If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Industrial Loco Updates

Тема в разделе 'Steam Traction', создана пользователем AlistairS, 17 апр 2008.

  1. Jonno854

    Jonno854 New Member

    Дата регистрации:
    6 дек 2006
    Сообщения:
    158
    Симпатии:
    58
    Род занятий:
    Land Manager
    Адрес:
    Hook Norton
    RSH 7416 'Agecroft No.1' has arrived at the NRM and appears to be their working loco for the summer, 31178 having gone back to the Bluebell. Steam works at weekends and every day during the school holidays, subject to staffing, boiler wash outs etc. This weekend was without steam as she needed steam test etc before taking up her duties.
     
    HY_4273 нравится это.
  2. northernsteam

    northernsteam Member

    Дата регистрации:
    25 май 2010
    Сообщения:
    609
    Симпатии:
    297
    Пол:
    Мужской
    Род занятий:
    Used to be in civil engineering, highway bridges.
    Адрес:
    Tyne and Wear
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Post retracted as not fully accurate and possibly misleading, sorry folks.
     
    Last edited: 13 июл 2018
  3. estwdjhn

    estwdjhn Member

    Дата регистрации:
    24 янв 2013
    Сообщения:
    342
    Симпатии:
    693
    Род занятий:
    Boilermaker
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Err,what happened? Your description makes it sound like the smokebox tubeplate has "come off" the angle ring, but that's not a usual failure mode (and would, even in light steam, result in a fairly spectacular explosion).
     
  4. Steve

    Steve Resident of Nat Pres Friend

    Дата регистрации:
    7 окт 2006
    Сообщения:
    12.729
    Симпатии:
    11.847
    Род занятий:
    Gentleman of leisure, nowadays
    Адрес:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The statement is intriguing me, as well. Is it simply a leak between the template and the angle ring which a bit of caulking would cure?
     
  5. MichaelDNTR

    MichaelDNTR New Member

    Дата регистрации:
    11 июл 2018
    Сообщения:
    1
    Симпатии:
    6
    Пол:
    Мужской
    Адрес:
    Newcastle
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I’d just like to weigh in here and clear a few things up as some of the above information isn’t quite correct. I was on site shortly afterwards so feel like I’m well placed to comment. A.No.5 developed a leak on the lap joint between the firebox crown and the tube plate whilst the locomotive was in steam. The crew failed the engine, filled the boiler and threw out the fire to be on the safe side. It certainly wasn’t a catastrophic separation of boiler plates! We still are unsure as to the exact cause of the leak but we think there could be some corrosion of a handful of rivets, we’ll only know after the boiler inspector has had a look but she’s laid up for the time being.
     
    clinker, Bluenosejohn, 30854 и 3 другим нравится это.
  6. sleepermonster

    sleepermonster Member

    Дата регистрации:
    19 июн 2007
    Сообщения:
    953
    Симпатии:
    1.094
    Bagnall 2746 The Duke

    Word from the boiler contractor is that we may hope for the new backhead shortly, now the weather is just a little cooler, plus our share of a bulk order of boiler tubes.

    Meanwhile, work continues on various minor but essential items. The bunker has been fitted with coal rails and lamp irons, and work has started on re-fitting the cab windows. I am thinking of using polycarbonate for the back windows, which are likely to get bashed by lumps of coal; does this fare better than Perspex?

    Meanwhile we have found another old fashioned iron mongers and have been increasing our Whitworth stock; presently we have: 1/2" and 3/8" bright steel studs, 1/2"steel hex head and countersunk slothead machine screws in various lengths, from 1" upwards, boxes of steel 1" 1/2" and 3/8" nuts. Brass: 3/8" 1/2" 5/8" wingnuts, 3/8" domehead machine screws various lengths, 1/2 brass slothead countersunk machine screws, various lengths. Of these, I understand that 1/2" wingnuts are useful for securing lubricators, csk steel machine screws are useful for holding down cab floors and 3/8" domeheads are often used on spectacle plates. Brass CSK is useful for attaching bronze side wear plates. If we can help, please get in touch.
     
    Last edited: 23 июл 2018
    jnc и 4468BenV нравится это.
  7. estwdjhn

    estwdjhn Member

    Дата регистрации:
    24 янв 2013
    Сообщения:
    342
    Симпатии:
    693
    Род занятий:
    Boilermaker
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    If it's the one I think it is, your backhead is now formed - however there is some detailing and dressing work to be completed before it will make it to your boilersmiths!
     
  8. 4468BenV

    4468BenV New Member

    Дата регистрации:
    23 дек 2011
    Сообщения:
    53
    Симпатии:
    16
    Can anyone help. I am after a steam brake cylinder for a 10" Barclay. I believe that the steam brake cylinders were the same for 10" and 12" Barclays.
    The hole spacing is 8 1/8" by 5",

    Holes in the frame are drilled to take 7/8 " driven bolts. Anyone can assist please send a message.

    General update is that the loco has had a lot of old plates removed for either cleaning up or to use as a template for new running boards. Cab still to clean up and sort out and a new roof is a definite! Lots of parts are at home for cleaning and painting up ready for when they can go back on!
     
    3855 нравится это.
  9. 32110

    32110 Member

    Дата регистрации:
    20 май 2006
    Сообщения:
    649
    Симпатии:
    794
    Пол:
    Мужской
    Род занятий:
    Retired from full time paid work
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I have taken a couple of photos of my 10" Barclay brake cylinder. The hole spacing is as you describe. If you want any measurements taken please let me know but I am not willing to dismantle it during our running season.

    General view AB1719 Brake Cylinder.jpg

    View from below AB1719 Brake Cylinder.jpg
     
    4468BenV нравится это.
  10. 3155

    3155 New Member

    Дата регистрации:
    23 ноя 2008
    Сообщения:
    197
    Симпатии:
    29
    Пол:
    Мужской
    Род занятий:
    loco owner
    Адрес:
    aintree
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Illingworth/Mitchell arrived at Ribble Steam Railway on 15th August for the September Gala, the Grant Ritchie is also due back at Preston in time for the Gala, which should also feature Linda & Courageous.

    3155
     
    4468BenV нравится это.
  11. 4468BenV

    4468BenV New Member

    Дата регистрации:
    23 дек 2011
    Сообщения:
    53
    Симпатии:
    16

    That is two great shots indeed. Can fully understand why you wouldn't want to dismantle it whilst it is the running season.
    Thank you for your kind offer for providing measurements. I will PM you if that is ok?
     
  12. 32110

    32110 Member

    Дата регистрации:
    20 май 2006
    Сообщения:
    649
    Симпатии:
    794
    Пол:
    Мужской
    Род занятий:
    Retired from full time paid work
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Please go ahead.
     
  13. sleepermonster

    sleepermonster Member

    Дата регистрации:
    19 июн 2007
    Сообщения:
    953
    Симпатии:
    1.094
    Bagnall 2746 The Duke

    We keep plodding away; no firm news on the backhead yet. Meanwhile Mick Clarke has made some very neat brass catches for the rear cab windows and Simon has re-made the cylinder lubrication inlet so that everything is faced up square and concentric.

    We have had an enquiry for the use of the Austerity chimney pattern which we own jointly with Ribble Steam Railway. If anyone else is considering a new chimney, this may be the time to get in touch.
     
    Bluenosejohn и ilvaporista нравится это.
  14. Avonside1563

    Avonside1563 Well-Known Member

    Дата регистрации:
    13 июл 2007
    Сообщения:
    1.141
    Симпатии:
    244
    Пол:
    Мужской
    Адрес:
    Bolton's Sidings, just behind the running shed!
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Some boiler fittings have been obtained, including two Peckett injectors, towards the restoration of Ackton Hall No.3 at Foxfield and we are putting together a proposal for various methods of fund raising. We have also had an estimate for repairs to the boiler and the motion has been stripped for assessment. So far there haven't been any horrible discoveries we weren't already aware of, and some pleasant surprises, such as the crank pins which are all in excellent condition. As they say, watch this space.
     
    4468BenV, ragl и Bluenosejohn нравится это.
  15. Alex G

    Alex G New Member

    Дата регистрации:
    9 сен 2008
    Сообщения:
    144
    Симпатии:
    96
    Пол:
    Мужской
    Адрес:
    Swansea
    0-6-0 Bagnall 3061 'Empress' has been purchased and moved to the Pontypool & Blaenavon Railway, it has 5 years remaining on its boiler ticket and its first runs took place last weekend for our steam gala.

    Does anyone have a spare set of Bagnall brass window frames or a pattern suitable for this loco please?

    Alex.
     
  16. Avonside1563

    Avonside1563 Well-Known Member

    Дата регистрации:
    13 июл 2007
    Сообщения:
    1.141
    Симпатии:
    244
    Пол:
    Мужской
    Адрес:
    Bolton's Sidings, just behind the running shed!
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Ackton Hall's springs have been sent away for assessment (which I have no doubt will come back as they are f****d) but in the meantime the cylinder/valve chest covers have been removed and everything looks to be in very good condition. We have also obtained a replacement set of Peckett buffers as three out of the four on the loco have broken castings. Behind the scenes things are progressing towards fund raising proposals.
     
  17. sleepermonster

    sleepermonster Member

    Дата регистрации:
    19 июн 2007
    Сообщения:
    953
    Симпатии:
    1.094
    Bagnall 2746 The Duke

    Still waiting for delivery of the backhead. The subcontractor tells me that the basic pressing has been made, but needs some careful adjustment. For the moment, LMS are stuck. Meanwhile there are plenty of detail jobs to be done; the rear cab windows have been glazed and fitted, Simon is machining new safety valve parts, Mick is making fittings for the saddletank and John is welding up the access holes which were cut to enable the tank to be cleaned.
     
  18. 61624

    61624 Part of the furniture

    Дата регистрации:
    27 сен 2006
    Сообщения:
    5.294
    Симпатии:
    3.599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Lambton tank no 29 had its new cylinder block fitted to it frames yesterday. Next, the newly drilled mounting holes have to be reamed and fitted bolts made, then the loco has to be re-assembled
     
    banburysaint, Fireline, oddsocks и ещё 1-му нравится это.
  19. thegrimeater

    thegrimeater Member

    Дата регистрации:
    12 сен 2008
    Сообщения:
    525
    Симпатии:
    116
    Пол:
    Мужской
    Род занятий:
    Admin
    Адрес:
    Huntingdon/Sheringham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    1700 Wissington is running on Saturday at the NNR/M&GN society members and shareholders day. She will also operate driver for a fiver along with the other locos (Y14, B12, WD, 9F and class 20 diesel) Timetable on M&GN society website.
     
  20. sleepermonster

    sleepermonster Member

    Дата регистрации:
    19 июн 2007
    Сообщения:
    953
    Симпатии:
    1.094
    Bagnall 2746 The Duke

    Word from the subcontractor is that the new backhead pressing is ready for delivery to LMS at Loughborough.
     

Поделиться этой страницей