If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Saphos Trains 'Golden Arrow' - 26/10/19

الموضوع في 'What's Going On' بواسطة jackshepherd, بتاريخ ‏31 جويلية 2019.

  1. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    إنضم إلينا في:
    ‏11 سبتمبر 2005
    المشاركات:
    36,450
    عدد المعجبين:
    9,911
    الجنس:
    ذكر
    الوظيفة:
    Retired-ish, Part time rail tour steward.
    مكان الإقامة:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Did she slip to a stand or stall?
     
  2. Deepgreen

    Deepgreen Well-Known Member Friend

    إنضم إلينا في:
    ‏30 جويلية 2010
    المشاركات:
    2,099
    عدد المعجبين:
    1,403
    الجنس:
    ذكر
    الوظيفة:
    Early retirement! (Ex-Business Improvement, LU).
    مكان الإقامة:
    Gomshall, Surrey
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The Mk2s are several tons heavier on average than Mk1s.
     
  3. Deepgreen

    Deepgreen Well-Known Member Friend

    إنضم إلينا في:
    ‏30 جويلية 2010
    المشاركات:
    2,099
    عدد المعجبين:
    1,403
    الجنس:
    ذكر
    الوظيفة:
    Early retirement! (Ex-Business Improvement, LU).
    مكان الإقامة:
    Gomshall, Surrey
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Hand-sanding makes no difference to a stall, which occurs when adhesion isn't lost, but the power available is not enough to overcome gravity and friction.
     
  4. GWR4707

    GWR4707 Nat Pres stalwart

    إنضم إلينا في:
    ‏12 ماي 2006
    المشاركات:
    19,237
    عدد المعجبين:
    17,567
    الجنس:
    ذكر
    مكان الإقامة:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I am really not sure how the buck for this can be laid at NR's door. I imagine they are not awash with steam specialists and depend upon the specialist toc's who run steam to propose routes and loads which are appropriate!?

    P.s as I have been avoiding NP I only picked this up via Google alerts, in light of it being the Golden Arrow a lot of the news stories seem to be being illustrated with Tangmere in full GA paraphernalia as I assume that's what is showing up for journalists googling trying to illustrate their stories. Poor old Tangers, whilst she has had her moments she is getting the blame when its nowt to do with her!


    Sent from my SM-J330FN using Tapatalk
     
  5. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    إنضم إلينا في:
    ‏11 سبتمبر 2005
    المشاركات:
    36,450
    عدد المعجبين:
    9,911
    الجنس:
    ذكر
    الوظيفة:
    Retired-ish, Part time rail tour steward.
    مكان الإقامة:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I am aware of the difference having experienced both, on different occasions, first hand from the footplate on Miles Platting.
     
  6. Dan Hamblin

    Dan Hamblin Part of the furniture

    إنضم إلينا في:
    ‏27 مارس 2006
    المشاركات:
    2,549
    عدد المعجبين:
    190
    الوظيفة:
    Rolling Stock Engineer
    مكان الإقامة:
    Kent
    Has it left Canterbury yet?

    Regards,

    Dan
     
  7. Deepgreen

    Deepgreen Well-Known Member Friend

    إنضم إلينا في:
    ‏30 جويلية 2010
    المشاركات:
    2,099
    عدد المعجبين:
    1,403
    الجنس:
    ذكر
    الوظيفة:
    Early retirement! (Ex-Business Improvement, LU).
    مكان الإقامة:
    Gomshall, Surrey
    Heritage Railway Volunteer:
    No I do not currently volunteer
    NR has the final say over what can run where and when - it's that simple. They have clearly-defined maximum unassisted loads for the various power classifications of locos on specific routes. They are duty-bound only to approve workings which meet all the criteria laid down. It doesn't matter what a TOC may bring to them for approval to run - the rules are stringent, and they are there exactly so that people don't need to be steam experts; they just need to be able to read.
     
  8. Bulleid Pacific

    Bulleid Pacific Part of the furniture

    إنضم إلينا في:
    ‏14 إبريل 2007
    المشاركات:
    4,030
    عدد المعجبين:
    1,089
    الوظيفة:
    A Thingy...
    Still at sunny Canterbury. Not the best trip I've ever been on.
     
  9. Phil K

    Phil K Member

    إنضم إلينا في:
    ‏8 سبتمبر 2005
    المشاركات:
    614
    عدد المعجبين:
    77
    مكان الإقامة:
    Ewell, Surrey
    Heritage Railway Volunteer:
    No I do not currently volunteer
    We’re going back to VIC diesel hauled, no Kent Coast direct via Ashford
     
  10. Deepgreen

    Deepgreen Well-Known Member Friend

    إنضم إلينا في:
    ‏30 جويلية 2010
    المشاركات:
    2,099
    عدد المعجبين:
    1,403
    الجنس:
    ذكر
    الوظيفة:
    Early retirement! (Ex-Business Improvement, LU).
    مكان الإقامة:
    Gomshall, Surrey
    Heritage Railway Volunteer:
    No I do not currently volunteer
    So, given your experience, which do you think happened, given that hand sanding was being done for over an hour on a 1 in 60 climb in damp conditions in peak leaf fall season with a significantly overloaded train?
    So has 70000 has been detached, or is it running in light steam in the train? What a shame for the passengers, and a setback for 'Saphos', one assumes.
     
  11. Dan Hamblin

    Dan Hamblin Part of the furniture

    إنضم إلينا في:
    ‏27 مارس 2006
    المشاركات:
    2,549
    عدد المعجبين:
    190
    الوظيفة:
    Rolling Stock Engineer
    مكان الإقامة:
    Kent
    Thanks Phil, such a shame the tour turned out this way. Hopefully you'll all be back at Victoria as soon as possible.

    Regards,

    Dan
     
  12. torgormaig

    torgormaig Part of the furniture Friend

    إنضم إلينا في:
    ‏17 جويلية 2007
    المشاركات:
    4,908
    عدد المعجبين:
    7,664
    I don't think it is that simple at all, but hay..... what do I know about charter operations on the main line? These things are not as black and white as some on Nat Pres would have you believe.

    Peter
     
    Haighie, Oswald T Wistle, Paul42 و 2 آخرون معجبون بهذا.
  13. Phil K

    Phil K Member

    إنضم إلينا في:
    ‏8 سبتمبر 2005
    المشاركات:
    614
    عدد المعجبين:
    77
    مكان الإقامة:
    Ewell, Surrey
    Heritage Railway Volunteer:
    No I do not currently volunteer
    no , she’s on the rear. Shed is on the front.
     
  14. Deepgreen

    Deepgreen Well-Known Member Friend

    إنضم إلينا في:
    ‏30 جويلية 2010
    المشاركات:
    2,099
    عدد المعجبين:
    1,403
    الجنس:
    ذكر
    الوظيفة:
    Early retirement! (Ex-Business Improvement, LU).
    مكان الإقامة:
    Gomshall, Surrey
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Oh, the ignominy!
     
  15. Chris_Sav

    Chris_Sav Member

    إنضم إلينا في:
    ‏15 مارس 2013
    المشاركات:
    243
    عدد المعجبين:
    162
    الجنس:
    ذكر
    الوظيفة:
    Out To Pasture
    مكان الإقامة:
    Great Mongeham
    Just left CBW 193 late
     
  16. mrKnowwun

    mrKnowwun Part of the furniture

    إنضم إلينا في:
    ‏22 اكتوبر 2011
    المشاركات:
    4,366
    عدد المعجبين:
    2,823
    الوظيفة:
    Retired
    مكان الإقامة:
    West Byfleet
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The Iron Drag
     
    أعجب بهذه المشاركة A1X
  17. Deepgreen

    Deepgreen Well-Known Member Friend

    إنضم إلينا في:
    ‏30 جويلية 2010
    المشاركات:
    2,099
    عدد المعجبين:
    1,403
    الجنس:
    ذكر
    الوظيفة:
    Early retirement! (Ex-Business Improvement, LU).
    مكان الإقامة:
    Gomshall, Surrey
    Heritage Railway Volunteer:
    No I do not currently volunteer
    OK, fair enough. Let's assume everything so far expounded, including by me, is wrong. Is it therefore possible definitively to establish:
    1. Which organisation has the final say on what train weight is allowed to run on specific routes with which unassisted motive power unit (loco),
    2. What rules exist within that organisation's structure for approving requests from operators,
    3. What seasonal sub-rules exist, i.e. autumn workings?

    Of course, this may be a longer project than is appropriate for this specific thread. If it is not possible to establish the above three points, given the range of expertise in main line running on the forum, then that may be an indicator of where the fundamental problem lies.
     
    أعجب بهذه المشاركة Sheff
  18. Deepgreen

    Deepgreen Well-Known Member Friend

    إنضم إلينا في:
    ‏30 جويلية 2010
    المشاركات:
    2,099
    عدد المعجبين:
    1,403
    الجنس:
    ذكر
    الوظيفة:
    Early retirement! (Ex-Business Improvement, LU).
    مكان الإقامة:
    Gomshall, Surrey
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Given the nickname of the county of Kent - The Garden Shed!
     
    A1X و Jamessquared معجبون بهذا.
  19. andrewtoplis

    andrewtoplis Well-Known Member

    إنضم إلينا في:
    ‏28 مارس 2006
    المشاركات:
    1,419
    عدد المعجبين:
    878
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    This cannot be laid solely at the door of NR.

    The TOC has a responsibility to bid a path that works and to provide a train that can run within it.

    Providing a train that is overloaded and runs into problems is in no one's interests and will spread delays to other network users.
     
  20. Deepgreen

    Deepgreen Well-Known Member Friend

    إنضم إلينا في:
    ‏30 جويلية 2010
    المشاركات:
    2,099
    عدد المعجبين:
    1,403
    الجنس:
    ذكر
    الوظيفة:
    Early retirement! (Ex-Business Improvement, LU).
    مكان الإقامة:
    Gomshall, Surrey
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Yes, but, I ask again, who approves the bid? What criteria are used by that approver to decide whether to approve or not? Who controls the network and the juxtaposition of trains on it? Does the approver just take the bidder's word for it that the train proposed can perform, or is there a detailed and specific checking mechanism?
     

مشاركة هذه الصفحة