. The NW section has been fully welded on the inside but the outer top edge needs welding.
    There is still a lower edge repair section to fit and weld on the North end.
     
    big.stu likes this.
  10. Flying Phil

    Flying Phil Well-Known Member

    Joined:
    Dec 10, 2018
    Messages:
    1,950
    Likes Received:
    3,667
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Another good workday yesterday and we just have the lower part of the fixed end to get plates fitted and welded. The Vac cylinder is now tested, painted and ready to fit along with the final areas to be painted.
    DSC01844.JPG
     
    Johnme101, big.stu and Dave Williams like this.
  11. Flying Phil

    Flying Phil Well-Known Member

    Joined:
    Dec 10, 2018
    Messages:
    1,950
    Likes Received:
    3,667
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The renovated vacuum cylinder was put back in place under the wagon on Wednesday, together with the rest of the brake rigging. The North West buffer was re-installed following the repair to the headstock and the three link coupling has been put in position on the south end hook. A start has been made on the final welding jobs at the bottom edge of the fixed (North) end. The West side has been prepped and grey top coated. There is still the vacuum hoses to fit, black boxes and numbers to paint, white stripes and the fixed end paint to finish. This might be finished by the end of this month......30@30 is still the aim!
    DSC01852.JPG
     