7027 Thornbury Castle

Тема в разделе 'Steam Traction', создана пользователем svrhunt, 18 янв 2015.

  1. Copper-capped

    Copper-capped Part of the furniture

    Дата регистрации:
    19 апр 2017
    Сообщения:
    3.350
    Симпатии:
    4.071
    Пол:
    Мужской
    Адрес:
    Stanthorpe, QLD, Australia
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Have they factored in the cost of ill will?
     
    Hirn, 1472, Matt37401 и ещё 1-му нравится это.
  2. Tobbes

    Tobbes Member

    Дата регистрации:
    14 авг 2010
    Сообщения:
    935
    Симпатии:
    2.606
    Brutal, but not wrong. The 'cottage industry' comment in the NRM report into their first restoration of a certain A3 keeps ringing true.
     
    Spinner, Mrcow, Miff и ещё 1-му нравится это.
  3. GWR4707

    GWR4707 Nat Pres stalwart

    Дата регистрации:
    12 май 2006
    Сообщения:
    19.232
    Симпатии:
    17.566
    Пол:
    Мужской
    Адрес:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Considering they appear to have agreed to buy 7027 and then apparently gone cap in hand to the GWS to actually pay for her (and it still being unclear if they or in fact anyone has now paid for her) I would be inclined not to assume anything, like much with this project it seems to be a bit back of envelope and changes with the wind.
     
  4. GWR4707

    GWR4707 Nat Pres stalwart

    Дата регистрации:
    12 май 2006
    Сообщения:
    19.232
    Симпатии:
    17.566
    Пол:
    Мужской
    Адрес:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Work that was done in the same workshop and at the same time as the basic erection of the frames of 4709...
     
  5. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    Дата регистрации:
    31 авг 2010
    Сообщения:
    5.615
    Симпатии:
    9.418
    Пол:
    Мужской
    Род занятий:
    Asset Engineer (Signalling), MNLPS Treasurer
    Адрес:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    New build projects using all new material may cost more in the short term but provided they do their paperwork and no rework is involved, will end up cheaper in the long run. See: tornado, despite current issues.

    The Patriot is an unfortunate first time recipient of the fundamental principle that planning is everything. It needed better planning and quality assurance. Happily they are fixing what is wrong - yes, it is frustrating for them that it wasn’t right first time.

    Reusing parts is always fraught with issues and should be approach with caution.

    The Saint worked because much of the fabric of the hall was retained, it was a close conversion. The further the alterations you need and the worse condition the parts are, the more danger of getting it wrong happens.

    As for cost - repairing old has its own issues and costs and may not be cheaper than new building. The converse can be true of course, but I suspect the cost of materials and labour probably edges new build components for new build and conversion projects now.

    But what would I know? I’ve only been treasurer to a locomotive undergoing overhaul for the last year, and have been treasurer to an operating locomotive for the last four years…
     
    MikeParkin65, 21B, Cartman и 3 другим нравится это.
  6. MellishR

    MellishR Resident of Nat Pres Friend

    Дата регистрации:
    16 апр 2009
    Сообщения:
    8.911
    Симпатии:
    5.847
    It happened with Duke of Gloucester's restoration, I think just because of some missing paperwork.
     
  7. 61624

    61624 Part of the furniture

    Дата регистрации:
    27 сен 2006
    Сообщения:
    5.294
    Симпатии:
    3.599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think you have inadvertently made my point for me. The loco you have been treasurer for the past year is surely an atypical example in having a steel, rather than copper, firebox, and welded repairs to steel seem to be far less technically challenging than welding copper Don't know about the other loco that you allude to, but unless it has gone through a major copper firebox repair your experience may incomplete there too. In fact, very few groups have commissioned complete new copper fireboxes as yet, so information on costs for that type of work is very thin on the ground, so I'd respectfully suggest that it is an area very few people can comment on sensibly. I would, however, be very surprised if the costs of major work (e.g building new or extensive repairs) to a copper 'box were not substantially higher than a steel example. Feel free to prove me wrong, though, with some facts.
     
    Mrcow нравится это.
  8. Jamessquared

    Jamessquared Nat Pres stalwart

    Дата регистрации:
    8 мар 2008
    Сообщения:
    27.790
    Симпатии:
    64.453
    Адрес:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think the problems we are seeing with a number of projects amount to rather more than just missing paperwork.

    Tom
     
  9. 35B

    35B Nat Pres stalwart

    Дата регистрации:
    18 июн 2011
    Сообщения:
    28.731
    Симпатии:
    28.657
    Пол:
    Мужской
    Адрес:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Indeed, I suspect that "missing paperwork" is very often a symptom of something deeper.
     
    Hampshire Unit и Tobbes нравится это.
  10. Matt37401

    Matt37401 Nat Pres stalwart

    Дата регистрации:
    8 июн 2014
    Сообщения:
    15.551
    Симпатии:
    11.955
    Адрес:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I’d agree with that, I think there’s some who think that on having a had a look in the latest Hornby, Bachmann, Lima, Mainline etc catalogue seem to think that whatever they’ve seen in those publications can be kitbashed in 1:1 scale.
    I seem to recall the A1 trust way back in the mid 90’s thought it would be a good idea to reuse the frames of a certain A3’s tender, after a while the decision was changed to ‘shall we just build a new one instead?’ After realising how much it easier it would be with all the mods and paper work it would entail.
     
    1472 и clinker нравится это.
  11. gwralatea

    gwralatea Member

    Дата регистрации:
    31 дек 2014
    Сообщения:
    510
    Симпатии:
    1.002
    Пол:
    Мужской
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Indeed - and after their own false starts the current team on the Clan are setting the gold standard for documentation and pre-work. I've said before that even if that project doesn't ultimately succeed - I am a member so I very much hope it does - it's going to leave an absolute library of technical and certification documentation on How To Build A Steam Engine.
     
    Spinner, ghost, S.A.C. Martin и ещё 1-му нравится это.
  12. clinker

    clinker Member

    Дата регистрации:
    8 окт 2016
    Сообщения:
    612
    Симпатии:
    372
    Пол:
    Мужской
    Адрес:
    romford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    As I remember It the debarkle over Duke of Gloucester was not so much missing, as out of date paperwork, thinking back 30 plus years I've got It in mind that the tubes had been purchased when work comenced on the boiler, and by the time the boiler was ready to have them fitted the paperwork showed them to effectively be life expired, I think that it was about seven years old. I can't remember if the tubes had been fitted prior to being condemned. Just as an aside, what was the position regarding mainline operation when the restoration of DoG comenced?
     
  13. Tobbes

    Tobbes Member

    Дата регистрации:
    14 авг 2010
    Сообщения:
    935
    Симпатии:
    2.606
    I very much hope the Clan succeeds, but this is a really important point.
     
    Hirn нравится это.
  14. 5944

    5944 Resident of Nat Pres

    Дата регистрации:
    14 янв 2006
    Сообщения:
    8.862
    Симпатии:
    9.257
    Пол:
    Мужской
    Род занятий:
    Train Maintainer for GTR at Hornsey
    Адрес:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I never understood the point in the Patriot lot using one wheelset from the 8F. They still needed to design and manufacture another one. Surely it wouldn't have cost that much more for a second wheelset to be made?
     
    clinker, Cartman, ghost и ещё 1-му нравится это.
  15. eldomtom2

    eldomtom2 New Member

    Дата регистрации:
    27 окт 2018
    Сообщения:
    149
    Симпатии:
    64
    Пол:
    Мужской
    Адрес:
    Jersey
    Heritage Railway Volunteer:
    No I do not currently volunteer
    This is true, but remember 4709 is competing for people's time and money with other projects. How many people really care about seeing a working 47XX?
     
    Great Western нравится это.
  16. 242A1

    242A1 Well-Known Member

    Дата регистрации:
    3 дек 2006
    Сообщения:
    1.561
    Симпатии:
    1.304
    I seriously doubt it. Rather like the WSR. Wonder what the common ground is here?
     
    Great Western и Copper-capped нравится это.
  17. Steve

    Steve Resident of Nat Pres Friend

    Дата регистрации:
    7 окт 2006
    Сообщения:
    12.729
    Симпатии:
    11.847
    Род занятий:
    Gentleman of leisure, nowadays
    Адрес:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I don't know the state of 7027's boiler but it was rumoured to be in good condition. It will depend on how it has been stored in the last 50 years but BR overhauled boilers were generally in good condition when sent to Barry and, internally are probably still OK with useful life in the firebox. If the elements have been good to it and its storage well managed so there has been little deterioration of the external plates, its overhaul may well be a relatively cheap affair. How much will depend on what is considered to be part of that boiler . Does it include the firegrate and ashpan, for example, and what about the superheater header and elements?
     
  18. Steve

    Steve Resident of Nat Pres Friend

    Дата регистрации:
    7 окт 2006
    Сообщения:
    12.729
    Симпатии:
    11.847
    Род занятий:
    Gentleman of leisure, nowadays
    Адрес:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I believe the A1 new build didn't exactly get off to a good start with a lot of the early work having to be re-done. The tender also came a cropper with regard to the brake gear of the new tender which was a direct copy of an original one. However, the inspecting authority realised that these tenders had no means of individual adjustment of the shoes and it was possible for all the brake force to be applied to just one pair of shoes and, under those circumstances they were overloaded. A new, beefed up set of brake gear had to be provided, so I'm told. It didn't apply to the existing, similar tenders as they had grandfather rights.
     
  19. 61624

    61624 Part of the furniture

    Дата регистрации:
    27 сен 2006
    Сообщения:
    5.294
    Симпатии:
    3.599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Fair points, but when it comes to quite a few items costs are likely to be the same for a new build as they would be for a repair. I'd be pleasantly surprised if the existing elements and ashpan were considered reusable but disappointed if the header wasn't, for example, and the point has been made previously that the locos at Barry generally were withdrawn with a good few years of residual life in them.
     
  20. 242A1

    242A1 Well-Known Member

    Дата регистрации:
    3 дек 2006
    Сообщения:
    1.561
    Симпатии:
    1.304
    And these locomotives were withdrawn more than fifty years ago. They will have deteriorated every day since withdrawal unless conservation and protection measures were adequately put in place. The passage of time breaks everything down, rust, moth, age or fatigue, everything gets swept away sooner or later. To protect and preserve an object which you might value demands time and other resources. Sometimes a line is drawn and sometimes it has to be drawn. John Cameron drew a line and stopped keeping his locomotives in working order and there are some locomotives out there which struggle to gain enough support to keep them working. Didcot has locomotives which have not worked in decades, do long term plans exist or have lines been drawn here? They are quite keen on building yet another Churchward or Collett type out of recycled bits but so far as Gooch, Armstrong and Dean goes?
    As things currently stand it is difficult to be convinced that either 4709 or 7027 have a secure and valued future.
     