If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Flying Scotsman

Discuție în 'Steam Traction' creată de 73129, 24 Aug 2010.

  1. 26D_M

    26D_M Part of the furniture

    Înscris:
    22 Oct 2009
    Mesaje:
    4.416
    Aprecieri primite:
    1.681
    Very much so Alan, that was the context of my post. It was commercially and publicity wise very successful. The operational constraints were managed as well as possible too by ELR, coping very well with trial steaming opened up to public viewing. ELR also seemed to create a positive impression as the host of NRMs publicity junket.
    From an entirely personal view it was only regrettable not to have been the full launch of the finished loco. ELR deserved that opportunity IMHO, but I'm biased!
     
  2. Swiss Toni

    Swiss Toni Well-Known Member

    Înscris:
    9 Noi 2008
    Mesaje:
    1.961
    Aprecieri primite:
    3.664
    Locație:
    Switzshire
    But it wasn't supposed to be a "standard gala" was it?

    The whole thing was unprofessional and poorly presented....IMO!
     
    Last edited: 20 Ian 2016
  3. Spamcan81

    Spamcan81 Nat Pres stalwart

    Înscris:
    25 Aug 2007
    Mesaje:
    35.834
    Aprecieri primite:
    22.272
    Ocupație:
    Training moles
    Locație:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It was a gala and galas have a habit to throwing curve balls at the organisers. We're talking machinery here and even the best prepared bit of kit can go wrong.
    Going by what others have said here and elsewhere, you seem to be in a minority with your opinion.
    Oh and by "standard" I was not implying that the gala was a standard one but that such problems often happen at special events.
    Presume you'll be offering to organise the next one for the ELR.
     
    Last edited: 20 Ian 2016
    pjr, GHWood, andalfi1 și încă o persoană apreciază asta.
  4. MarkinDurham

    MarkinDurham Well-Known Member

    Înscris:
    4 Mai 2007
    Mesaje:
    2.229
    Aprecieri primite:
    999
    Locație:
    Durham
    Absolutely the right decision made. It was always going to be a close run thing, and much kudos to Ian Riley and his team for getting the old girl as far as they have so far, given all that has been required to be done.
     
  5. Swiss Toni

    Swiss Toni Well-Known Member

    Înscris:
    9 Noi 2008
    Mesaje:
    1.961
    Aprecieri primite:
    3.664
    Locație:
    Switzshire
    The re launch of the most iconic steam locomotive in the world and all it got was a rush job!
     
  6. henrywinskill

    henrywinskill Well-Known Member

    Înscris:
    3 Noi 2005
    Mesaje:
    2.345
    Aprecieri primite:
    3.660
    Ocupație:
    Transgender toilet attendant
    Locație:
    North East
    Heritage Railway Volunteer:
    No I do not currently volunteer
     
    bryemycaz și class8mikado apreciază asta.
  7. mrKnowwun

    mrKnowwun Part of the furniture

    Înscris:
    22 Oct 2011
    Mesaje:
    4.366
    Aprecieri primite:
    2.823
    Ocupație:
    Retired
    Locație:
    West Byfleet
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think you are looking at this the wrong way. They were very clever with the ELR runs, it was shown in a deliberately unfinished and unnamed state. Much was made of its "this is a test" status and in the process sharing its rebirth with the public. This way hicups were expected and added to the " this real life testing you are part of folks"

    The timing of this weekend run was however in my view an unacceptable risk, undoing much of the previously well done PR
     
  8. 26D_M

    26D_M Part of the furniture

    Înscris:
    22 Oct 2009
    Mesaje:
    4.416
    Aprecieri primite:
    1.681
    That's an entirely different issue, don't blame ELR, it didn't set the deadlines! Those were the dates given to ELR to work with by the project management. Likewise ELR had to work with the loco in the state presented to them ie very much under test. It was that or nowt.
     
  9. billbedford

    billbedford Member Friend

    Înscris:
    25 Feb 2015
    Mesaje:
    302
    Aprecieri primite:
    336
    Sex:
    Masculin
    Ocupație:
    retired
    Locație:
    bedford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    So after all your criticism did you ask for a refund of your ticket price ? ;)
     
  10. Spamcan81

    Spamcan81 Nat Pres stalwart

    Înscris:
    25 Aug 2007
    Mesaje:
    35.834
    Aprecieri primite:
    22.272
    Ocupație:
    Training moles
    Locație:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    All good points. As I see it, 60103 worked ELR trains on the dates she was advertised to. Nobody promised her in green, nobody promised that one of the more reliable steam locos in the shape of 45407 wouldn't fail, in fact nobody promised that there wouldn't be any problems at all. If Swiss Toni bought a ticket then I suggest he makes his complaints to the ELR and asks for a refund. If he was simply on the line side taking photographs, tough. Sh!t happens.
     
    pjr și andalfi1 apreciază asta.
  11. BillyReopening

    BillyReopening Member

    Înscris:
    17 Sep 2012
    Mesaje:
    830
    Aprecieri primite:
    581
    Sex:
    Masculin
    Ocupație:
    Freelance Trumpet Player // IT Engineer
    Locație:
    South West
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The Level of whinging from some people is astounding! It was a paid test run, nobody can complain, it steamed and sounded great! Its a preserved railway without the resources to handle all those people - so a bit of disorganisation was to be expected. The 23rd tour was marketed as "FS might not be available" - The fact that the overhaul has been done and its in steam is pretty astounding given the current climate! Lets all look forward to her first tour and say a big thank you to those at Riley Engineering who have overhauled FS and are probably working damn hard to get through a fairly extensive snagging list. Its not like you can pop out and have a look at another A3 and see how it works is it?!
     
    middy, GHWood, tractionenginedriver și alți 4 apreciază asta.
  12. BillyReopening

    BillyReopening Member

    Înscris:
    17 Sep 2012
    Mesaje:
    830
    Aprecieri primite:
    581
    Sex:
    Masculin
    Ocupație:
    Freelance Trumpet Player // IT Engineer
    Locație:
    South West
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Swiss, half the things you posted here are just to wind people up....Step back to your armchair :) :)
     
    Shep Woolley apreciază asta.
  13. andalfi1

    andalfi1 Well-Known Member

    Înscris:
    5 Noi 2008
    Mesaje:
    1.007
    Aprecieri primite:
    466
    Sex:
    Masculin
    Ocupație:
    Semi Retired.
    Locație:
    Haworth
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Shhhh, I love it when he's controversial...;)
     
  14. MikeParkin65

    MikeParkin65 Member Friend

    Înscris:
    1 Iul 2007
    Mesaje:
    610
    Aprecieri primite:
    686
    Sex:
    Masculin
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Wasn't aware 4468 had returned to steam
     
    Adam-Box apreciază asta.
  15. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    Înscris:
    30 Mai 2009
    Mesaje:
    22.591
    Aprecieri primite:
    22.721
    Locație:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Can't think when you have ever been a) wrong or b) uncharitable but you clearly have a bee in your bonnet over the ELR weekend. Maybe it was a case of snow on the lens as we've not benefited from you sharing any of your usually fine images from the event. This was a running in/loco testing event that the ELR was happy to host. Nothing more, nothing less and it seems as though the event allowed the Riley team to identify the fine tuning necessary before FS could go on a main line trial. All pretty sensible to my mind.
     
    YorkyLad, mike1522 și Shep Woolley apreciază asta.
  16. martin1656

    martin1656 Nat Pres stalwart Friend

    Înscris:
    8 Dec 2014
    Mesaje:
    19.264
    Aprecieri primite:
    12.516
    Sex:
    Masculin
    Locație:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think advertising the engine on a ain line tour only 1 week after her second running in date was being to optimistic the 2nd of Feb, seems a more sensible option, and the tour operator was clear, she may not make it, as far as i'm concerned, it it needs longer to sort out issues, it has to have it, simples,
    it will be ready when its ready is the only truthful answer, thats the only way it can be.
     
  17. Swiss Toni

    Swiss Toni Well-Known Member

    Înscris:
    9 Noi 2008
    Mesaje:
    1.961
    Aprecieri primite:
    3.664
    Locație:
    Switzshire
    To be continued...........when I get to a proper keyboard and not this touch screen rubbish!
     
  18. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    Înscris:
    15 Apr 2006
    Mesaje:
    16.551
    Aprecieri primite:
    7.897
    Locație:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    4014 hasn't ... yet :)
     
    mike1522 apreciază asta.
  19. guycarr360

    guycarr360 Part of the furniture

    Înscris:
    4 Oct 2005
    Mesaje:
    4.834
    Aprecieri primite:
    3.159
    Sex:
    Masculin
    Locație:
    Chester le Street County Durham
    What would we rather have :-

    1. The possibility of a high profile sit down on the mainline, with all the chaos that ensues, I am sure WCRC don't want that either, or...

    2. Wait for the job to be completed to the satisfaction of IRE and all the technical bodies etc..., and then released without any niggles, or possibility of an issue.

    In view of the current situation with WCRC, I am sure that (2) would always be the best option, and in fact the ONLY one.

    Its a shame for those on board, however, they would no doubt complain if (1) was tried, even though it should not come into the equation.

    As for those at lineside, those on board are paying for your free show, maybe have a think about them......
     
  20. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    Înscris:
    31 Aug 2010
    Mesaje:
    5.615
    Aprecieri primite:
    9.418
    Sex:
    Masculin
    Ocupație:
    Asset Engineer (Signalling), MNLPS Treasurer
    Locație:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I know we're all allowed opinions, but it is immeasurably wearying to read such off hand diatribe, after waiting ten years to see Flying Scotsman in steam.

    I was happiest seeing the number of people - general public and enthusiasts alike - going to see the engine. I wasn't able to go due to work so I felt as though I was living through the experience of others. Thanks to all who've shared their experiences and excellent photography, btw.

    I'm trying to figure out why exactly Swiss Toni feels the need to be so negative.

    1) things go wrong at galas - name me one gala at any railway where something doesn't go wrong in some form
    2) an engine fails - it's a fact of life in preserved railways. Scotsman herself did not fail - the pump did and they found a way around that. Excellent work all round.
    3) timetable - who here has known a gala keep to a timetable exactly? We're not talking about passengers services which are guaranteed. All of the trains Scotsman was due to pull did run, didn't they? If they did then what's the problem?

    Just feels a bit like an excuse to find a negative to beat the NRM and Ian Riley over the head with, and it doesn't seem fair, reasonable or consistent by my ombudsman's standards quite frankly.
     
    pjr apreciază asta.

Distribuie pagina asta