If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

West Somerset Railway General Discussion

الموضوع في 'Heritage Railways & Centres in the UK' بواسطة gwr4090, بتاريخ ‏15 نوفمبر 2007.

  1. The Green Howards

    The Green Howards Nat Pres stalwart

    إنضم إلينا في:
    ‏20 فبراير 2016
    المشاركات:
    15,102
    عدد المعجبين:
    8,632
    الوظيفة:
    Layabout
    مكان الإقامة:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    "Know what [we are] doing". Wasn't Kimi Raikkonen famous for saying that?
     
  2. 6026 King John

    6026 King John Well-Known Member

    إنضم إلينا في:
    ‏10 نوفمبر 2006
    المشاركات:
    1,616
    عدد المعجبين:
    908
    مكان الإقامة:
    Hampton Court, Surrey
    Yes - but he went on the win that particular race if my memory serves me well!
     
    أعجب بهذه المشاركة The Green Howards
  3. granmaree

    granmaree Member

    إنضم إلينا في:
    ‏5 جوان 2015
    المشاركات:
    541
    عدد المعجبين:
    497
    Heritage Railway Volunteer:
    No I do not currently volunteer
    May 11th news on the plc page shows the update that went out on the Association website April 22nd ....
     
    أعجب بهذه المشاركة Pete Thornhill
  4. Pete Thornhill

    Pete Thornhill Resident of Nat Pres Staff Member Administrator Moderator Friend

    إنضم إلينا في:
    ‏24 جويلية 2008
    المشاركات:
    7,762
    عدد المعجبين:
    5,890
    Yes I actually saw that as they also finally thought it might be worth mentioning on Facebook as well. The time is obviously measured differently in Somerset ;)
     
    أعجب بهذه المشاركة Matt37401
  5. granmaree

    granmaree Member

    إنضم إلينا في:
    ‏5 جوان 2015
    المشاركات:
    541
    عدد المعجبين:
    497
    Heritage Railway Volunteer:
    No I do not currently volunteer
    You could always give him a ring
     
  6. johnofwessex

    johnofwessex Resident of Nat Pres

    إنضم إلينا في:
    ‏6 إبريل 2015
    المشاركات:
    9,748
    عدد المعجبين:
    7,858
    الجنس:
    ذكر
    الوظيفة:
    Thorn in my managers side
    مكان الإقامة:
    72
    Heritage Railway Volunteer:
    No I do not currently volunteer

    Send a telegram?
     
    acorb و Jamessquared معجبون بهذا.
  7. Greenway

    Greenway Part of the furniture

    إنضم إلينا في:
    ‏16 مارس 2008
    المشاركات:
    4,019
    عدد المعجبين:
    3,803
    الجنس:
    ذكر
    مكان الإقامة:
    South Hams
    Heritage Railway Volunteer:
    No I do not currently volunteer
    WSR does well with their appeal for the Coombe Florey landslip according to a report in Rail Advent.
     
  8. Greenway

    Greenway Part of the furniture

    إنضم إلينا في:
    ‏16 مارس 2008
    المشاركات:
    4,019
    عدد المعجبين:
    3,803
    الجنس:
    ذكر
    مكان الإقامة:
    South Hams
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Last edited: ‏15 ماي 2023
  9. mdewell

    mdewell Well-Known Member Friend

    إنضم إلينا في:
    ‏23 مارس 2005
    المشاركات:
    1,924
    عدد المعجبين:
    2,998
    الوظيفة:
    UK & Ireland Heritage Railways Webmaster
    مكان الإقامة:
    Ruabon, Wrexham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    أعجب بهذه المشاركة Greenway
  10. Greenway

    Greenway Part of the furniture

    إنضم إلينا في:
    ‏16 مارس 2008
    المشاركات:
    4,019
    عدد المعجبين:
    3,803
    الجنس:
    ذكر
    مكان الإقامة:
    South Hams
    Heritage Railway Volunteer:
    No I do not currently volunteer
    well Devon and Cornwall are different ha!ha!
     
  11. Bayard

    Bayard Well-Known Member

    إنضم إلينا في:
    ‏26 إبريل 2015
    المشاركات:
    1,841
    عدد المعجبين:
    3,904
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Na, Cymru wrth gwrs!
     
  12. Steve B

    Steve B Well-Known Member

    إنضم إلينا في:
    ‏20 جوان 2008
    المشاركات:
    2,167
    عدد المعجبين:
    1,579
    مكان الإقامة:
    Shropshire
    I've just noticed on the Minehead webcam that the 96xx is hauling trains today. Pardon me if I've got this wrong, but I thought that it was a "red" loco, and therefore too heavy for the majority of the WSR. Does this indicate some improvements somewhere?

    Steve B
     
  13. FrankC

    FrankC Member

    إنضم إلينا في:
    ‏27 ماي 2009
    المشاركات:
    472
    عدد المعجبين:
    2,139
    We now have a system where each locomotive is individually assessed against the critical weight "pinch points" on the railway. The former GWR system was broad brush to make sure there was minimal chance of anyone making mistakes in route selection. With increased engineering understanding of impact, only 20 or so route miles and a very small number of locomotives, it has become possible to undertake a much more detailed weight/impact assessment. So far as we can there is however a process of continual track and bridge improvement.
     
    أعجب بهذه المشاركة JBTEvans
  14. Steve B

    Steve B Well-Known Member

    إنضم إلينا في:
    ‏20 جوان 2008
    المشاركات:
    2,167
    عدد المعجبين:
    1,579
    مكان الإقامة:
    Shropshire
    Many thanks, and good news that such a useful loco can be used - quite a surprise to see it this morning

    Steve B
     
    Greenway و FrankC معجبون بهذا.
  15. ruddingtonrsh56

    ruddingtonrsh56 Well-Known Member

    إنضم إلينا في:
    ‏14 سبتمبر 2009
    المشاركات:
    1,180
    عدد المعجبين:
    1,812
    الجنس:
    ذكر
    مكان الإقامة:
    Nottinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A more cynical viewpoint some people take is is "JJP owns 9466 so he found a way to make an exception"
     
    Saint Austell و johnofwessex معجبون بهذا.
  16. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,788
    عدد المعجبين:
    64,441
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think that's a little churlish.

    The old mainline companies, responsible for thousands of miles of route and thousands of locomotives, clearly needed a relatively easy-to-apply system to define which locos could go where. The different companies did that in different ways, the GWR for example having a series of coloured codes painted on the cab sides of each type. The objective was to assist rapid decision making: you'd know in five seconds that a red loco couldn't go on a yellow route, without having to waste any time agonising over a decision. (But equally if there was an absolute need, you could work out the restrictions that might apply to allow an exceptional move to occur).

    For a heritage railway, the process is very different. Firstly, and most significantly, speeds are lower, which significantly reduces hammer blow. So in terms of dynamic load, what wouldn't be acceptable at 50mph becomes perfectly fine at 25mph. (And if need be, you can further restrict a loco, either in speed or in parts of the railway it can run. For example, on the Bluebell we are currently playing host to a Modified Hall; it comes with additional restrictions relative to, say, a similarly-sized BR Std 5, notably that it is limited to 5mph through platforms, and is prohibited entirely from passing between platforms 4 and 5 at Horsted Keynes. That sort of restriction is relatively easy to manage on a heritage railway without causing significant operational problems).

    The other significant difference between pre-pre-preseveration and preservation practice is that the use of "foreign" locos is more widespread in heritage service. Those foreign locos wouldn't have GWR-style route classifications anyway, so in practical terms you pretty well have to make individual decisions about individual locos every time a new one visits the line. If you are doing that, it is hardly more onerous to look at a loco like a 94xx that has the possibility of being a long-term resident as it would be to look at an individual loco booked to arrive and depart on a visiting rail tour. Once you've made the decision, you don't need to keep re-making it unless something significant changes in your assessment of the standard of the infrastructure.

    So in the current case, I don't see any reason not to believe the statement made by @FrankC, i.e. that locos are treated on an individual terms based on specific knowledge of the likely places of issue on the infrastructure.

    Tom
     
    Last edited: ‏30 ماي 2023
  17. 35B

    35B Nat Pres stalwart

    إنضم إلينا في:
    ‏18 جوان 2011
    المشاركات:
    28,729
    عدد المعجبين:
    28,654
    الجنس:
    ذكر
    مكان الإقامة:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Not to mention that, under the regulations that railways now fall under, the decision to permit that locomotive to operate would need to be documented as within the rules - rules which @FrankC noted exist and have been applied to 9466. A locomotive owner or railway chairman would need to be very brave or foolhardy to go outside that documented assessment process, especially where the locomotive is widely known to be "heavy" for the line in question and the railway has been on the receiving end of ORR investigations.
     
    أعجب بهذه المشاركة MellishR
  18. Pete Thornhill

    Pete Thornhill Resident of Nat Pres Staff Member Administrator Moderator Friend

    إنضم إلينا في:
    ‏24 جويلية 2008
    المشاركات:
    7,762
    عدد المعجبين:
    5,890
    The same logic would have been applied to allow 2999 to run at the recent gala, previously of course 6960 couldn't run on the line which is why it went to the SVR so it hasn't been applied to only one engine. Will be interesting to see if 4936 can operate when it's overhaul is completed.
     
    Hampshire Unit و Greenway معجبون بهذا.
  19. Robin Moira White

    Robin Moira White Resident of Nat Pres

    إنضم إلينا في:
    ‏27 إبريل 2014
    المشاركات:
    11,404
    عدد المعجبين:
    18,231
    الجنس:
    أنثي
    الوظيفة:
    Barrister
    مكان الإقامة:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Tom is, of course, right and sensible as usual. In my BR days I was involved in moves of out-of-specification loads like transformers which had to specially assessed.

    9466 may well be fine over Black Monkey Bridge (the line’s ‘ruling’ structure) but its the ‘optics’ of the thing which don’t seem to have been well handled.

    Caesar’s wife and all that.
     
    أعجب بهذه المشاركة MellishR
  20. Saint Austell

    Saint Austell New Member

    إنضم إلينا في:
    ‏3 فبراير 2022
    المشاركات:
    43
    عدد المعجبين:
    23
    مكان الإقامة:
    Cornwall
    Heritage Railway Volunteer:
    No I do not currently volunteer
    You've hit the nail on the head there, like 50008 which was coming to the diesel gala, is the same weight as 47840 which was deemed too heavy and moved on loan to North York Moors railway.

    Seems like they are playing fast and loose with what can and can't run.
     

مشاركة هذه الصفحة