If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

6023

Dieses Thema im Forum 'Steam Traction' wurde von Eightpot gestartet, 4 Oktober 2011.

  1. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    Registriert seit:
    30 Mai 2009
    Beiträge:
    22.589
    Zustimmungen:
    22.717
    Ort:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    This is just a polite message to remind everyone that this thread is primarily about 6023 and its activities. Whilst the specific difficulty with clearances on the Network is a legitimate concern with 6023, there is a separate thread for all matters concerning gauging as other locomotives are also affected. This thread is at:

    https://www.national-preservation.com/threads/network-rail-gauging-issues.33109/page-6
     
  2. Ray Coldwell

    Ray Coldwell New Member

    Registriert seit:
    27 April 2013
    Beiträge:
    4
    Zustimmungen:
    19
    Geschlecht:
    männlich
    Apologies if my contribution yesterday should have been on the Network Rail Gauging page. It was not meant to be.

    I understand it has since been moved to the said alternative page, However, I felt compelled to write specifically for the 6023 King group.

    The impact of improper track programmes with ballast packing and platform matters (amongst many) is hugely retrograde for 6023, together with many other locomotives now, and the railways of the future. The King has been radically altered to comply with short-sighted and ill-thought out loading gauge constraints. These alterations to 6023 are in vain unless strict control of mainline permanent way maintenance matters are to be consistent and enforced by Network Rail. Contractor work needs to be strictly supervised and monitored as often it is non-sanctioned minor deviations that create issues for locomotives like 6023.

    The malpractices must be addressed. The unthinkable costs and frustrations for those who have worked so very hard on 6023 to meet the mandatory criteria, should not have to endure regulations which change with the 'slightest breeze'.

    There is no doubt that matters will come to a head. The problems faced by 6023 look set to reach the headlines due to significant issues affecting the new rolling stock sets to be introduced by First Great Western. Hopefully, this may be the catalyst that resolves matters for 6023 and ensures that permanent way clearances and maintenance regimes revert to standards that have been successfully proven for decades. An examination of former mainline stalwart 6000 demonstrates how matters have radically restricted clearances over a very short time. 6023 should be expected to have no problems in mainline running opportunities whatsoever and this must be ensured.

    R Coldwell (Chartered Surveyor)
     
  3. Enterprise

    Enterprise Part of the furniture

    Registriert seit:
    9 September 2005
    Beiträge:
    5.472
    Zustimmungen:
    3.302
    I didn't write that one should not try to stop idiots killing or injuring themselves. That is a different discussion.
     
    Last edited: 7 Oktober 2017
  4. Hermod

    Hermod Well-Known Member

    Registriert seit:
    6 Mai 2017
    Beiträge:
    1.109
    Zustimmungen:
    317
    Geschlecht:
    männlich
    Ort:
    Klitmoeller,Denmark
    Heritage Railway Volunteer:
    No I do not currently volunteer
    My memory was wrong
    NS ordered 15 three cylindered 4-6-0

    http://www.nicospilt.com/scans/stoom/4001.JPG

    and 35 threecylindered 0-8-0

    http://www.scaletrading.nl/philotrain/images/870-38-3 NS 4719 (6).jpg

    http://www.nicospilt.com/scans/ZG1.JPG.

    Not developments of fourcylinder inside valve gear from former dutch engines.
    By the way I think 50 of the 4-8-0 would have been a smarter buy.They were fast enough.

    GWR locomotives have always been to big on some other british railways that did not recognize that 7 feet was the best rail gauge.My gues is that B12 will be one of the last mainline allowed six coupled steam locomotives in England
     
    Last edited: 7 Oktober 2017
  5. John Petley

    John Petley Part of the furniture

    Registriert seit:
    8 Oktober 2007
    Beiträge:
    2.947
    Zustimmungen:
    2.524
    Geschlecht:
    männlich
    Beruf:
    Researcher/writer and composer of classical music
    Ort:
    Between LBSCR 221 and LBSCR 227
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    My reading of the article in Steam Railway was that Network Rail were liaising directly with the GWS to try and work out a way forward if at all possible, which is quite unusual, while Mr Croucher of the GWS said that he doesn't give up easily, so both sides seem to be doing all they can in the hope that some main line running will be possible, albeit probably only on a restricted number of routes. It doesn't sound like all is lost - yet. One can therefore only hope that, after all the effort in bringing a real no-hoper back from scrapyard condition, that it will not prove to have been in vain as afar as main line running is concerned.
     
    Ray Coldwell gefällt dies.
  6. staffordian

    staffordian Well-Known Member

    Registriert seit:
    27 März 2012
    Beiträge:
    1.524
    Zustimmungen:
    2.172
    Geschlecht:
    männlich
    Beruf:
    Retired
    Ort:
    The Potteries
    Heritage Railway Volunteer:
    No I do not currently volunteer
    And what could be more true to the past than a King only being allowed on a very restricted number of routes :)
     
    jnc, steamvideosnet, Bill Drewett und 2 anderen gefällt dies.
  7. Midland Red

    Midland Red New Member

    Registriert seit:
    11 April 2006
    Beiträge:
    152
    Zustimmungen:
    23
    Ort:
    Staffs
    A side view of the outside cylinder casing looks no different from the previous 'wide' cylinder. The loco head-on view still has the cylinder casing just outside the edge of the running board - only rivet-counters will spot the difference!!
     
    Seagullman und springers gefällt dies.
  8. Matt37401

    Matt37401 Nat Pres stalwart

    Registriert seit:
    8 Juni 2014
    Beiträge:
    15.551
    Zustimmungen:
    11.955
    Ort:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Slightly worrying though it won't be allowed to work from Paddington to either Plymouth or Wolverhampton!
     
    Bill Drewett und staffordian gefällt dies.
  9. Chris86

    Chris86 Well-Known Member

    Registriert seit:
    31 Oktober 2011
    Beiträge:
    1.575
    Zustimmungen:
    1.782
    Beruf:
    Safety, technical and vehicle trainer
    Ort:
    South Yorkshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    You have got to feel for the 6023/Didcot guys, its been a long drawn out process to get 6023 this far and it would be a crying shame if what was once a 'project impossible' job didn't make it onto the main line.

    I really, really hope that the issues can be resolved and that they don't have to go down the route of 6024 with new cylinders to realise their aim.

    If anyone from Didcot happens to read this- best of luck to you all!

    Chris
     
  10. Jimc

    Jimc Part of the furniture

    Registriert seit:
    8 September 2005
    Beiträge:
    4.117
    Zustimmungen:
    4.821
    Beruf:
    Once computers, now part time writer I suppose.
    Ort:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I strongly suspect that the GWR loading gauge was very little to do with the broad gauge. Something like half the GWR route mileage never had any broad gauge track on, and all the problematic numbers are really about the distances from the platform to the nearest rail, which must have been pretty much the same for broad gauge and narrow gauge, since they used a common rail.
     
    Jamessquared gefällt dies.
  11. Hermod

    Hermod Well-Known Member

    Registriert seit:
    6 Mai 2017
    Beiträge:
    1.109
    Zustimmungen:
    317
    Geschlecht:
    männlich
    Ort:
    Klitmoeller,Denmark
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Steam locomotives 2017 is a virtual world anyway .
    Take some angle grinders to Settle- Carisle and cut platforms edges 1 or 2 inches back.
    A calibrated dynamometer car and 20 period looking cars.
    Less outlay than a Disney world and comparable joy and income.
    This is more or less the formula behind Harzquerbahn(alive and steam)
     
    R.W. Grant gefällt dies.
  12. JJG Koopmans

    JJG Koopmans Member

    Registriert seit:
    12 November 2014
    Beiträge:
    382
    Zustimmungen:
    474
    Geschlecht:
    männlich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    In the last issue of the Journal of the Stephenson Locomotive Society (sept/oct 2017) appeared an article from me: “On the Calculation of Front-end performance”. It is my version of the exhaust momentum equation with theoretical deduction and numerical proof from the majority of the Rugby test data. It was my intention to publish this as the last one of three articles on single orifice chimney behavior, multi orifice chimney behavior and finally the momentum theory. All of this should be published after the velocity tests of GWR 6023 so that its front-end behavior was fully explained. However, the loading gauge problems have made a mess of the timing , so it is my intention to post the first two articles shortly in the appropriate section with heading ”Locomotive Front End Designs”. Since the King has not given trouble at low speeds, unlike some other multiple exhaust systems, and has run at 40 mph max. to Paddington and back, I think it is save to do so.
    Please bear with me, I have to prepare some graphs to go with them and have to learn again how to post those.
    Kind regards
    Jos Koopmans
     
    Penricecastle, Copper-capped und maddog gefällt dies.
  13. AlexGWR1994

    AlexGWR1994 Member

    Registriert seit:
    2 März 2015
    Beiträge:
    452
    Zustimmungen:
    1.513
    Geschlecht:
    männlich
    Ort:
    Bristol
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The 6023 website has got some encouraging news for you guys -

    'December 2017 - 6023 is nearing completion for main line running. The engine has been gauged accurately, the new blastpipe runs better than expected, axle weights have been set, and she rode exceptionally well on the trips to and from Old Oak Common, via Paddington, although a couple of small defects did become apparent both during the trips and then examined back on shed at Didcot Railway Centre. Coal economy looks to have improved significantly and all the electronics now function correctly and just need certifying.The next major step is testing the steaming capabilities under loaded conditions, which we hope will take place at the SVR in the New Year.' :)
     
    and60007, sunstream, andalfi1 und 21 anderen gefällt dies.
  14. JJG Koopmans

    JJG Koopmans Member

    Registriert seit:
    12 November 2014
    Beiträge:
    382
    Zustimmungen:
    474
    Geschlecht:
    männlich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The "new blastpipe runs better" and and improved coal economy are of course both consequences of the change to a fourfold orifice
    and were predicted during the design process. I am looking forward to the test runs (hopefully my pound coins and notes will still be valid;)).
    Kind regards
    Jos Koopmans
     
    andalfi1, g8bvl, John Petley und 2 anderen gefällt dies.
  15. Chris86

    Chris86 Well-Known Member

    Registriert seit:
    31 Oktober 2011
    Beiträge:
    1.575
    Zustimmungen:
    1.782
    Beruf:
    Safety, technical and vehicle trainer
    Ort:
    South Yorkshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Great news.

    Can't wait to see the King working to its full potential.

    Chris
     
  16. ruddingtonrsh56

    ruddingtonrsh56 Well-Known Member

    Registriert seit:
    14 September 2009
    Beiträge:
    1.180
    Zustimmungen:
    1.812
    Geschlecht:
    männlich
    Ort:
    Nottinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Anybody know how long the loco will be at the SVR for? I don't suppose there's a chance she'll be sticking around long enough to be a surprise extra addition to the spring steam gala?
     
  17. eggbert

    eggbert Member

    Registriert seit:
    10 Mai 2011
    Beiträge:
    276
    Zustimmungen:
    159
    Beruf:
    IT
    Ort:
    Gloucestershire
    Great news, things sounded very glum a few months ago but now this really could be a Christmas present worth waiting for.
     
    andalfi1 und sir gilbert claughton gefällt dies.
  18. R.W. Grant

    R.W. Grant New Member

    Registriert seit:
    26 November 2016
    Beiträge:
    73
    Zustimmungen:
    63
    Geschlecht:
    männlich
    Beruf:
    Retired machinist
    Ort:
    north central Pennsylvania usa
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Shame such a fine example of British locomotive engineering after being virtually brought back from the dead is still struggling for survival! A plinth somewhere would be a bleak future for a grand machine as this King class. Too many "nuts" have been busted and money spent for that. I truly hope she can roll those big drivers on High Iron at high speed. I will never get to see her in person but will relish any videos of her doing her thing! Best of luck to all involved in bringing the King back to life. Please keep this thread updated.
     
    andalfi1 und Copper-capped gefällt dies.
  19. martin1656

    martin1656 Nat Pres stalwart Friend

    Registriert seit:
    8 Dezember 2014
    Beiträge:
    19.263
    Zustimmungen:
    12.514
    Geschlecht:
    männlich
    Ort:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    How long has she got left though on her current ticket ? and can Didcot afford a boiler overhaul, but i would think as its had so little use that your most likily looking at just a retube and re ending of the flue tubes , might it be a very short mainline return for 6023 then another overhaul ?
     
  20. GWR Man.

    GWR Man. Well-Known Member

    Registriert seit:
    8 Oktober 2014
    Beiträge:
    2.259
    Zustimmungen:
    2.695
    Geschlecht:
    männlich
    Ort:
    Taunton
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Her mainline 7 year ticket from first boiler steam test was up 12 April 2017, so must be on a new one or has been extended.
     

Die Seite empfehlen