If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

West Somerset Railway General Discussion

Rasprava u 'Heritage Railways & Centres in the UK' pokrenuta od gwr4090, 15. Studeni 2007..

  1. ghost

    ghost Part of the furniture

    Pridružen(a):
    29. Svibanj 2006.
    Poruka:
    4,303
    Lajkova:
    5,727
    Spol:
    Muškarac
    Grad:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Different owners
     
  2. Jamessquared

    Jamessquared Nat Pres stalwart

    Pridružen(a):
    8. Ožujak 2008.
    Poruka:
    27,790
    Lajkova:
    64,455
    Grad:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There's "high up the overhaul queue" and "we have the money and capacity (people, workshop space, skills, ...) to overhaul it rapidly". They aren't necessarily the same thing!

    Tom
     
    acorb, Bluenosejohn, Paul42 i 4 ostalih se sviđa ovo.
  3. Miff

    Miff Part of the furniture Friend

    Pridružen(a):
    17. Lipanj 2008.
    Poruka:
    3,000
    Lajkova:
    3,023
    Surely they are the same thing - how else would anything get to the top of the queue? :)
     
  4. Cuckoo Line

    Cuckoo Line Member

    Pridružen(a):
    29. Kolovoz 2020.
    Poruka:
    373
    Lajkova:
    382
    Spol:
    Muškarac
    Grad:
    South West
    Heritage Railway Volunteer:
    No I do not currently volunteer
    By getting money donated/allocated that particular engine allows overhaul to proceed. I guess Tom is referring to group owned engines that have their own fund raising.
     
  5. Miff

    Miff Part of the furniture Friend

    Pridružen(a):
    17. Lipanj 2008.
    Poruka:
    3,000
    Lajkova:
    3,023
    Whether group-owned or railway owned I’d say ‘high in the overhaul queue’ is either meaningless or impossible if the resources aren’t there.

    And ‘Low in the overhaul queue’ means precisely: “It’d be nice to get this one running again someday - but the resources aren’t there”
     
    Last edited: 2. Veljača 2024.
  6. Jamessquared

    Jamessquared Nat Pres stalwart

    Pridružen(a):
    8. Ožujak 2008.
    Poruka:
    27,790
    Lajkova:
    64,455
    Grad:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes, which is rather my point. Enthusiasts seem quite fond of asserting the position of this or that loco in some hypothetical overhaul queue, but it is meaningless without the resources being available.

    I’m not aware that 80064 came with much of a dowry, and one assumes that the WSR plc policy is “when a loco is available, we’ll pay a fee to hire it”. Which rather suggests that overhaul is therefore down to the WSRA to fund. How long has 4561 been under overhaul? Unless there is a step change in fundraising capacity, (or it is somehow in spectacularly good condition yet that fact was overlooked for 30 years …) I can’t see 80064 being ready to run any time soon.

    Tom
     
    alexl102, ghost, Sunnieboy i 1 drugoj osobi se sviđa ovo.
  7. brennan

    brennan Member

    Pridružen(a):
    11. Rujan 2016.
    Poruka:
    408
    Lajkova:
    452
    Grad:
    Gloucester
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Agreement on Washford between WSRHT & S&DRT


    The West Somerset Railway Heritage Trust (WSRHT) and Somerset & Dorset Railway Trust (S&DRT) are delighted to confirm that they have finalised the agreement to purchase the S&DRT shed and track at Washford. In addition, the WSRHT has signed an agreement for a 10-year lease of the site from WSR PLC, both agreements being effective from 1st February 2024.

    Mike Thompson, Chairman of the WSRHT commented, "I am really pleased that we have been able to reach an agreement with the S&DRT for the Washford assets. The agreement will benefit both the WSRHT with improved facilities and the S&DRT by providing funds to invest in their future activities. The deal was very complex to finalise owing to the need for simultaneous agreement between three parties, which of course required three sets of legal teams. I must especially thank Roger Hardingham, S&DRT Chairman, Joy Boswell, Finance Director of WSR PLC and Steve Williams, Vice Chairman of WSRHT, who between them had the tenacity to navigate an extremely complex set of articles in the final agreements".

    Roger Hardingham, Chairman of the S&DRT said, "I am delighted to have completed the final arrangements at Washford which will allow the S&D Trust to embark on new ventures elsewhere along the original S&D route, and other locations, to keep the fascinating history of the Somerset & Dorset Railway alive".

    The agreement will help secure proper covered facilities for the WSRHT Carriage Restoration team who until now have had to work largely in the open at Williton, where the Trust will now cease restoration activities.

    The WSRHT plans to move most of its fleet of heritage carriages to Washford over the next 12 months, from their existing locations at Williton and Dunster. All future carriage restoration activities will then take place in the 3-track shed at Washford.

    As part of the lease agreement, the WSRHT has agreed to adopt and operate all activities using the WSR PLC Safety Management System. It will also invest further in the Washford site, and will work with the PLC to support the sustainability of the heritage and historic nature of Washford station.
     
    acorb and JBTEvans like this.
  8. ilvaporista

    ilvaporista Part of the furniture

    Pridružen(a):
    16. Siječanj 2006.
    Poruka:
    4,356
    Lajkova:
    5,455
    Spol:
    Muškarac
    Interesi:
    C.Eng
    Grad:
    On the 45th!
    So this was the great master plan all along?? Take a well kept shed and additional attraction along the line, in sight of the station, and turn it into parking for yet to be restored coaches? It's not going to look pretty again for a good few years, based on the current rate of coach restoration.
     
    Piggy se sviđa ovo.
  9. nick813

    nick813 Well-Known Member Loco Owner

    Pridružen(a):
    28. Siječanj 2010.
    Poruka:
    1,523
    Lajkova:
    1,595
    Spol:
    Muškarac
    Grad:
    poole dorset
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  10. martin1656

    martin1656 Nat Pres stalwart Friend

    Pridružen(a):
    8. Prosinac 2014.
    Poruka:
    19,263
    Lajkova:
    12,514
    Spol:
    Muškarac
    Grad:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Was there ever a real plan, the PLC had placed themselves in a position, whereby they couldnt be seen to back down, there might have been some active behind the scenes who did have a plan, and that plan was to engineer the removal of what they saw as an interloper, a non-GW entity, on what they thought should have been a GW themed railway, and of course a few words in someones ear, when he was told no, our rules don't let us give the PLC money, played into their hands, prehaps they always wanted Washford and the covered accomodation, it offered?
     
  11. Snifter

    Snifter Well-Known Member

    Pridružen(a):
    26. Kolovoz 2014.
    Poruka:
    1,692
    Lajkova:
    4,298
    Spol:
    Muškarac
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Only a 10 year lease ? With the PDG dissolved by the plc without any consultation, who is going to own the freehold in 2034 ?
     
    Fish Plate se sviđa ovo.
  12. ghost

    ghost Part of the furniture

    Pridružen(a):
    29. Svibanj 2006.
    Poruka:
    4,303
    Lajkova:
    5,727
    Spol:
    Muškarac
    Grad:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Surely the PLC cannot dissolve the PDG unilaterally?
    It could withdraw from the PDG if it so wished, but it can't close it down when it is a collaboration with numerous other groups.

    This could backfire on the PLC in the future.
    If the others keep the PDG going and the council did decide at some point to sell the freehold, then it is more likely to (under obligation to?) sell to one of the groups still engaged in the PDG...
     
    Piggy, RailWest, MellishR i 1 drugoj osobi se sviđa ovo.
  13. JBTEvans

    JBTEvans Part of the furniture

    Pridružen(a):
    14. Veljača 2008.
    Poruka:
    2,597
    Lajkova:
    793
    Spol:
    Muškarac
    Grad:
    Casnewydd, De Cymru
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Maybe undercover storage may quicken things up a bit?

    Not sure what difference anything makes to sights if it's in a shed?
     
  14. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    Pridružen(a):
    9. Rujan 2013.
    Poruka:
    10,674
    Lajkova:
    18,698
    Spol:
    Muškarac
    Grad:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It's a 3 road shed that looks about 1 bogie coach long. So maximum of three coaches inside. I don't know how tight it is inside or if, to actually have any space to do work, even 3 might be too full? How many does the WSRHT heritage fleet count for these days? I know there are some coaches knocking around that aren't technically part of the plan.

    If it enables the WSR to finally pick up the pace on some of their GWR stock then I think we ought to acknowledge that is a silver lining to this sorry affair. It'll be interesting to see how it develops in the next few years as they all look like major projects, with a no doubt dedicated but very small team. A full rake feels ambitious, maybe set sights on a 'local set' and look to move some on?
     
    Miff and Matt37401 like this.
  15. shed basher

    shed basher New Member

    Pridružen(a):
    8. Veljača 2009.
    Poruka:
    8
    Lajkova:
    4
    Don’t the PLC pay for extra space at Williston for these coaches? Moving them to Washford makes total sense to cut costs.
     
    JBTEvans se sviđa ovo.
  16. RailWest

    RailWest Part of the furniture

    Pridružen(a):
    7. Prosinac 2011.
    Poruka:
    3,984
    Lajkova:
    7,802
    Spol:
    Muškarac
    Grad:
    West Country
    Why would the PLC pay to house WSRHT stock? More likely surely that the WSRHT is paying the PLC to use land which the PLC in turn is leasing from elsewhere, so the PLC recovers its costs that way.
     
    ikcdab se sviđa ovo.
  17. JBTEvans

    JBTEvans Part of the furniture

    Pridružen(a):
    14. Veljača 2008.
    Poruka:
    2,597
    Lajkova:
    793
    Spol:
    Muškarac
    Grad:
    Casnewydd, De Cymru
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The yard the carriages are in is owned by a third party AFAIK.
     
  18. Keith Sims

    Keith Sims Member

    Pridružen(a):
    22. Ožujak 2015.
    Poruka:
    236
    Lajkova:
    702
    Spol:
    Muškarac
    Interesi:
    retired from volunteering
    Grad:
    Somerset
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Drove past Trible Bridge this afternoon. Caught a glimpse of the massive new wall being built. it looks like quite an operation even before the big job of completely relaying the the track. quite an operation to get done before the new season starts.
     
    1472 and SebWelsh like this.
  19. SebWelsh

    SebWelsh Member

    Pridružen(a):
    15. Kolovoz 2014.
    Poruka:
    219
    Lajkova:
    1,277
    Spol:
    Muškarac
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Latest update from us on the Gala front. I hope you all agree it is coming together nicely at present.

    The planning work for the Spring Steam Spectacular (to be held between Friday 3rd May and Monday 6th May) is still continuing. Here's a reminder of what we have announced for the event so far. More information will be provided and this is not a full list of attractions yet - there will be more. Tickets are available to purchase at a discount in advance now.

    Visiting Locomotives
    - LNER B1 4-6-0 no.61306 'Mayflower'
    - LNWR Coal Tank 0-6-2T no.1054
    - GWR 28XX 2-8-0 no.2807
    - GWR 66XX 0-6-2T no.6695
    - 5th Mystery Guest locomotive to still be announced

    Home Fleet Locomotives
    - BR(W) 94XX 0-6-0 Pannier no.9466
    - BR(W) 78XX 4-6-0 no.7828 Odney Manor
    - WSR Mogul 2-6-0 no.9351

    - 8 engines in steam each day
    - Busy timetables running from early morning into the evening each day
    - Later evening trains on the Saturday finishing around 10pm
    - Interesting double-headed workings
    - Some top and tail/banked trains
    - Goods Train in use with brakevan rides offered on some services
    - Shunting Demonstrations
    - Local passenger trains
    - Local demonstration parcels trains which you'll be able to travel on (Fri & Mon only)
    - Express/Semi-fast services
    - Running to Norton Fitzwarren
    - Locomotive turning at both ends of the line, as many trains as possible will run smokebox first
    - Various heritage displays along the line
    - Kids for a Quid deal (Sun & Mon only)

    Further information regarding additional attractions will be announced closer to the time. I hope you agree we have quite the show for you this year, please book your tickets to attend at the link below.

    https://www.west-somerset-railway.co.uk/events/view/spring-steam-spectacular
     
  20. 6026 King John

    6026 King John Well-Known Member

    Pridružen(a):
    10. Studeni 2006.
    Poruka:
    1,616
    Lajkova:
    908
    Grad:
    Hampton Court, Surrey
    I'm in suspense waiting to see what the 5th visitor will be - your challenge is to find something I haven't seen before!
     
    SebWelsh se sviđa ovo.

Podijelite ovu stranicu