LMS Patriot Project Updates

Discuție în 'Steam Traction' creată de Gav106, 10 Apr 2011.

  1. crantock

    crantock Member

    Înscris:
    22 Noi 2008
    Mesaje:
    528
    Aprecieri primite:
    276
    Sex:
    Masculin
    Ocupație:
    Beancounter
    Locație:
    Birmingham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If the foundry has cast 6 out of 6 failures, isn’t there a risk they decide its beyond their ability? I suppose its a question of 1 mistake 6 times or multiple mistakes.


    Sent from my iPhone using Tapatalk
     
  2. Davo

    Davo Well-Known Member

    Înscris:
    12 Oct 2018
    Mesaje:
    1.539
    Aprecieri primite:
    649
    Sex:
    Masculin
    Locație:
    W yorkshire 56f
    Heritage Railway Volunteer:
    No I do not currently volunteer
    So now is this true what im hearing are the LMS patriot project saying that all the components on the loco frames are going to have to be stripped down just to check to see if the frames dont have any cracks or wrong diameter sized bolts like what was found holding the cylinders in place on the frames? It just gets better and better all the disheartening news were hearing about the pat project at this rate it's going to be 10 years when the 5551 loco turns its wheels in anger, think I'm quitting been a member and a donator to this failed new build project. Best of british luck and engineering expertise to the 5551 LMS pat project cos there going to need it at this rate and lose more members trust sorry to say.:(:mad: even:Morewaitingisrequired:
     
  3. estwdjhn

    estwdjhn Member

    Înscris:
    24 Ian 2013
    Mesaje:
    342
    Aprecieri primite:
    693
    Ocupație:
    Boilermaker
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think six pretty much identical failures almost certainly means an issue with the pattern/mould design. Not necessarily a big one - often this sort of issue merely requires an extra riser or feeder and it's sorted - good patternmakers/foundrymen will usually size up the failures and have a pretty good idea what is needed to get a better result next time.
    There is an element of random luck to castings, but there is a certain sort of repeatability too, good and bad.

    I'd imagine that they cast the first one, had it X-rayed, and when it was signed off as OK proceeded to do the others - had there been issues found on X-ray, things would have been altered before attempting the next one.

    If the X-ray was ordered to an appropriate specification etc, I would think that the NDT firm which did the work are liable to be in a lot of hot water. That said, I'm surprised that X-ray was felt to be appropriate for a casting of this size.
    I had some issues with unwanted voids appearing in some much smaller steel castings. The problem area was a solid round section about 2" diameter and 3.5" long. When I took some samples round, my local NDT outfit said that this was on the limits of what they could penetrate with their X-ray source and get meaningful results (what they found was actually very helpful in diagnosing the problem).
    I would have thought that the boss area of a mainline wheel would be too thick to get useful results by X-ray - but I may be wrong, it's not my area of expertise.
     
    Steve și Monkey Magic apreciază asta.
  4. bluetrain

    bluetrain Well-Known Member

    Înscris:
    3 Mar 2019
    Mesaje:
    1.561
    Aprecieri primite:
    1.584
    Sex:
    Masculin
    Locație:
    Wiltshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A prior post also indicated that the main frames were delivered as long ago as 2009.

    A question for a reader with legal knowledge. How long is there a liability for a supplier to provide replacement or compensation for defective products? My understanding is that it is 6 years for a contract under English Law, in which case the Patriot project may have already lost any legal entitlement in respect of parts delivered or work undertaken prior to 2015. Suppliers may of course still accept liability for earlier defective work and make ex-gratia payments, but that would be voluntary.

    There may also be the question of proving that recently discovered defects were wholly present in 2009, 2012 or whenever, and have not been worsened by any corrosion during the intervening years.
     
  5. jnc

    jnc Well-Known Member

    Înscris:
    3 Apr 2012
    Mesaje:
    1.511
    Aprecieri primite:
    2.709
    Sex:
    Masculin
    Locație:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Could be a process failure, too. (E.g. cooling.)

    Noel
     
  6. osprey

    osprey Resident of Nat Pres

    Înscris:
    3 Oct 2007
    Mesaje:
    10.492
    Aprecieri primite:
    2.850
    Ocupație:
    semi-retired, currently doing R&D for my patents
    Locație:
    Halifax
    I can't answer that, as I have no knowledge or sight of the contract. If you have, all well and good. You are speaking with prior knowledge.
     
  7. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    Înscris:
    15 Apr 2006
    Mesaje:
    16.551
    Aprecieri primite:
    7.897
    Locație:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The wheel sets were not assembled at Llangollen.
     
    jnc apreciază asta.
  8. Gav106

    Gav106 Well-Known Member

    Înscris:
    29 Mar 2010
    Mesaje:
    1.772
    Aprecieri primite:
    2.170
    Locație:
    Nantwich, Cheshire
    I have to say, Reading half of what's written here you don't half make up some good stories and add 2+2 and come up with 732.
     
    Richard Roper, RalphW, 60017 și alți 5 apreciază asta.
  9. 2392

    2392 Well-Known Member

    Înscris:
    7 Iun 2010
    Mesaje:
    1.902
    Aprecieri primite:
    1.148
    Sex:
    Masculin
    Locație:
    Felling on Tyne
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Whilst I quite agree Gav. It's all part and parcel of a forum like this........... Which is what makes it so interesting.
     
    Last edited: 23 Sep 2021
    Gav106 apreciază asta.
  10. marshall5

    marshall5 Part of the furniture

    Înscris:
    26 Oct 2010
    Mesaje:
    2.521
    Aprecieri primite:
    4.359
    Locație:
    i.o.m
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The same pattern was used to cast the replacement wheels for Galatea without a problem AFAIK .
    Ray.
     
    Richard Roper și jnc apreciază asta.
  11. Monkey Magic

    Monkey Magic Part of the furniture

    Înscris:
    6 Ian 2018
    Mesaje:
    3.498
    Aprecieri primite:
    6.845
    Locație:
    Here, there, everywhere
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If I have read correctly post appears to suggest that there was an independent inspector. Boro had an independent company verify the castings but the xrays they made were of such a poor quality that errors were not picked up.

    So if I have it right:

    Warrior accepted the wheels because they trusted Boro when Boro say the wheels have been verified independently, Boro trusted that the independent verifiers had done their job. It appears that the independent verifiers did not do their job properly.

    It seems to me to be a repeat of the FS report about the cottage industry, where everyone is dependent on others doing their job.
     
    Last edited: 22 Sep 2021
    andrewshimmin, 26D_M, Sheff și alți 4 apreciază asta.
  12. Jimc

    Jimc Part of the furniture

    Înscris:
    8 Sep 2005
    Mesaje:
    4.117
    Aprecieri primite:
    4.821
    Ocupație:
    Once computers, now part time writer I suppose.
    Locație:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That is kinda how civilisation works...
     
    69530, andrewshimmin, misspentyouth62 și alți 5 apreciază asta.
  13. Monkey Magic

    Monkey Magic Part of the furniture

    Înscris:
    6 Ian 2018
    Mesaje:
    3.498
    Aprecieri primite:
    6.845
    Locație:
    Here, there, everywhere
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Which is why you have a big f-ing problem when people don't.
     
    andrewshimmin apreciază asta.
  14. jnc

    jnc Well-Known Member

    Înscris:
    3 Apr 2012
    Mesaje:
    1.511
    Aprecieri primite:
    2.709
    Sex:
    Masculin
    Locație:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I'm sure you've been upset to discover that humans aren't perfect, but fallible beings.

    Look, I get that it's been very upsetting and disheartening to discover that major mistakes were made (in some cases, apparently through lack of knowledge, such as the frame de-scaling; the wheels, we're waiting on more investigation), and that as a result, there will be delays, more work, and more expense. But, as the man said, "to err is human".

    The important questions are 'has the team building the Warrior made internal changes to greatly reduce the chances of similar problems in the future' (yes, done quite a while ago), and 'is there a viable path forward to recovery and eventual success' (apparently yes, the details are being worked out).

    As @35B said, 'look forward, not back'.

    Noel
     
    Last edited: 25 Sep 2021
    Spinner, Richard Roper, MellishR și alți 10 apreciază asta.
  15. Sheff

    Sheff Resident of Nat Pres

    Înscris:
    21 Apr 2006
    Mesaje:
    8.057
    Aprecieri primite:
    3.137
    Sex:
    Masculin
    Ocupație:
    Retired Engineer & Heritage Volunteer
    Locație:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Sorry I didn’t make myself clear there. Yes the inspector was ‘independent’ but they were engaged by, and reported to, the manufacturer, not the client.


    Sent from my iPhone using Tapatalk
     
    andrewshimmin, jnc, Monkey Magic și alți 2 apreciază asta.
  16. 35B

    35B Nat Pres stalwart

    Înscris:
    18 Iun 2011
    Mesaje:
    28.731
    Aprecieri primite:
    28.657
    Sex:
    Masculin
    Locație:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Fair comment, but I think the FS report comment, and what it says about the structural weaknesses of preservation engineering, still stands.
     
    jnc apreciază asta.
  17. W.Williams

    W.Williams Well-Known Member

    Înscris:
    20 Dec 2015
    Mesaje:
    1.650
    Aprecieri primite:
    1.559
    Ocupație:
    Mechanical Engineer
    Locație:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Manifestly not.

    Tornado, P2, a certain pair of Black 5's West Shed, SNG, Clan Line, Aviemore are just a few examples of highly professional engineering, without any caveat required. Preservation or otherwise.

    You can X-Ray a whole Trent XWB if you have the means, going rate is about £150m. See Rolls-Royce recently opened Test Bed 80.

    I too am surprised X-Ray was the NDT of choice here. I would have though DPI per above update was the initial default position.

    Is it not the case that for X-Ray you really need to put it in a box....a wheel isn't exactly small....

    Then again, whats the point in asking any of this.

    Boro have a reputation that I suspect they may like to uphold and it sounds like they are engaged and collaborating.

    That is the method by which you get through these issues.
     
    Richard Roper, ghost, Sheff și alți 3 apreciază asta.
  18. jnc

    jnc Well-Known Member

    Înscris:
    3 Apr 2012
    Mesaje:
    1.511
    Aprecieri primite:
    2.709
    Sex:
    Masculin
    Locație:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Hmm. If so, not an issue with the pattern (unless it was tweaked in between); and if not, had to be something in the process (maybe the temp of the liquid material before it was poured, or the cooling, or something like that), or perhaps some detail in the composition of the material (my knowledge of casting is close to zilch ;-). Well, I'm happy to wait for the experts at Boro to work out what the issue was.

    Does anyone happen to know where Galatea's wheels were cast? Even if it was at Boro, they may have had some person with key knowledge retire, or something. (For casting 4709's cylinders, some techniques had to be re-developed - "the team re-engineered the casting process for steam cylinders with poly patterns from first principles" - although there the issue apparently was centered on the use of poly patterns.)

    Noel
     
    misspentyouth62 apreciază asta.
  19. 35B

    35B Nat Pres stalwart

    Înscris:
    18 Iun 2011
    Mesaje:
    28.731
    Aprecieri primite:
    28.657
    Sex:
    Masculin
    Locație:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Indeed they are. But that is in the context of what that report described as a cottage industry, and where the supply chain lacks strength in depth. It has limited capacity for that supply chain to absorb the impact of mistakes, and limited numbers of volunteers, expert or otherwise.

    That is not a criticism of any individuals, but a reflection on just how much has been achieved on very limited resources over the last 60 years or so.

    I would love to see this problem attributed back to cause, and suitable remedies applied. But, especially given the time that’s passed, that’s both unrealistic and would require a shift of focus from progressing the project to fighting a compensation case. That won’t help get Unknown Warrior built, and could even jeopardise the project further.


    Sent from my iPad using Tapatalk
     
  20. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    Înscris:
    31 Aug 2010
    Mesaje:
    5.615
    Aprecieri primite:
    9.418
    Sex:
    Masculin
    Ocupație:
    Asset Engineer (Signalling), MNLPS Treasurer
    Locație:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Most kind, but the caveat I would put in is that we are only as strong as our engineering volunteers: of which we at MNLPS are very lucky and have a great many excellent individuals led by our talented and experienced Messers Easson and Ellick.

    Getting good people is the issue for any charity/project/business: I feel strongly that the Patriot has suffered from compliance and inspection issues, based on my reading. These things are all largely fixable, if you put the right people in now and have a good plan.
     
    69530, Richard Roper, andrewshimmin și alți 3 apreciază asta.