If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Last 4-REP Scrapped?

الموضوع في 'Diesel & Electric Traction' بواسطة SR.Keoghoe, بتاريخ ‏13 جويلية 2015.

  1. buzby2

    buzby2 Well-Known Member

    إنضم إلينا في:
    ‏26 مارس 2009
    المشاركات:
    1,735
    عدد المعجبين:
    603
    مكان الإقامة:
    Swanage
    https://www.national-preservation.com/threads/cathedral-express-23rd-may.18582/
    Entries #13 & #14 relate to 60009's exploits referred to above.
     
  2. johnnew

    johnnew Member

    إنضم إلينا في:
    ‏2 نوفمبر 2007
    المشاركات:
    656
    عدد المعجبين:
    124
    الوظيفة:
    PRO The Stephenson Locomotive Soc.
    مكان الإقامة:
    Dorset, UK
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Saw them come in on the SW mainline and later after I moved back to Dorset. Most sensible idea BR had was the REP/TC Cl 33 idea which should have been extended to other electric/diesel routes. Example that comes to mind is splitting ECML sets for Glasgow and Aberdeen portions at Waverley rather than running diesel under the wires all the way south to/from Kings X.

    Agree lively at Micheldever, regulars knew when to avoid a coffee spill.

    Heard of the 8 REP runs also. Same horsepower as a Deltic?




    Sent from my iPad using Tapatalk
     
  3. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    إنضم إلينا في:
    ‏15 إبريل 2006
    المشاركات:
    16,553
    عدد المعجبين:
    7,905
    مكان الإقامة:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A single 4-REP had 3200 hp installed, so was not far off a Deltic on its own.
     
  4. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,634
    عدد المعجبين:
    12,751
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Put it this way, even with a single 4tc up front the units were very fast out of the stops i can still remember looking at the speedo through the corridoor cab door on one day trip to Swanage, in the early days , when they only had a mile of track ;) between basingstoke and Southampton to see it hard against the screw:eek:, it was a rather lively run, we were late leaving Woking, so the driver was going for it :) we arrived at Bournemouth right time, the 33 came on, got as far as the next station and died i never did get to Swanage :(
     

مشاركة هذه الصفحة