    Would be good to start a thread about this

    Attached link may be of interest

    https://www.dorsetforyou.com/media/183848/Business-Plan/pdf/PCRPBusinessPlan2013_v1_April_.pdf

    Any news from anyone else?

    David R
     
  2. David R

    David R Well-Known Member

    Дата регистрации:
    30 июл 2013
    Сообщения:
    1.019
    Симпатии:
    1.390
    Пол:
    Мужской
    Адрес:
    Surrey
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    athelney нравится это.
  3. David R

    David R Well-Known Member

    Дата регистрации:
    30 июл 2013
    Сообщения:
    1.019
    Симпатии:
    1.390
    Пол:
    Мужской
    Адрес:
    Surrey
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  4. David R

    David R Well-Known Member

    Дата регистрации:
    30 июл 2013
    Сообщения:
    1.019
    Симпатии:
    1.390
    Пол:
    Мужской
    Адрес:
    Surrey
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  5. huochemi

    huochemi Part of the furniture

    Дата регистрации:
    6 май 2008
    Сообщения:
    2.995
    Симпатии:
    1.515
    Пол:
    Мужской
    Адрес:
    UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks. What is a "road rail interchange"? A park and ride?
     
  6. H F Stephens

    H F Stephens New Member

    Дата регистрации:
    3 май 2008
    Сообщения:
    8
    Симпатии:
    2
    No, it's a level crossing!
     
  7. howard

    howard Member

    Дата регистрации:
    28 июл 2006
    Сообщения:
    306
    Симпатии:
    270
    Пол:
    Мужской
    Род занятий:
    Retired Ship's Engineer
    Адрес:
    Sandwich Kent
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Isn't it where P/Way put their road/rail equipment on and off the line?
     
  8. HerstonHalt

    HerstonHalt Member

    Дата регистрации:
    27 апр 2009
    Сообщения:
    255
    Симпатии:
    169
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Its the area where guest locos arriving by road vehicles are unloaded onto SR metals. It was on the right as you approached Norden Gates crossing, before you crossed the line (ie on the Swanage side of the approach road).. The new one will be diagonally opposite, on the left hand (Wareham) side just after the crossing.
     
  9. twr12

    twr12 Well-Known Member

    Дата регистрации:
    2 сен 2007
    Сообщения:
    1.658
    Симпатии:
    820
    Colloquially known as a Pad!
     
  10. Greenway

    Greenway Part of the furniture

    Дата регистрации:
    16 мар 2008
    Сообщения:
    4.019
    Симпатии:
    3.804
    Пол:
    Мужской
    Адрес:
    South Hams
    Heritage Railway Volunteer:
    No I do not currently volunteer
    My view is that the description park and ride is far more apposite than 'level crossing'.
     
  11. Rumpole

    Rumpole Part of the furniture

    Дата регистрации:
    17 дек 2005
    Сообщения:
    2.604
    Симпатии:
    889
    Род занятий:
    Tea-Maker
    Адрес:
    34105
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As Herston Halt says, what will be referred to as the Road Rail Interchange is where rail vehicles are loaded and unloaded from road vehicles. The dig for the new RRI is now in full swing, with 10 trainloads of spoil taken up to Embankment 4 (each trainload comprising 3 Sea Urchins) today, following yesterday's 8 trainloads; estimated timescale for the digging works is 2 weeks.
     
    jnc и David R нравится это.
  12. huochemi

    huochemi Part of the furniture

    Дата регистрации:
    6 май 2008
    Сообщения:
    2.995
    Симпатии:
    1.515
    Пол:
    Мужской
    Адрес:
    UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thank you. So is the RRI part of the Wareham Project (and if so, why?) or is it coincidental?
     
  13. David R

    David R Well-Known Member

    Дата регистрации:
    30 июл 2013
    Сообщения:
    1.019
    Симпатии:
    1.390
    Пол:
    Мужской
    Адрес:
    Surrey
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Because the existing RRI at Norden will be blocked by the new barriers for the new Level Crossing at Norden.

    The Level Crossing is required for Wareham trains to proceed north of Norden - a present, trains are flagged by hand accross the road

    David R
     
    Last edited: 16 сен 2015
  14. David R

    David R Well-Known Member

    Дата регистрации:
    30 июл 2013
    Сообщения:
    1.019
    Симпатии:
    1.390
    Пол:
    Мужской
    Адрес:
    Surrey
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  15. steve45110

    steve45110 Member

    Дата регистрации:
    10 сен 2005
    Сообщения:
    309
    Симпатии:
    45
    Пол:
    Мужской
    Are there any plans for Wareham yet?
    1 Will the up bay be re-opened? A junction box has recently been helpfully plonked on the trackbed, complete with new steps down to it.
    2 Will the signalbox be taken over by SR or, demolished, as Wool has been?
    3 Will their be a buffet at Wareham? If there is no space in the buildings, a coach could be placed in the bay.
    4 Will the water tank at the west end of the down platform be rebuilt, as a water supply for a reinstated column for locos?
    5 Will the sidings in the old goods yard be used for stabling stock?
     
    oliversbest нравится это.
  16. David R

    David R Well-Known Member

    Дата регистрации:
    30 июл 2013
    Сообщения:
    1.019
    Симпатии:
    1.390
    Пол:
    Мужской
    Адрес:
    Surrey
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    1 I beleive trackbed resverved but no plans to re-open
    2 Signalbox already leased to SR, I Believe
    3 Don't know
    4 No
    5 No - only the down sidings used to turnround DMU (so stabled there between arriving and departing)

    To expand on 5 - I beleive that DMU will travel up the down line from Worgret, crossover into the up platform at Wareham, depart in the up direction and crossover to the down line and into the down sidings, stable, then depart from the down sidings into the down platform and back down the down line to Worgret and Swanage.

    David R
     
  17. Steve1015

    Steve1015 Member

    Дата регистрации:
    26 май 2011
    Сообщения:
    902
    Симпатии:
    268
    Пол:
    Мужской
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The DMU will not be able to access the downsidings until after the new footbridge is built and the footpath closed. In the mean time if the service starts before the bridge is built they will terminate/start in the down platform
     
  18. steve45110

    steve45110 Member

    Дата регистрации:
    10 сен 2005
    Сообщения:
    309
    Симпатии:
    45
    Пол:
    Мужской
    Unusual. Why is the DMU different from the regular EMU's, that use the crossing every half an hour?
     
  19. David R

    David R Well-Known Member

    Дата регистрации:
    30 июл 2013
    Сообщения:
    1.019
    Симпатии:
    1.390
    Пол:
    Мужской
    Адрес:
    Surrey
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I beleive it may be to do with the new up to down crossover which enables access to the down sidings and as it is close to the crossing cannot be commissioned until the crossing is closed

    David R
     
    Last edited: 17 сен 2015
  20. Steve1015

    Steve1015 Member

    Дата регистрации:
    26 май 2011
    Сообщения:
    902
    Симпатии:
    268
    Пол:
    Мужской
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Its because the shunt signals into/out of sidings are not interlocked with the warning lights on the footpath.
     