But would they therefore pay to have some built ? better return /seat price than a mk 2. Having said that you can refit a mk3 paint it Nanking...
Think the only thing that might work would be to build some more Pullmans (pre mk1) Having said that there are probably still a few later models...
Thanks for this, its difficult to read but i love the whole idea/ process My rough calcs suggest that you will lose 2 tonnes coal capacity -...
Suppose if a new tender tank is required its an opportunity to bump up the water cap at the expense of coal... or will it be oil by the time we...
Please kindly watch this lovely but very sad piece from Hengist CME Geoff Turner... [MEDIA]
Sounds to me that just having Bittern at the same place SNG is helps all c0ncerned... bit of a bugger if you live in Yorks.
IIRC correctly getting individual Cam boxes ( as per BR caprotti) on top of the cylinders, especially the middle one was very problematic...
Greggs ?
Theres always the 'cant we use the cylinder x 3 design from tornado and rejig it a bit' option... would need to weld up that big hole on the...
Fitting Walshaerts gear to the existing P2 monobloc is not a casual thing, almost a start from scratch... if this is even a shadow in the minds...
Perhaps worth exchanging notes on material grades and propshafts/gears but not much else...
Surprised given how much work is required on P2 short term and planned maintenance for both plus the V4 ( if it happens) long, that it is...
Think LSL are well equipped to do the heavy lifting and dismantling SNG group well placed to assess the work required to overhaul and suggest/...
أفصل بين الأسماء بفاصلة.