If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

60009 UoSA

الموضوع في 'Steam Traction' بواسطة neildimmer, بتاريخ ‏13 مارس 2012.

  1. neildimmer

    neildimmer Resident of Nat Pres

    إنضم إلينا في:
    ‏6 جوان 2008
    المشاركات:
    9,078
    عدد المعجبين:
    1,126

    ACCORDING TO WIKIPEDIA

    as built a A4 & tender 165 Tons

    as built Duchess & tender 162 tons

    What they are nowadays i do not know

    60009 last at Scarborough 2008

    How do you find the weight limit of the bridge at York?

    Neil
     
  2. MarkinDurham

    MarkinDurham Well-Known Member

    إنضم إلينا في:
    ‏4 ماي 2007
    المشاركات:
    2,229
    عدد المعجبين:
    999
    مكان الإقامة:
    Durham
    It's more to do with axle loading than all-up weight, isn't it?

    Either way, if the Ouse bridge now has serious load limitations on it, then this has serious implications for flexibility of pool operations when looking at Scarborough bound trains.
     
  3. Fred Kerr

    Fred Kerr Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏24 مارس 2006
    المشاركات:
    8,383
    عدد المعجبين:
    5,368
    الجنس:
    ذكر
    الوظيفة:
    Freelance photo - journalist
    مكان الإقامة:
    Southport
    Notes from Ian Allan Combined Volume 1961/2

    A4 Loco weight = 102 tons 19 cwt; Duchess Loco only weight = 105 tons 5 cwt

    As noted by MarkinDurham the real limirt is the axle-load and that can be varied by spring adjustments. Needs a Network Rail person to identify current llimit and the currenmt operators to argue whether they can meet ity buy adjustments or expect Network Rail to spend money on strengthening it.
     
  4. Guest

    Guest Part of the furniture Account Suspended

    إنضم إلينا في:
    ‏8 سبتمبر 2005
    المشاركات:
    3,614
    عدد المعجبين:
    21
    الوظيفة:
    Occasional
    مكان الإقامة:
    G C & N S
    Its not a matter of expect Fred - Network Rail have a legal duty to keep the network in a condition capable of carrying the traffic offering at Vesting Date - 01/4/1994 or seeking an opt out under Network Change procedures

    If they haven't obtained a legal derogation then the user TOCs should be applying pressure to get them to comply with their obligations.
     
  5. acorb

    acorb Part of the furniture

    إنضم إلينا في:
    ‏17 جويلية 2007
    المشاركات:
    2,950
    عدد المعجبين:
    4,382
    مكان الإقامة:
    Powys
    And we still don't have any up to date info on number 9???
     
  6. J Shuttleworth

    J Shuttleworth Member

    إنضم إلينا في:
    ‏22 أوت 2009
    المشاركات:
    466
    عدد المعجبين:
    2,473
    Network Rail have dealt with this matter, via the Network Change procedure; they also advised, specifically, which locomotives can and cannot be used, until repairs are effected.

    JS
     
  7. neildimmer

    neildimmer Resident of Nat Pres

    إنضم إلينا في:
    ‏6 جوان 2008
    المشاركات:
    9,078
    عدد المعجبين:
    1,126

    Which locos are passed please James if it is ok to ask?

    Neil
     
  8. Steamage

    Steamage Part of the furniture

    إنضم إلينا في:
    ‏14 سبتمبر 2005
    المشاركات:
    4,749
    عدد المعجبين:
    1,123
    مكان الإقامة:
    Oxford
    Thanks James. By implication, then, it's a short-term problem. Any suggestion when the restriction will be lifted? Obviously not until after the summer season...

    Meanwhile, back at Crewe, no new news ;-)
     
  9. fifeflyer1957

    fifeflyer1957 New Member

    إنضم إلينا في:
    ‏9 إبريل 2012
    المشاركات:
    17
    عدد المعجبين:
    1
    الوظيفة:
    Logistics
    مكان الإقامة:
    Lymm
    All the pictures of the overhaul are on 60009 's "Facebook" do not quite know why they have not been posted on a public forum..........
    Anyway from what I have read, the boiler work has been completed, and a hydraulic test was scheduled for last / this week, followed by the statutory steam test.
    From the pictures the wheels are back on the chassis, with the con rods back in place, she has had a new smoke box fabricated, and looks like the tender is all but complete.
    So I would suggest that all things being equal wont be long before we hear the chime whistle again !
     
  10. kieranhardy

    kieranhardy Well-Known Member

    إنضم إلينا في:
    ‏8 جوان 2006
    المشاركات:
    1,603
    عدد المعجبين:
    870
    الجنس:
    ذكر
    مكان الإقامة:
    Kidderminster
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Surely if you are going by the facebook group and unless there is more than one this is the latest news posted yesterday:

    '60009 has passed her hydraulic test and steam testing will begin next week which is brilliant news!'
     
  11. fifeflyer1957

    fifeflyer1957 New Member

    إنضم إلينا في:
    ‏9 إبريل 2012
    المشاركات:
    17
    عدد المعجبين:
    1
    الوظيفة:
    Logistics
    مكان الإقامة:
    Lymm
    Simple response Kieran, I was aware of the "facebook" for number 9, however not every one participates in social network sites such as facebook, by chance my daughter was using face book, and I asked her to check out No9, and found the status so far.....
     
  12. JLTCorporation

    JLTCorporation New Member

    إنضم إلينا في:
    ‏10 جويلية 2010
    المشاركات:
    98
    عدد المعجبين:
    0
    Union of South Africa - 29/07/2012 - In 3D (Also includes some footage from her last movement in 2009)

    [video=youtube;kf135UziZ3E]http://www.youtube.com/watch?v=kf135UziZ3E[/video]
     

مشاركة هذه الصفحة