    From my visit in January, that was the status of the 1st of the 2 new boilers. so not much changed, its construction was being checked and signed off at various critical stages, by an independent engineer.
    No boiler has been delivered yet, as i would expect that to be all over the local news, they follow the build really well.
    If it does arrive, will let everyone know.
     
    osprey, class8mikado و The Green Howards معجبون بهذا.
  2. class8mikado

    class8mikado Part of the furniture

    إنضم إلينا في:
    ‏1 جوان 2009
    المشاركات:
    3,872
    عدد المعجبين:
    1,663
    الوظيفة:
    Print Estimator/ Repository of Useless Informatio.
    مكان الإقامة:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    And lets be honest, unless something untoward occurs with the boiler Tornado is carrying there is no massive rush other than the need for some publicity column inches.
    Wonder if they can get a UK boiler Inspector over there to look it over before it ships this time.!?
    Am i right in thinking that the superheater fitting will be done in the UK ? don't recall a superheater header being made as yet...
     
  3. Sheff

    Sheff Resident of Nat Pres

    إنضم إلينا في:
    ‏21 إبريل 2006
    المشاركات:
    8,111
    عدد المعجبين:
    3,191
    الجنس:
    ذكر
    الوظيفة:
    Retired Engineer & Heritage Volunteer
    مكان الإقامة:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Well if they’d got the cylinder block in then a boiler could come in useful. But as the whole project is now so far off course then there aren’t any current targets AFAIK?
     
  4. guycarr360

    guycarr360 Part of the furniture

    إنضم إلينا في:
    ‏4 اكتوبر 2005
    المشاركات:
    4,888
    عدد المعجبين:
    3,196
    الجنس:
    ذكر
    مكان الإقامة:
    Chester le Street County Durham
    First they need a new cannon box casting to get the pony truck in, as that becomes a pain, from the comment on my visit.

    Maybe they are getting forced to accept it, (boiler No 2), as the failures and possible construction errors on the very 1st boiler are now rectified.
    Just a thought.
     
    أعجب بهذه المشاركة Sheff
  5. class8mikado

    class8mikado Part of the furniture

    إنضم إلينا في:
    ‏1 جوان 2009
    المشاركات:
    3,872
    عدد المعجبين:
    1,663
    الوظيفة:
    Print Estimator/ Repository of Useless Informatio.
    مكان الإقامة:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Of course, as soon as it is complete the makers will want out of the way and paid for.
     
  6. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,840
    عدد المعجبين:
    12,060
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A boiler inspector is going to be concerned with its suitability as a pressure vessel, not its dimensional accuracy.
     
  7. class8mikado

    class8mikado Part of the furniture

    إنضم إلينا في:
    ‏1 جوان 2009
    المشاركات:
    3,872
    عدد المعجبين:
    1,663
    الوظيفة:
    Print Estimator/ Repository of Useless Informatio.
    مكان الإقامة:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Indeed , so lets not have a re-tube this time ?
     
  8. W.Williams

    W.Williams Well-Known Member

    إنضم إلينا في:
    ‏20 ديسمبر 2015
    المشاركات:
    1,660
    عدد المعجبين:
    1,579
    الوظيفة:
    Mechanical Engineer
    مكان الإقامة:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Indeed, but the recieving clinet will have a drawing that the boiler should comply to, and of course a dimensional report will be on hand demonstrating compliance.

    I presume.
     
    Steve و Sheff معجبون بهذا.
  9. Sheff

    Sheff Resident of Nat Pres

    إنضم إلينا في:
    ‏21 إبريل 2006
    المشاركات:
    8,111
    عدد المعجبين:
    3,191
    الجنس:
    ذكر
    الوظيفة:
    Retired Engineer & Heritage Volunteer
    مكان الإقامة:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Anybody seen the boiler anywhere? I’ve heard nothing since Davies informed the faithful that the latest revision of the delivery date was now April. July is now looming large ….. I think I need to check back in my records on the previous due dates ……

    Although, iirc, the boiler won’t be mounted until the cylinder block is installed in the frames, of which there’s no news either, so it could all be rather academic ?
     
  10. guycarr360

    guycarr360 Part of the furniture

    إنضم إلينا في:
    ‏4 اكتوبر 2005
    المشاركات:
    4,888
    عدد المعجبين:
    3,196
    الجنس:
    ذكر
    مكان الإقامة:
    Chester le Street County Durham
    And before which they need a canon box casting, then machined, for pony truck to be fitted.
     
  11. osprey

    osprey Resident of Nat Pres

    إنضم إلينا في:
    ‏3 اكتوبر 2007
    المشاركات:
    10,685
    عدد المعجبين:
    2,933
    الوظيفة:
    semi-retired, currently doing R&D for my patents
    مكان الإقامة:
    Halifax
    Keep it clean please...less of the " mounting".......
     
    أعجب بهذه المشاركة Sheff
  12. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,515
    عدد المعجبين:
    12,668
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Something has to cause the slippage in delivery times, But I doubt we will be told, what.
     
    أعجب بهذه المشاركة Sheff
  13. Sheff

    Sheff Resident of Nat Pres

    إنضم إلينا في:
    ‏21 إبريل 2006
    المشاركات:
    8,111
    عدد المعجبين:
    3,191
    الجنس:
    ذكر
    الوظيفة:
    Retired Engineer & Heritage Volunteer
    مكان الإقامة:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Shhhh - you’ll get me suspendered.
     
  14. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,515
    عدد المعجبين:
    12,668
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    For one horrible second i thought i read, " I will get my suspenders " :D
     
  15. DismalChips

    DismalChips Member

    إنضم إلينا في:
    ‏11 إبريل 2016
    المشاركات:
    690
    عدد المعجبين:
    720
    مكان الإقامة:
    9A
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The hot weather is clearly having an impact on this thread.
     
    Sheff و The Dainton Banker معجبون بهذا.
  16. Sheff

    Sheff Resident of Nat Pres

    إنضم إلينا في:
    ‏21 إبريل 2006
    المشاركات:
    8,111
    عدد المعجبين:
    3,191
    الجنس:
    ذكر
    الوظيفة:
    Retired Engineer & Heritage Volunteer
    مكان الإقامة:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Well this one slipped through under the radar ……

    Richard Courtney-Harris (Major ret.) Trustee and P2 Project Coordinator resigned on May 5th. His resignation appears to leave the P2 Project without a champion at board level.

    Also AFAIK the Covenantors still haven’t been informed of the resignation of Graham Bunker-James back in November 2023, or the why-for?
     
    Last edited: ‏25 جوان 2025