I cant be bothered to read thro 64 pages of posts but I do wonder if a deal could be made with HS2 to get the material to rebuild the missing...
Razed earth would by my favoured method, track gone(scrap or store), shed building gone(scrap or store) and concrete floors in the shed broken up.
Having finally got to the current end of this thread I am now so overwhelmed by the total shitfest and dodgy tactics for ulterior motives that I...
If it was my engine it would only reluctantly be on a cost per mile basis.
Or the boiler gets a fast track overhaul at somewhere like HBSS so the out of traffic time is short. That might even be done during the closed...
I was actually referring to volunteers, I will edit the post to remove confusion.
Personally if I was the S&DRT I would leave nothing behind except disturbed ground and ashes. If there was nowhere to put the sidings and...
I probably will never go there again.
I cant help but wonder how many of the volunteer loco staff might end up starting afresh by following 88 to her new home.
Looking on google earth an the Swanage railway there is what looks to be a quarry siding site I cant help wondering if that was available and...
Or to justify their job.
Thanks for that Bob. What prompted my question was that Polly models in their 'Practical Scale' range list tapered buffers as Collett and parallel...
When did the larger parallel stock buffers that seem to be on most GWR loco's in preservation come into use?
There was a 'What, Where, When' pic in steam railway some years ago of 92245 at Evercreech Jct.
Separate names with a comma.