Project Wareham

Discuție în 'Heritage Railways & Centres in the UK' creată de David R, 31 Iul 2015.

  1. David R

    David R Well-Known Member

    Înscris:
    30 Iul 2013
    Mesaje:
    1.019
    Aprecieri primite:
    1.390
    Sex:
    Masculin
    Locație:
    Surrey
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Would be good to start a thread about this

    Attached link may be of interest

    https://www.dorsetforyou.com/media/183848/Business-Plan/pdf/PCRPBusinessPlan2013_v1_April_.pdf

    Any news from anyone else?

    David R
     
  2. David R

    David R Well-Known Member

    Înscris:
    30 Iul 2013
    Mesaje:
    1.019
    Aprecieri primite:
    1.390
    Sex:
    Masculin
    Locație:
    Surrey
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    athelney apreciază asta.
  3. David R

    David R Well-Known Member

    Înscris:
    30 Iul 2013
    Mesaje:
    1.019
    Aprecieri primite:
    1.390
    Sex:
    Masculin
    Locație:
    Surrey
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  4. David R

    David R Well-Known Member

    Înscris:
    30 Iul 2013
    Mesaje:
    1.019
    Aprecieri primite:
    1.390
    Sex:
    Masculin
    Locație:
    Surrey
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  5. huochemi

    huochemi Part of the furniture

    Înscris:
    6 Mai 2008
    Mesaje:
    3.002
    Aprecieri primite:
    1.521
    Sex:
    Masculin
    Locație:
    UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks. What is a "road rail interchange"? A park and ride?
     
  6. H F Stephens

    H F Stephens New Member

    Înscris:
    3 Mai 2008
    Mesaje:
    8
    Aprecieri primite:
    2
    No, it's a level crossing!
     
  7. howard

    howard Member

    Înscris:
    28 Iul 2006
    Mesaje:
    306
    Aprecieri primite:
    270
    Sex:
    Masculin
    Ocupație:
    Retired Ship's Engineer
    Locație:
    Sandwich Kent
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Isn't it where P/Way put their road/rail equipment on and off the line?
     
  8. HerstonHalt

    HerstonHalt Member

    Înscris:
    27 Apr 2009
    Mesaje:
    255
    Aprecieri primite:
    169
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Its the area where guest locos arriving by road vehicles are unloaded onto SR metals. It was on the right as you approached Norden Gates crossing, before you crossed the line (ie on the Swanage side of the approach road).. The new one will be diagonally opposite, on the left hand (Wareham) side just after the crossing.
     
  9. twr12

    twr12 Well-Known Member

    Înscris:
    2 Sep 2007
    Mesaje:
    1.659
    Aprecieri primite:
    821
    Colloquially known as a Pad!
     
  10. Greenway

    Greenway Part of the furniture

    Înscris:
    16 Mar 2008
    Mesaje:
    4.019
    Aprecieri primite:
    3.804
    Sex:
    Masculin
    Locație:
    South Hams
    Heritage Railway Volunteer:
    No I do not currently volunteer
    My view is that the description park and ride is far more apposite than 'level crossing'.
     
  11. Rumpole

    Rumpole Part of the furniture

    Înscris:
    17 Dec 2005
    Mesaje:
    2.605
    Aprecieri primite:
    890
    Ocupație:
    Tea-Maker
    Locație:
    34105
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As Herston Halt says, what will be referred to as the Road Rail Interchange is where rail vehicles are loaded and unloaded from road vehicles. The dig for the new RRI is now in full swing, with 10 trainloads of spoil taken up to Embankment 4 (each trainload comprising 3 Sea Urchins) today, following yesterday's 8 trainloads; estimated timescale for the digging works is 2 weeks.
     
    jnc și David R apreciază asta.
  12. huochemi

    huochemi Part of the furniture

    Înscris:
    6 Mai 2008
    Mesaje:
    3.002
    Aprecieri primite:
    1.521
    Sex:
    Masculin
    Locație:
    UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thank you. So is the RRI part of the Wareham Project (and if so, why?) or is it coincidental?
     
  13. David R

    David R Well-Known Member

    Înscris:
    30 Iul 2013
    Mesaje:
    1.019
    Aprecieri primite:
    1.390
    Sex:
    Masculin
    Locație:
    Surrey
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Because the existing RRI at Norden will be blocked by the new barriers for the new Level Crossing at Norden.

    The Level Crossing is required for Wareham trains to proceed north of Norden - a present, trains are flagged by hand accross the road

    David R
     
    Last edited: 16 Sep 2015
  14. David R

    David R Well-Known Member

    Înscris:
    30 Iul 2013
    Mesaje:
    1.019
    Aprecieri primite:
    1.390
    Sex:
    Masculin
    Locație:
    Surrey
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  15. steve45110

    steve45110 Member

    Înscris:
    10 Sep 2005
    Mesaje:
    309
    Aprecieri primite:
    45
    Sex:
    Masculin
    Are there any plans for Wareham yet?
    1 Will the up bay be re-opened? A junction box has recently been helpfully plonked on the trackbed, complete with new steps down to it.
    2 Will the signalbox be taken over by SR or, demolished, as Wool has been?
    3 Will their be a buffet at Wareham? If there is no space in the buildings, a coach could be placed in the bay.
    4 Will the water tank at the west end of the down platform be rebuilt, as a water supply for a reinstated column for locos?
    5 Will the sidings in the old goods yard be used for stabling stock?
     
    oliversbest apreciază asta.
  16. David R

    David R Well-Known Member

    Înscris:
    30 Iul 2013
    Mesaje:
    1.019
    Aprecieri primite:
    1.390
    Sex:
    Masculin
    Locație:
    Surrey
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    1 I beleive trackbed resverved but no plans to re-open
    2 Signalbox already leased to SR, I Believe
    3 Don't know
    4 No
    5 No - only the down sidings used to turnround DMU (so stabled there between arriving and departing)

    To expand on 5 - I beleive that DMU will travel up the down line from Worgret, crossover into the up platform at Wareham, depart in the up direction and crossover to the down line and into the down sidings, stable, then depart from the down sidings into the down platform and back down the down line to Worgret and Swanage.

    David R
     
  17. Steve1015

    Steve1015 Member

    Înscris:
    26 Mai 2011
    Mesaje:
    902
    Aprecieri primite:
    268
    Sex:
    Masculin
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The DMU will not be able to access the downsidings until after the new footbridge is built and the footpath closed. In the mean time if the service starts before the bridge is built they will terminate/start in the down platform
     
  18. steve45110

    steve45110 Member

    Înscris:
    10 Sep 2005
    Mesaje:
    309
    Aprecieri primite:
    45
    Sex:
    Masculin
    Unusual. Why is the DMU different from the regular EMU's, that use the crossing every half an hour?
     
  19. David R

    David R Well-Known Member

    Înscris:
    30 Iul 2013
    Mesaje:
    1.019
    Aprecieri primite:
    1.390
    Sex:
    Masculin
    Locație:
    Surrey
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I beleive it may be to do with the new up to down crossover which enables access to the down sidings and as it is close to the crossing cannot be commissioned until the crossing is closed

    David R
     
    Last edited: 17 Sep 2015
  20. Steve1015

    Steve1015 Member

    Înscris:
    26 Mai 2011
    Mesaje:
    902
    Aprecieri primite:
    268
    Sex:
    Masculin
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Its because the shunt signals into/out of sidings are not interlocked with the warning lights on the footpath.
     