If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

SVR Loco Newsy News / discussions

Discuție în 'Steam Traction' creată de acorb, 26 Iul 2009.

  1. 46118

    46118 Part of the furniture

    Înscris:
    16 Sep 2005
    Mesaje:
    4.043
    Aprecieri primite:
    212
    D1039 and 1472:

    Thanks to both for a comprehensive resume. Most interesting.

    Are 1501, 7714, and 6634 likely contenders for service in 2011?

    In asking that, I do appreciate that it depends on activety away from Bridgnorth for at least two of these engines.
     
  2. 1472

    1472 Well-Known Member

    Înscris:
    26 Aug 2008
    Mesaje:
    1.954
    Aprecieri primite:
    2.639
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Only a personal guesstimate but would see returns to traffic as:

    2857 - first half of 2011
    1501 - second half of 2011
    7714 - end of 2011/beginning of 2012
    6634 - 2012 depending on boiler completion at Crewe
    34027 - dependant on boiler completion at Pridham's/SDR
     
  3. D1039

    D1039 Guest

    Hawthorn Leslie 2859 (Tanfield Railway No 2), from SVR Engineering website

    Patrick
     
  4. D1039

    D1039 Guest

  5. D1039

    D1039 Guest

    November loco notes
    Mark Vrettos reports from the BH mpd http://bridgnorthstation.blogspot.com/

    Early in October we used the wheeldrop for Bradley Manor to drop out the leading tender wheelset which had wheel flats.

    We seem to be getting a lot of these recently with 42968's tender being withdrawn early, and a number of carriages red carded. There are some views on how these appear, and we must get a grip of this problem, as it is now costing the railway serious time and money.

    2857 was lowered onto its wheels on Monday 25 October. Now all the bits can be bolted on. It will come off the jacks when the springs and rods are fitted. The boiler is being readied for its steam test and safety valve setting. After this we will be looking for a gang to paint the boiler with the heat resistant paint, planned for 4-5 Nov.

    We are planning the next few months of work going into next year. We need to get some more midweek help to push the various projects along.

    1501, 813 (contract), 5164 (wheeldrop, 53,000 miles), and a start on 75069 are in the frame, along with finishing 2857 and 6634.

    As well as this, we need to carry out a valve and piston exam on 7802, so there is a massive undertaking of work required.

    If it is left to paid staff only, we will have to drop overhauls in favour of running repairs, and we need 2857 for next year's season.

    To do all this we need more help than we get at the moment. The railway being shut in January-early February does not mean that the work stops. In the loco works, conversely, it increases!
     
  6. Mighty Mogul

    Mighty Mogul Well-Known Member

    Înscris:
    5 Ian 2007
    Mesaje:
    1.462
    Aprecieri primite:
    6
    Ocupație:
    Artist
    Locație:
    7037
    Interesting to read this as I believed from what I heard/read elsewhere that the overhaul of the loco was postponed indefinately as a result of the recent assessment throwing up far more work required than was hoped. Would be a fantastic (and very useful) loco to have back in oepration on the SVR.
     
  7. acorb

    acorb Part of the furniture

    Înscris:
    17 Iul 2007
    Mesaje:
    2.950
    Aprecieri primite:
    4.381
    Locație:
    Powys
    From my understanding it was never indefinite, just a case of 1501 queue jumping. The amount of work needed will put it very much in the longer term 'heavy' category akin to 43106/2857 whereas 1501 needed less work and could mean a useful loco quicker. Though must admit it's a pleasant suprise to see it being considered again so quickly.
     
  8. D1039

    D1039 Guest

    Then there were 8! Undergoing renovation are 4150 at Bewdley; 2857, 34027, 6634, 1501, 7714 (boiler) at Bridgnorth and 813 and 2047 having contract boiler assessments.

    In addition to works on 75069 being 'in the frame' possibly to start in 2011, the Friends of Hagley Hall website http://www.4930hagleyhall.org.uk/ has a news update which says that the overhaul is due to commence in 2012 subject to completion of Taw Valley, successful fund raising done by the Friends reaching £100,000 and there being no loco prior failures that may take precedence in the overhaul queue.

    Patrick
     
  9. b.oldford

    b.oldford Member

    Înscris:
    29 Sep 2009
    Mesaje:
    245
    Aprecieri primite:
    55
    Sex:
    Masculin
    Locație:
    Shropshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    For those that find it of interest.

    Warwickshire was delivered to BH this afternoon by Allerlys.
     
  10. Fireline

    Fireline Well-Known Member

    Înscris:
    11 Feb 2008
    Mesaje:
    1.301
    Aprecieri primite:
    1.348
    Sex:
    Masculin
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Apologies if I've missed it somewhere, but why the move?
     
  11. Steve from GWR

    Steve from GWR Well-Known Member

    Înscris:
    18 Feb 2010
    Mesaje:
    1.292
    Aprecieri primite:
    14
  12. 61624

    61624 Part of the furniture

    Înscris:
    27 Sep 2006
    Mesaje:
    5.294
    Aprecieri primite:
    3.599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It's interesting that it was moved from Kidderminster to Bridgnorth by Alleleys - last time I looked they were a road haulage company, and Bridgnorth and Kidderminster were joined by a perfectly servicable railway line!
     
  13. Orion

    Orion Well-Known Member

    Înscris:
    17 Aug 2009
    Mesaje:
    1.355
    Aprecieri primite:
    5
    Ocupație:
    Pensioner!
    Locație:
    North-west London
    Is that 'Taw Valley's boiler on blocks at Bridgenorth?

    Regards
     
  14. Matt35027

    Matt35027 Well-Known Member

    Înscris:
    16 Oct 2009
    Mesaje:
    1.122
    Aprecieri primite:
    143
    Sex:
    Masculin
    Ocupație:
    Builder
    Locație:
    Near 74D
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If you mean the one in the yard that is Sidmouth's.
     
  15. lewis.maddox

    lewis.maddox Member

    Înscris:
    14 Dec 2008
    Mesaje:
    890
    Aprecieri primite:
    48
    Sex:
    Masculin
    Ocupație:
    Visitor Engagement Manager, Severn Valley Railway
    Locație:
    Worcestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I presume it was because work has now commenced on the Bridgnorth to Highley section, making it nonnegotiable...?
     
  16. 1472

    1472 Well-Known Member

    Înscris:
    26 Aug 2008
    Mesaje:
    1.954
    Aprecieri primite:
    2.639
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It is also rather a long time since Warwickshire turned a wheel - no doubt quite a lot of work would have been necessary just to get it onto the running lines (the museum is not rail connected currently) and sort axleboxes, motion etc.
     
  17. Orion

    Orion Well-Known Member

    Înscris:
    17 Aug 2009
    Mesaje:
    1.355
    Aprecieri primite:
    5
    Ocupație:
    Pensioner!
    Locație:
    North-west London
    I was hoping it wasn't 'Taw Valley''s because the smokebox is so badly corroded. Is the rest of 'Sidmouth' on site?

    Regards
     
  18. Matt35027

    Matt35027 Well-Known Member

    Înscris:
    16 Oct 2009
    Mesaje:
    1.122
    Aprecieri primite:
    143
    Sex:
    Masculin
    Ocupație:
    Builder
    Locație:
    Near 74D
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The rest of Sidmouth is spread between the Swanage and Herston works.
     
  19. michaelh

    michaelh Part of the furniture

    Înscris:
    29 Apr 2006
    Mesaje:
    3.080
    Aprecieri primite:
    1.291
    Sex:
    Masculin
    Ocupație:
    Very comfortably early retired
    Locație:
    1029
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Isn't 7325 overhaul supposed to start in 2012, too?
     
  20. D1039

    D1039 Guest

    Michael, the last published list I saw (in 2009 and therefore dates suspect?) was:

    7325, from late 2011 completing in 2014
    46443, 2012 to 2014
    7802, 2015 to 2017
    7714, from 2010
    80079, starting 2016.

    "But just remember that these timings are the outline plan forecast to 2016 and are for the major overhauls and therefore finance and resource could alter the sequence".

    Patrick
     

Distribuie pagina asta